MONTHYEARIR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23114A1542023-03-23023 March 2023 03 Public Forms 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22147A1882022-04-13013 April 2022 04 Public Forms ML22133A2922022-04-13013 April 2022 04 Post Examination Analysis ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21235A1762021-08-26026 August 2021 ANO1 2022-04 Corporate Notification Letter Cco ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21137A2892021-04-0808 April 2021 6_AN2-2021-03 Operating Test Comments (Final) ML21137A2902021-04-0808 April 2021 7_AN2-2021-03 Final Outlines ML21137A2862021-04-0808 April 2021 3_AN2-2021-03 Draft Written Exam ML21137A2882021-04-0808 April 2021 5_AN2-2021-03 Draft Operating Test ML21137A2872021-04-0808 April 2021 4_AN2-2021-03 Draft Written Exam Comments ML21137A2772021-04-0808 April 2021 Examination Outline Quality Checklist ML21134A2412021-04-0808 April 2021 8_AN2-2021-03 Final Written Exam ML21137A2842021-04-0808 April 2021 1_AN2-2021-03 Draft Outlines ML21134A2422021-04-0808 April 2021 9_AN2-2021-03 Final Operating Test ML21137A2852021-04-0808 April 2021 2_AN2-2021-03 Outline Comments ML21075A0362021-03-18018 March 2021 NRC Initial Operator Licensing Examination Approval 05000368/2021301 ML20233A9242020-06-0505 June 2020 AN1-2020-04 Draft Written Exam ML20233A9252020-06-0505 June 2020 AN1-2020-04 Final Outlines ML20233A9202020-06-0505 June 2020 AN1-2020-03 Draft Outline Comments ML20233A9212020-06-0505 June 2020 AN1-2020-04 Draft Operating Test Comments ML20233A9222020-06-0505 June 2020 AN1-2020-04 Draft Operating Test ML20233A9192020-06-0505 June 2020 AN1 2020-04 Draft Written Comments 1CAN101904, AN1-2020-04 Draft Outlines2020-06-0505 June 2020 AN1-2020-04 Draft Outlines ML20204A8062020-06-0404 June 2020 AN1-2020-04 Final Op Test ML20204A8072020-06-0404 June 2020 AN1-2020-04 Final Written Exam ML20085F8292020-03-25025 March 2020 NRC Initial Operator Licensing Written Examination Approval Amended 05000313/2020301 ML20079L9512020-03-19019 March 2020 NRC Initial Operator Licensing Examination Approval 05000313/2020301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000368/20193012019-06-13013 June 2019 NRC Examination Report 05000368/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 0CAN041801, Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-24024 April 2018 Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18096A1012018-03-0707 March 2018 2018-02-Public Forms ML18051A4252018-02-16016 February 2018 NRC Initial Operator Licensing Examination Approval 05000313/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18045A4922017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Comments ML18046B4422017-06-15015 June 2017 2017-06 - Public Forms ML18045A4982017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam ML18045A4942017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outline Comments ML18045A4962017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outlines ML17240A3802017-06-15015 June 2017 2017-06-Final Written Exams 2023-08-14
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23114A1542023-03-23023 March 2023 03 Public Forms 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22147A1882022-04-13013 April 2022 04 Public Forms ML22133A2922022-04-13013 April 2022 04 Post Examination Analysis ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21235A1762021-08-26026 August 2021 ANO1 2022-04 Corporate Notification Letter Cco ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21137A2862021-04-0808 April 2021 3_AN2-2021-03 Draft Written Exam ML21134A2422021-04-0808 April 2021 9_AN2-2021-03 Final Operating Test ML21137A2892021-04-0808 April 2021 6_AN2-2021-03 Operating Test Comments (Final) ML21137A2872021-04-0808 April 2021 4_AN2-2021-03 Draft Written Exam Comments ML21134A2412021-04-0808 April 2021 8_AN2-2021-03 Final Written Exam ML21137A2882021-04-0808 April 2021 5_AN2-2021-03 Draft Operating Test ML21137A2842021-04-0808 April 2021 1_AN2-2021-03 Draft Outlines ML21137A2902021-04-0808 April 2021 7_AN2-2021-03 Final Outlines ML21137A2852021-04-0808 April 2021 2_AN2-2021-03 Outline Comments ML21137A2772021-04-0808 April 2021 Examination Outline Quality Checklist ML21075A0362021-03-18018 March 2021 NRC Initial Operator Licensing Examination Approval 05000368/2021301 ML20233A9252020-06-0505 June 2020 AN1-2020-04 Final Outlines ML20233A9212020-06-0505 June 2020 AN1-2020-04 Draft Operating Test Comments ML20233A9192020-06-0505 June 2020 AN1 2020-04 Draft Written Comments ML20233A9222020-06-0505 June 2020 AN1-2020-04 Draft Operating Test ML20233A9202020-06-0505 June 2020 AN1-2020-03 Draft Outline Comments ML20233A9242020-06-0505 June 2020 AN1-2020-04 Draft Written Exam 1CAN101904, AN1-2020-04 Draft Outlines2020-06-0505 June 2020 AN1-2020-04 Draft Outlines ML20204A8072020-06-0404 June 2020 AN1-2020-04 Final Written Exam ML20204A8062020-06-0404 June 2020 AN1-2020-04 Final Op Test ML20085F8292020-03-25025 March 2020 NRC Initial Operator Licensing Written Examination Approval Amended 05000313/2020301 ML20079L9512020-03-19019 March 2020 NRC Initial Operator Licensing Examination Approval 05000313/2020301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000368/20193012019-06-13013 June 2019 NRC Examination Report 05000368/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations 0CAN041801, Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-24024 April 2018 Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18096A1012018-03-0707 March 2018 2018-02-Public Forms ML18051A4252018-02-16016 February 2018 NRC Initial Operator Licensing Examination Approval 05000313/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17240A3832017-06-15015 June 2017 2017-06-Post Exam Analysis ML17240A3802017-06-15015 June 2017 2017-06-Final Written Exams ML18046B4422017-06-15015 June 2017 2017-06 - Public Forms ML18045A4962017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outlines ML18045A4982017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam ML18045A4942017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outline Comments ML18045A4922017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Comments 2023-08-14
[Table view] |
Text
Entergy (Ii Entergy Operations, Inc.
4 98 8404 ILl D. Gregory Kilpatrick Manager. 1 raining Arkaimas Nuclear One ICANO6 1705 June 15. 2017 Mr. Brian Larson Chief Examiner U. S. Nuclear Regulatory Commission 1600 E. Lamar Blvd.
Arlington, TX 76011-4125
Subject:
Initial Retake Examination Completion of Post-Examination Analysis Arkansas Nuclear One Unit I (B&W)
Docket No. 50-3 13 Dear Mr. Larson.
Contained in this submittal are the post examination materials as required per NUREG 1021, Revision 10 for the ANO Unit One initial retake written examination administered on June 15. 2017. The examination security agreement which is enclosed has not been finalized and the completed ES-201-3 form will be sent when all required signatures are obtained.
We also request that all examination materials related to the ANO Unit One 2017 NRC Operator License Examination he withheld from public disclosure for a period of two years from this date.
If you have any questions regarding this submittal, please contact Randal Martin at (479) 858-6844.
S incerelv.
DGK/rkm Enclosures cc w/o enclosures: Licensing, ANO-DCC
ANO-1 2017 NRC Initial License Written Exam Analysis RO SRO Fraction Incorrect A B C D 1 D 0.333333 0 0 0 1 2 0 0 0 0 0 3 0 0 0 0 0 4 0 0 0 0 0 5 0 0 0 0 0 6 B 0.333333 0 1 0 0 7 C 0.333333 0 0 1 0 8 0 0 0 0 0 9 0 0 0 0 0 10 0 0 0 0 0 11 0 0 0 0 0 12 0 0 0 0 0 13 0 0 0 0 0 14 0 0 0 0 0 15 0 0 0 0 0 16 0 0 0 0 0 17 0 0 0 0 0 18 0 0 0 0 0 19 A A 0.666667 2 0 0 0 20 0 0 0 0 0 21 0 0 0 0 0 22 0 0 0 0 0 23 C 0.333333 0 0 1 0 24 0 0 0 0 0 25 0 0 0 0 0 26 A 0.333333 1 0 0 0 27 0 0 0 0 0 28 C 0.333333 0 0 1 0 29 0 0 0 0 0 30 0 0 0 0 0 31 0 0 0 0 0 32 0 0 0 0 0 33 0 0 0 0 0 34 0 0 0 0 0 35 0 0 0 0 0 36 0 0 0 0 0 37 D 0.333333 0 0 0 1 38 0 0 0 0 0 39 D 0.333333 0 0 0 1 40 0 0 0 0 0 41 0 0 0 0 0 42 0 0 0 0 0 43 0 0 0 0 0 44 C 0.333333 0 0 1 0 45 0 0 0 0 0 46 C C 0.666667 0 0 2 0 47 0 0 0 0 0 48 0 0 0 0 0 49 0 0 0 0 0 50 0 0 0 0 0 51 0 0 0 0 0 52 0 0 0 0 0 53 0 0 0 0 0 54 0 0 0 0 0 55 0 0 0 0 0 Rev 2
ANO-1 2017 NRC Initial License Written Exam Analysis 56 0 0 0 0 0 57 A D A 1 2 0 0 1 58 0 0 0 0 0 59 0 0 0 0 0 60 0 0 0 0 0 61 D D 0.666667 0 0 0 2 62 0 0 0 0 0 63 B 0.333333 0 1 0 0 64 0 0 0 0 0 65 B 0.333333 0 1 0 0 66 0 0 0 0 0 67 B D D 1 0 1 0 2 68 0 0 0 0 0 69 0 0 0 0 0 70 0 0 0 0 0 71 0 0 0 0 0 72 0 0 0 0 0 73 0 0 0 0 0 74 D 0.333333 0 0 0 1 75 0 0 0 0 0 76 0 0 0 0 0 77 0 0 0 0 0 78 0 0 0 0 0 79 0 0 0 0 0 80 0 0 0 0 0 81 0 0 0 0 0 82 0 0 0 0 0 83 0 0 0 0 0 84 0 0 0 0 0 85 0 0 0 0 0 86 0 0 0 0 0 87 0 0 0 0 0 88 0 0 0 0 0 89 0 0 0 0 0 90 0 0 0 0 0 91 0 0 0 0 0 92 0 0 0 0 0 93 0 0 0 0 0 94 0 0 0 0 0 95 A 1 1 0 0 0 96 0 0 0 0 0 97 0 0 0 0 0 98 0 0 0 0 0 99 0 0 0 0 0 100 0 0 0 0 0 10 10 5 RO 86.67% 86.67%
Over-All 95.00%
1 SRO Only 96.00%
Rev 2
2017 ANO-1 NRC Exam Administered June 15, 2017 Page 1 of 3 RO Final Written Examination Analysis The threshold for determination of questions to be analyzed was a percentage of 50% incorrect responses. Due to only three applicants taking the exam this means that if two applicants missed a question, then it was analyzed.
- 19 2/3 total applicants incorrect (66.7%)
Both chose A. The correct answer is B.
This question involves an approach to criticality where the operator is withdrawing rods when there is outward rod motion without a command and SUR is sustained at 2.5 DPM. The correct response in B is to trip the reactor and go to the Reactor Trip EOP. Distractor A contains only part of a sequence of commands (not all) which might stop outward rod motion without a command.
No change to the key was made. The question is technically correct as written, with no construction problems. We will be performing training needs analysis on this question.
- 46 2/3 total applicants incorrect (66.7%)
Two chose C. The correct answer is B.
This question involves a Blackout condition and asks the minimum time the vital batteries are designed to power essential loads, and what loads are secured to extend battery capacity. The C distractor contains the correct loads which are secured but has the incorrect minimum time. No change to the key was made. The question is technically correct as written, with no construction problems. We will be performing training needs analysis on this question.
- 57 3/3 total applicants incorrect (100.0%)
Two chose A, one chose D. The correct answer is C.
This question asks what feature in the ICS is specifically designed to respond to malfunctions which will have an effect on the nuclear fuel. The correct answer is the Delta Tc Controller whose only purpose is to minimize differences in cold leg temperatures between the loops and thus minimizes the effects those differences could have on quadrant tilt in the reactor core. No change to the key was made. The question is technically correct as written, with no construction problems. We will be performing training needs analysis on this question.
Rev 1
2017 ANO-1 NRC Exam Administered June 15, 2017 Page 2 of 3 (RO Final Written Examination Analysis continued)
- 61 2/3 total applicants incorrect (66.7%)
Both chose D. The correct answer is C.
This question is about commencing a Reactor Building purge. This is an operation performed only during refueling outages and as such, the applicants may not have any experience with this equipment. However, this topic is part of their curriculum and is included in the K/A catalog. No change to the key was made. The question is technically correct as written, with no construction problems. We will be performing training needs analysis on this question.
- 67 3/3 total applicants incorrect (100.0%)
Two chose D and one chose B. The correct answer is C.
This question is about the procedural requirements for manually seating a non-Q MOV inside the Reactor Building. The answer choices are in a 2x2 format and thus one must know two pieces of knowledge: 1) are danger tags used in the Reactor Building during heatup, and 2) do non-Q MOVs require the use of a torque wrench. Both incorrect answers chosen contain the use of danger tags.. No change to the key was made. The question is technically correct as written, with no construction problems. We will be performing training needs analysis on this question.
Rev 1
2017 ANO-1 NRC Exam Administered June 15, 2017 Page 3 of 3 SRO Final Written Examination Analysis Since there was only one SRO applicant the threshold for determination of questions to be analyzed was simply a miss of the question.
- 95 1/1 total applicants missed (100.0%)
One chose A. The correct answer is D.
The question concerns two pieces of knowledge: 1) the maximum Tech Spec limit for dose equivalent I-131, and 2) which accident, besides a Main Steam Line Break, is this specification designed for. The answer chosen did not contain either correct piece of information. No change to the key was made.
The question is technically correct as written, with no construction problems. We will be performing training needs analysis on this question.
NOTE:
The document initiated to perform training needs analysis is WTANO-2017-00233.
Rev 1