|
---|
Category:Letter
MONTHYEARML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000313/20234052023-12-12012 December 2023 Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle IR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 IR 05000313/20230022023-08-11011 August 2023 Integrated Inspection Report 05000313/2023002 and 05000368/2023002 and Notice of Violation ML23209A6022023-08-0909 August 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 ML23208A2132023-08-0303 August 2023 Regulatory Audit Summary Concerning Review of License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23188A1732023-07-12012 July 2023 Request for Withholding Information from Public Disclosure ML23142A2022023-06-29029 June 2023 Issuance of Amendment Nos. 279 and 332 Emergency Plan Staffing Requirements IR 05000313/20234032023-06-28028 June 2023 Security Baseline Inspection Report 05000313/2023403 and 05000368/2023403 ML23178A0892023-06-26026 June 2023 August 2023 Emergency Preparedness Program Inspection-Request for Information ML23166B0902023-06-21021 June 2023 Request for Relief ANO1 ISI 036 Regarding Volumetric Examination Requirements ML23180A1082023-06-20020 June 2023 ANO Unit 1 SAR Amendment 31, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report IR 05000313/20234012023-06-13013 June 2023 Cyber Security Inspection Report 05000313/2023401 and 05000368/2023401 ML23130A2972023-05-17017 May 2023 Notification of Inspection (NRC Inspection Report 05000313/2023003) and Request for Information ML23121A3012023-05-10010 May 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk - Informed Completion Times ML23114A3572023-05-10010 May 2023 Regulatory Audit Summary Concerning Review of Request for Alternative ANO-CISI-002 Regarding Containment Inservice Inspection Frequency ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000313/20230012023-05-0909 May 2023 Integrated Inspection Report 05000313/2023001 and 05000368/2023001 ML23118A3202023-05-0808 May 2023 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000313;05000368/2023010) IR 05000368/20233012023-05-0101 May 2023 NRC Examination Report 05000368/2023301 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23108A1362023-04-24024 April 2023 Approval of Request for Half-Nozzle Repair of Reactor Vessel Closure Head Penetration No. 46 ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G 2024-01-24
[Table view] Category:License-Operator
MONTHYEARIR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23114A1542023-03-23023 March 2023 03 Public Forms 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22147A1882022-04-13013 April 2022 04 Public Forms ML22133A2922022-04-13013 April 2022 04 Post Examination Analysis ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21235A1762021-08-26026 August 2021 ANO1 2022-04 Corporate Notification Letter Cco ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21137A2892021-04-0808 April 2021 6_AN2-2021-03 Operating Test Comments (Final) ML21137A2902021-04-0808 April 2021 7_AN2-2021-03 Final Outlines ML21137A2862021-04-0808 April 2021 3_AN2-2021-03 Draft Written Exam ML21137A2882021-04-0808 April 2021 5_AN2-2021-03 Draft Operating Test ML21137A2872021-04-0808 April 2021 4_AN2-2021-03 Draft Written Exam Comments ML21137A2772021-04-0808 April 2021 Examination Outline Quality Checklist ML21134A2412021-04-0808 April 2021 8_AN2-2021-03 Final Written Exam ML21137A2842021-04-0808 April 2021 1_AN2-2021-03 Draft Outlines ML21134A2422021-04-0808 April 2021 9_AN2-2021-03 Final Operating Test ML21137A2852021-04-0808 April 2021 2_AN2-2021-03 Outline Comments ML21075A0362021-03-18018 March 2021 NRC Initial Operator Licensing Examination Approval 05000368/2021301 ML20233A9242020-06-0505 June 2020 AN1-2020-04 Draft Written Exam ML20233A9252020-06-0505 June 2020 AN1-2020-04 Final Outlines ML20233A9202020-06-0505 June 2020 AN1-2020-03 Draft Outline Comments ML20233A9212020-06-0505 June 2020 AN1-2020-04 Draft Operating Test Comments ML20233A9222020-06-0505 June 2020 AN1-2020-04 Draft Operating Test ML20233A9192020-06-0505 June 2020 AN1 2020-04 Draft Written Comments 1CAN101904, AN1-2020-04 Draft Outlines2020-06-0505 June 2020 AN1-2020-04 Draft Outlines ML20204A8062020-06-0404 June 2020 AN1-2020-04 Final Op Test ML20204A8072020-06-0404 June 2020 AN1-2020-04 Final Written Exam ML20085F8292020-03-25025 March 2020 NRC Initial Operator Licensing Written Examination Approval Amended 05000313/2020301 ML20079L9512020-03-19019 March 2020 NRC Initial Operator Licensing Examination Approval 05000313/2020301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000368/20193012019-06-13013 June 2019 NRC Examination Report 05000368/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 0CAN041801, Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-24024 April 2018 Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18096A1012018-03-0707 March 2018 2018-02-Public Forms ML18051A4252018-02-16016 February 2018 NRC Initial Operator Licensing Examination Approval 05000313/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18045A4922017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Comments ML18046B4422017-06-15015 June 2017 2017-06 - Public Forms ML18045A4982017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam ML18045A4942017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outline Comments ML18045A4962017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outlines ML17240A3802017-06-15015 June 2017 2017-06-Final Written Exams 2023-08-14
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23114A1542023-03-23023 March 2023 03 Public Forms 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22147A1882022-04-13013 April 2022 04 Public Forms ML22133A2922022-04-13013 April 2022 04 Post Examination Analysis ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21235A1762021-08-26026 August 2021 ANO1 2022-04 Corporate Notification Letter Cco ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21137A2862021-04-0808 April 2021 3_AN2-2021-03 Draft Written Exam ML21134A2422021-04-0808 April 2021 9_AN2-2021-03 Final Operating Test ML21137A2892021-04-0808 April 2021 6_AN2-2021-03 Operating Test Comments (Final) ML21137A2872021-04-0808 April 2021 4_AN2-2021-03 Draft Written Exam Comments ML21134A2412021-04-0808 April 2021 8_AN2-2021-03 Final Written Exam ML21137A2882021-04-0808 April 2021 5_AN2-2021-03 Draft Operating Test ML21137A2842021-04-0808 April 2021 1_AN2-2021-03 Draft Outlines ML21137A2902021-04-0808 April 2021 7_AN2-2021-03 Final Outlines ML21137A2852021-04-0808 April 2021 2_AN2-2021-03 Outline Comments ML21137A2772021-04-0808 April 2021 Examination Outline Quality Checklist ML21075A0362021-03-18018 March 2021 NRC Initial Operator Licensing Examination Approval 05000368/2021301 ML20233A9252020-06-0505 June 2020 AN1-2020-04 Final Outlines ML20233A9212020-06-0505 June 2020 AN1-2020-04 Draft Operating Test Comments ML20233A9192020-06-0505 June 2020 AN1 2020-04 Draft Written Comments ML20233A9222020-06-0505 June 2020 AN1-2020-04 Draft Operating Test ML20233A9202020-06-0505 June 2020 AN1-2020-03 Draft Outline Comments ML20233A9242020-06-0505 June 2020 AN1-2020-04 Draft Written Exam 1CAN101904, AN1-2020-04 Draft Outlines2020-06-0505 June 2020 AN1-2020-04 Draft Outlines ML20204A8072020-06-0404 June 2020 AN1-2020-04 Final Written Exam ML20204A8062020-06-0404 June 2020 AN1-2020-04 Final Op Test ML20085F8292020-03-25025 March 2020 NRC Initial Operator Licensing Written Examination Approval Amended 05000313/2020301 ML20079L9512020-03-19019 March 2020 NRC Initial Operator Licensing Examination Approval 05000313/2020301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000368/20193012019-06-13013 June 2019 NRC Examination Report 05000368/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations 0CAN041801, Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-24024 April 2018 Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18096A1012018-03-0707 March 2018 2018-02-Public Forms ML18051A4252018-02-16016 February 2018 NRC Initial Operator Licensing Examination Approval 05000313/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17240A3832017-06-15015 June 2017 2017-06-Post Exam Analysis ML17240A3802017-06-15015 June 2017 2017-06-Final Written Exams ML18046B4422017-06-15015 June 2017 2017-06 - Public Forms ML18045A4962017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outlines ML18045A4982017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam ML18045A4942017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outline Comments ML18045A4922017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Comments 2023-08-14
[Table view] |
Text
September 6, 2005 Jeffrey S. Forbes Vice President Operations Arkansas Nuclear One Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72801-0967
SUBJECT:
ARKANSAS NUCLEAR ONE, UNIT 1 - NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL 05000313/2005301
Dear Mr. Forbes:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Arkansas Nuclear One, Unit 1.
The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Randal Martin, Training Supervisor, Unit 1. Note that any examination waivers and applications denials have been addressed in separate correspondence.
The NRC has approved the subject examinations and hereby authorizes you to administer the written examination in accordance with Revision 9 of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, on September 9, 2005. The NRC staff will administer the operating tests during the week of September 12, 2005.
Please contact your Chief Examiner, Mark Haire, at (817) 860-8117, if you have any questions or identify any errors or changes in the license level (RO/SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
Sincerely,
/RA/
Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety Dockets: 50-313 50-368 Licenses: DPR-51 NPF-6
Enclosure:
ES 201-4
Entergy Operations, Inc. - 2-cc w/enclosure:
Randal Martin, Training Supervisor, Unit 1 Arkansas Nuclear One Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72801 cc w/o enclosure:
Senior Vice President
& Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Vice President Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Manager, Washington Nuclear Operations ABB Combustion Engineering Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 County Judge of Pope County Pope County Courthouse 100 West Main Street Russellville, AR 72801 Winston & Strawn LLP 1700 K Street, N.W.
Washington, DC 20006-3817 Bernard Bevill Radiation Control Team Leader Division of Radiation Control and Emergency Management Arkansas Department of Health 4815 West Markham Street, Mail Slot 30 Little Rock, AR 72205-3867 James Mallay Director, Regulatory Affairs Framatome ANP 3815 Old Forest Road Lynchburg, VA 24501
Entergy Operations, Inc. - 3-Electronic distribution w/o enclosure by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (KMK)
Senior Resident Inspector (RWD)
Branch Chief, DRP/E (DNG)
Senior Project Engineer, DRP/E (VGG)
Team Leader, DRP/TSS (RLN1)
RITS Coordinator (KEG)
L. Hurley SISP Review Completed: yes ADAMS: / Yes G No Initials: lah
/ Publicly Available G Non-Publicly Available G Sensitive / Non-Sensitive DOCUMENT NAME:E:\Filenet\ML052560258.wpd RIV:OB:LA CE:OB C:OB LAHurley MSHaire RELantz
/RA/ /RA/ /RA/
09/01/05 09/02/05 09/02/05 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax