MONTHYEARML24032A0252024-02-0505 February 2024 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026-2023009 ML24031A6102024-01-31031 January 2024 Cyber Security Inspection Report 05200026/2024401 - Public IR 05000424/20244032024-01-26026 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000424/2024403; 05000425/2024403 ML23312A3502023-11-14014 November 2023 Integrated Inspection Report 05200026/2023003 ML23318A4582023-11-14014 November 2023 Integrated Inspection Report 05200025/2023003 IR 05000424/20234022023-11-0606 November 2023 Security Baseline Inspection Report 05000424/2023402 and 05000425/2023402 IR 05000424/20230032023-10-27027 October 2023 Integrated Inspection Report 05000424/2023003 and 05000425/2023003 ML23254A2032023-09-13013 September 2023 Initial Test Program and Operational Programs Inspection Report 05200025/2023013 IR 05000424/20230912023-09-0505 September 2023 Plan Units 1 and 2 - NRC Investigation Report 2-2022-006 and Notice of Violation - NRC Inspection Report 05000424/2023091 and 05000425/2023091 ML23234A3002023-09-0101 September 2023 NRC Integrated Inspection Report 05200026/2023003 IR 05000424/20230052023-08-29029 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2023005 and 05000425/2023005 ML23223A0022023-08-14014 August 2023 (Vegp), Unit 3, Integrated Inspection Report 05200025/2023002 IR 05000424/20230112023-08-11011 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000424/2023011 and 05000425/2023011 ML23215A0822023-08-0404 August 2023 (Vego), Unit 3 Initial Test Program and Operational Programs Integrated 05200025/2023011 Inspection Report IR 05000424/20234012023-07-31031 July 2023 Security Baseline Inspection Report 05000424/2023401 and 05000425/2023401 (Cover Letter) ML23212B0612023-07-31031 July 2023 Security Baseline Inspection Report 05200025/2023401 ML23216A0962023-07-26026 July 2023 Document Request for Vogtle 1 & 2 RP Inspection, Report No. 05000424/2023003 and 05000425/2023003 IR 05000424/20230022023-07-24024 July 2023 Integrated Inspection Report 05000424/2023002 and 05000425/2023002 ML23198A3802023-07-19019 July 2023 NRC Integrated Inspection Report 05200026/2023002 ML23199A0892023-07-18018 July 2023 (Vegp), Unit 4 Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2023007 IR 05000424/20233012023-06-30030 June 2023 NRC Operator License Examination Report 05000424/2023301 and 05000425/2023301 ML23128A2932023-05-11011 May 2023 NRC Integrated Inspection Report 05200026/2023001 ML23129A0222023-05-10010 May 2023 (Vegp), Unit 3 - Integrated Report 05200025/2023001 ML23128A3492023-05-0909 May 2023 (Vegp), Unit 4 Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2023006 ML23121A3202023-05-0404 May 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2023010 IR 05000424/20040252023-04-28028 April 2023 Public Meeting Summary - Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 5000424, 5000425, 5200025, 5200026, Meeting Number 20230375 IR 05000424/20230012023-04-26026 April 2023 Integrated Inspection Report 05000424/2023001 and 05000425/2023001 IR 05000424/20230902023-03-30030 March 2023 NRC Inspection Report 05000424/2023090 and 05000425/2023090, and Investigation Report 2-2022-006; and Apparent Violation ML23083B3702023-03-24024 March 2023 Security Baseline Inspection Report 05200026/2023401 IR 05000424/20220062023-03-0101 March 2023 Annual Assessment Letter for Vogtle Electric Generating Plant Units 1 and 2, NRC Inspection Reports 05000424/2022006 and 05000425/2022006 ML23044A3902023-02-14014 February 2023 Integrated Inspection Report05200025 2022007 ML23040A3612023-02-0909 February 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2022008 ML23040A0422023-02-0909 February 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2022008 ML23033A3972023-02-0707 February 2023 NRC Integrated Inspection Report 05200026/2022007 IR 05000424/20220042023-01-23023 January 2023 Integrated Inspection Report 05000424/2022004 and 05000425/2022004 ML22356A2932022-12-23023 December 2022 Information Request for the Cyber Security Baseline Security Inspection, Notification to Perform Inspection IR 05000424/20220102022-12-0202 December 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000424/2022010 and 05000425/2022010 ML22327A0532022-11-30030 November 2022 Security Baseline Inspection Report 05200026/2022401 Cover Letter IR 05000424/20224032022-11-28028 November 2022 Security Baseline Inspection Report 05000424/2022403 and 05000425/2022403 (Cover Letter) ML22314A0702022-11-14014 November 2022 NRC Integrated Inspected Reports 05200025/2022005, 05200026/2022005 ML22318A1602022-11-14014 November 2022 Integrated Inspection Report 05200025/2022010 ML22304A1812022-11-0808 November 2022 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2022011 ML22311A0062022-11-0808 November 2022 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2022006 IR 05000424/20220032022-10-27027 October 2022 Integrated Inspection Report 05000424/2022003 and 05000425/2022003 IR 05000424/20220052022-08-24024 August 2022 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2022005 and 05000425/2022005 ML22230C6702022-08-22022 August 2022 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2022006 ND-22-0655, ITAAC Closure Notification on Completion of ITAAC 2.5.01.03a (Index Number 511)2022-08-12012 August 2022 ITAAC Closure Notification on Completion of ITAAC 2.5.01.03a (Index Number 511) IR 05000424/20220022022-08-11011 August 2022 Integrated Inspection Report 05000424/2022002 and 05000425/2022002 ML22220A1342022-08-0909 August 2022 Review of the Refueling Outage 1R23 (Fall 2021) Steam Generator Tube Inspection Report IR 05000424/20224012022-08-0404 August 2022 Cyber Security Inspection Report 05000424/2022401 and 05000425/2022401 2024-02-05
[Table view] Category:Letter type:NL
MONTHYEARNL-24-0031, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R23 NL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error NL-23-0878, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 NL-23-0750, Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr2023-10-0404 October 2023 Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report2023-09-22022 September 2023 Refueling Outage 1R24 Steam Generator Tube Inspection Report NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2) NL-23-0666, License Amendment Request: Remove Combined License Appendix C (LAR 23-008)2023-08-28028 August 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-008) NL-23-0670, Response to Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-144832023-08-11011 August 2023 Response to Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0672, Licensee Guarantees of Payment of Deferred Premiums2023-08-10010 August 2023 Licensee Guarantees of Payment of Deferred Premiums NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0611, Core Operating Limits Report, Cycle 11 Version 12023-07-19019 July 2023 Core Operating Limits Report, Cycle 11 Version 1 NL-23-0584, Preservice Inspection Program Owner'S Activity Report2023-07-10010 July 2023 Preservice Inspection Program Owner'S Activity Report NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications NL-23-0541, Inservice Inspection Program Owners Activity Report for Outage 1R242023-06-28028 June 2023 Inservice Inspection Program Owners Activity Report for Outage 1R24 NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0339, Response to Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters - Operating, Completion Time Extension (LAR-22-002S1)2023-06-13013 June 2023 Response to Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters - Operating, Completion Time Extension (LAR-22-002S1) NL-23-0455, Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report2023-06-12012 June 2023 Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report NL-23-0467, Response to Request for Additional Information Regarding License Amendment Request: Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005S1)2023-06-0909 June 2023 Response to Request for Additional Information Regarding License Amendment Request: Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005S1) NL-23-0346, License Amendment Request for Exception to Regulatory Guide 1.163 (LAR 23-007)2023-05-25025 May 2023 License Amendment Request for Exception to Regulatory Guide 1.163 (LAR 23-007) NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0385, License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1)2023-05-17017 May 2023 License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1) NL-23-0398, Withdrawal of Request of License Amendment Request Regarding More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006)2023-05-16016 May 2023 Withdrawal of Request of License Amendment Request Regarding More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006) NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0360, Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel2023-05-0505 May 2023 Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel NL-23-0326, Response to Apparent Violation in NRC Inspection Report 05000424, 425/2023090; EA-22-1082023-05-0101 May 2023 Response to Apparent Violation in NRC Inspection Report 05000424, 425/2023090; EA-22-108 NL-23-0217, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.4.14.1 and Proposed Inservice Testing Alternative ALT-VR-022023-05-0101 May 2023 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.4.14.1 and Proposed Inservice Testing Alternative ALT-VR-02 NL-23-0330, Core Operating Limits Report, Cycle 25, Version 12023-04-26026 April 2023 Core Operating Limits Report, Cycle 25, Version 1 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0135, License Amendment Request: Timing of Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005)2023-04-17017 April 2023 License Amendment Request: Timing of Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005) NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0152, License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-144832023-04-11011 April 2023 License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0136, License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006)2023-04-0505 April 2023 License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006) NL-23-0132, License Amendment Request: Remove Combined License Appendix C (LAR 23-001)2023-04-0404 April 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-001) NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0193, Request for License Amendment: Relocation of TS 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003)2023-03-24024 March 2023 Request for License Amendment: Relocation of TS 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) NL-23-0196, Response to Request for Additional Information Regarding License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-4902023-03-24024 March 2023 Response to Request for Additional Information Regarding License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-490 NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-22-0977, License Amendment Request to Modify Technical Specification 5.5.11.c Acceptance Criteria for Charcoal Filter Testing2023-02-0909 February 2023 License Amendment Request to Modify Technical Specification 5.5.11.c Acceptance Criteria for Charcoal Filter Testing NL-23-0010, Response to Request for Additional Information Regarding License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-4902023-02-0606 February 2023 Response to Request for Additional Information Regarding License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-490 NL-23-0076, Exigent License Amendment Request: Technical Specification Exceptions for In-containment Refueling Water Storage Tank Operability Prior to Initial Criticality (LAR-23-004)2023-01-31031 January 2023 Exigent License Amendment Request: Technical Specification Exceptions for In-containment Refueling Water Storage Tank Operability Prior to Initial Criticality (LAR-23-004) NL-23-0013, Response to Request for Additional Information Related to 10CFR 50.75 Decommissioning Funding Assurance Requirements2023-01-30030 January 2023 Response to Request for Additional Information Related to 10CFR 50.75 Decommissioning Funding Assurance Requirements NL-23-0068, Responses to NRC Request for Additional Information Related to the Refueling Outage 2R22 Steam Generator Tube Inspection Report2023-01-27027 January 2023 Responses to NRC Request for Additional Information Related to the Refueling Outage 2R22 Steam Generator Tube Inspection Report NL-23-0012, Post-Audit Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel2023-01-20020 January 2023 Post-Audit Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel 2024-01-29
[Table view] |
Text
Don E.Grissette Southern Nuclear Vice President Operating Company, Inc.
40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.6474 Fax 205.992.0341 SOUTHERN NA June 6, 2005 COMPANY Energy to Serve Your World' Docket No.: 50-424 NL-05-0923 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Results of Inspections Required by NRC Bulletin 2004-01 and First Revised NRC Order EA-03-009 Ladies and Gentlemen:
On February 20, 2004, the NRC issued the First Revised NRC Order EA-03-009 to establish interim inspection requirements for reactor pressure vessel (RPV) heads at pressurized water reactors. On March 8, 2004, Southern Nuclear Operating Company (SNC) submitted an answer to the revised order which included a request for relaxation of the Order pursuant to the provisions of Paragraph IV.F. SNC completed visual inspections to identify potential boric acid leaks from pressure-retaining components above the RPV head as required by paragraph IV.D of the Order during the recent spring 2005 refueling outage (IR12) at Unit 1 of the Vogtle Electric Generating Plant (VEGP-l).
This report provides the results of the inspection as required by Paragraph IV.E of the Order. This letter also reports the results of inspection of Alloy 82/182/600 materials used in the fabrication of pressurizer nozzle penetrations as requested by NRC Bulletin 2004-01.
Examinations Required by the First Revised NRC Order EA-03-009, Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors:
As required by paragraph IV.A of the Order, SNC calculated the Effective Degradation Year (EDY) value at the start of IR12 for VEGP-1. The current EDY value is 3.01 years which places VEGP-I into the Low (EDY <8) category for susceptibility to primary water stress corrosion cracking (PWSCC) established by Paragraph IV.B. The susceptibility category determines the required examinations and timing of those examinations. As reported by SNC's December 19, 2003 letter, SNC completed a bare metal visual (BMV) examination of >99% of the RPV top head surface including 3600 around each RPV head penetration nozzle during the fall 2003 refueling outage (IRI I) at VEGP- 1. This examination satisfied the requirements of Paragraph IV(C)(3) of the Order consistent with SNC's request for relaxation. The relaxation request proposed to achieve substantial compliance with the 100% BMV examination requirement of Paragraph IV.C.(5)(a) by conducting a BMV examination of the RPV to the extent accessible. The inspection requirement of Paragraph IV.D was required to be performed on the RPV top head during IR12. 6i10
U. S. Nuclear Regulatory Commission NL-05-0923 Page 2 Inspection Results:
Boron residue was observed during the visual inspections on the RPV top head and a "general" visual inspection was performed with insulation panels removed from the closure head. No evidence of head material wastage or of leaking or cracked nozzles was found. The boron residue was determined to be associated with previous cleaning/decontamination efforts of conoseals and not associated with new "active" leakage. The areas below the conoseals were cleaned and reinspected during Mode 3 startup with no leakage observed.
Documentation:
The examination was documented by a written report.
Examinations Required by Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Nozzle Penetrations and Steam Space Connections at Pressurized Water Reactors:
A BMV examination was performed on four 6" SafetylRelief Nozzles (Numbers 11201-V6-002-W17, 18, 19, and 20) and one 4" Spray Nozzle (Number 1 201-V6-002-W21).
In addition, an Appendix VIII volumetric examination was performed on the 4" Spray Nozzle (Number 11201-V6-002-W21).
Inspection Results:
No evidence of material wastage or of leaking or cracked nozzles was found by BMV examinations.
Examination coverage of 100% was achieved in the performance of the volumetric examination of the 4" Spray Nozzle with no recordable indications.
Documentation:
The examinations performed were documented by a written report.
U. S. Nuclear Regulatory Commission NL-05-0923 Page 3 Mr. D. E. Grissette states he is a Vice President of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company, and to the best of his knowledge and belief, the facts set forth in this letter are true.
This letter contains no NRC commitments. If you have any questions, please advise.
Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY Don E. Grissette Sworn to and subscribedbefore me this /day of ,
(- +/- . 2005.
Notary Public My commission expires:
DEG/DRG/daj cc: Southern Nuclear Operating Companv Mr. J. T. Gasser, Executive Vice President Mr. W. F. Kitchens, General Manager - Plant Vogtle RType: CVC7000 U. S. Nuclear Regulatorv Commission Dr. W. D. Travers, Regional Administrator Mr. C. Gratton, NRR Project Manager - Vogtle Mr. G. J. McCoy, Senior Resident Inspector - Vogtle State of Georgia Mr. L. C. Barrett, Commissioner - Department of Natural Resources
Text
Don E.Grissette Southern Nuclear Vice President Operating Company, Inc.
40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.6474 Fax 205.992.0341 SOUTHERN NA June 6, 2005 COMPANY Energy to Serve Your World' Docket No.: 50-424 NL-05-0923 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Results of Inspections Required by NRC Bulletin 2004-01 and First Revised NRC Order EA-03-009 Ladies and Gentlemen:
On February 20, 2004, the NRC issued the First Revised NRC Order EA-03-009 to establish interim inspection requirements for reactor pressure vessel (RPV) heads at pressurized water reactors. On March 8, 2004, Southern Nuclear Operating Company (SNC) submitted an answer to the revised order which included a request for relaxation of the Order pursuant to the provisions of Paragraph IV.F. SNC completed visual inspections to identify potential boric acid leaks from pressure-retaining components above the RPV head as required by paragraph IV.D of the Order during the recent spring 2005 refueling outage (IR12) at Unit 1 of the Vogtle Electric Generating Plant (VEGP-l).
This report provides the results of the inspection as required by Paragraph IV.E of the Order. This letter also reports the results of inspection of Alloy 82/182/600 materials used in the fabrication of pressurizer nozzle penetrations as requested by NRC Bulletin 2004-01.
Examinations Required by the First Revised NRC Order EA-03-009, Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors:
As required by paragraph IV.A of the Order, SNC calculated the Effective Degradation Year (EDY) value at the start of IR12 for VEGP-1. The current EDY value is 3.01 years which places VEGP-I into the Low (EDY <8) category for susceptibility to primary water stress corrosion cracking (PWSCC) established by Paragraph IV.B. The susceptibility category determines the required examinations and timing of those examinations. As reported by SNC's December 19, 2003 letter, SNC completed a bare metal visual (BMV) examination of >99% of the RPV top head surface including 3600 around each RPV head penetration nozzle during the fall 2003 refueling outage (IRI I) at VEGP- 1. This examination satisfied the requirements of Paragraph IV(C)(3) of the Order consistent with SNC's request for relaxation. The relaxation request proposed to achieve substantial compliance with the 100% BMV examination requirement of Paragraph IV.C.(5)(a) by conducting a BMV examination of the RPV to the extent accessible. The inspection requirement of Paragraph IV.D was required to be performed on the RPV top head during IR12. 6i10
U. S. Nuclear Regulatory Commission NL-05-0923 Page 2 Inspection Results:
Boron residue was observed during the visual inspections on the RPV top head and a "general" visual inspection was performed with insulation panels removed from the closure head. No evidence of head material wastage or of leaking or cracked nozzles was found. The boron residue was determined to be associated with previous cleaning/decontamination efforts of conoseals and not associated with new "active" leakage. The areas below the conoseals were cleaned and reinspected during Mode 3 startup with no leakage observed.
Documentation:
The examination was documented by a written report.
Examinations Required by Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Nozzle Penetrations and Steam Space Connections at Pressurized Water Reactors:
A BMV examination was performed on four 6" SafetylRelief Nozzles (Numbers 11201-V6-002-W17, 18, 19, and 20) and one 4" Spray Nozzle (Number 1 201-V6-002-W21).
In addition, an Appendix VIII volumetric examination was performed on the 4" Spray Nozzle (Number 11201-V6-002-W21).
Inspection Results:
No evidence of material wastage or of leaking or cracked nozzles was found by BMV examinations.
Examination coverage of 100% was achieved in the performance of the volumetric examination of the 4" Spray Nozzle with no recordable indications.
Documentation:
The examinations performed were documented by a written report.
U. S. Nuclear Regulatory Commission NL-05-0923 Page 3 Mr. D. E. Grissette states he is a Vice President of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company, and to the best of his knowledge and belief, the facts set forth in this letter are true.
This letter contains no NRC commitments. If you have any questions, please advise.
Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY Don E. Grissette Sworn to and subscribedbefore me this /day of ,
(- +/- . 2005.
Notary Public My commission expires:
DEG/DRG/daj cc: Southern Nuclear Operating Companv Mr. J. T. Gasser, Executive Vice President Mr. W. F. Kitchens, General Manager - Plant Vogtle RType: CVC7000 U. S. Nuclear Regulatorv Commission Dr. W. D. Travers, Regional Administrator Mr. C. Gratton, NRR Project Manager - Vogtle Mr. G. J. McCoy, Senior Resident Inspector - Vogtle State of Georgia Mr. L. C. Barrett, Commissioner - Department of Natural Resources