MONTHYEARML24283A1442024-10-16016 October 2024 Main Steam Line Break Accident Analysis LAR Pre-Application Meeting ML24247A0042024-09-0303 September 2024 SLR Efficiencies Public Meeting - NRC Presentation - September 5, 2024 ML24108A0712024-04-30030 April 2024 Combined - 2023 Annual Assessment Public Meeting Slides ML24029A2362024-01-30030 January 2024 Preliminary Results of the Environmental Review, Subsequent License Renewal ML23338A1522023-12-0707 December 2023 Public Meeting Slides for North Anna and Surry Emergency Plan Augmentation Times License Amendment Request ML23255A0992023-09-15015 September 2023 Slides for September 15, 2023 Public Meeting on Poanhi Seismic Evaluations ML23103A3482023-04-14014 April 2023 Annual Assessment Meeting Presentation for North Anna and Surry ML21221A0332022-06-17017 June 2022 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides ML21174A3042021-06-23023 June 2021 SLRA RAI Response Public Meeting - 21-06-24 ML21221A1542021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Dominion Slides ML21145A2172021-05-13013 May 2021 Discussion on May 13, 2021 with Dominion on Select Staff RAIs on North Anna Subsequent License Renewal Application - Dominion Slides ML21132A2892021-05-13013 May 2021 SLRA RAI Response Public Meeting ML21034A5972021-02-10010 February 2021 External Presentation Am Atkinson_Nrc ISG-06 Meeting Dominion Digital IC Project 02102021 ML20288A3472020-10-14014 October 2020 (COVID-19) Emergency Preparedness Exemption Pre-Application Meeting ML20099F2992020-04-0909 April 2020 NRC Slides for North Anna pre-app April 9 ML20099F2412020-04-0909 April 2020 Co., NRC Safety Pre& 8208;Application Meeting North Anna Power Station (NAPS) ML20098B6022020-04-0707 April 2020 Annual Assessment Meeting Presentation ML19297D1872019-11-18018 November 2019 Pre-Application Meeting - Dominion Slides ML18320A2502018-11-20020 November 2018 50.90 License Amendment Request - Dominion Fleet EAL Scheme Changes, November 20, 2018 Public Meeting ML18141A3072018-05-21021 May 2018 18 - SLR Status ML17123A2092017-05-0303 May 2017 Summary of Meeting to Discuss Annual Assessment of the North Anna Power Station, Units 1 and 2 with the Public for the Period of January 1, 2016 Through December 31, 2016 ML16124A7582016-05-0303 May 2016 April 14, 2016, Summer of Public Meeting - North Anna, Units 1 and 2 ML16124A7632016-05-0303 May 2016 April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2 ML16104A3822016-04-26026 April 2016 New Fuel Storage Rack & SFP Criticality Analysis for April 26th 2016 Scheduled Category 1, Pre-Submittal Public Teleconference ML16104A3872016-04-13013 April 2016 Criticality Analysis Checklist for North Anna ML15273A4292015-09-29029 September 2015 Revised Slides for September 29, 2015 Meeting with Dominion Re North Anna ISFSI License Renewal ML15153A0452015-05-13013 May 2015 Revised North Anna ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15133A0822015-05-13013 May 2015 ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15128A5462015-05-0808 May 2015 Summary of Public Meeting with North Anna, Units 1 and 2 to Discuss the Annual Assessment with the Public ML14101A1202014-04-11011 April 2014 Public Meeting Summary - North Anna Power Station, Docket Nos. 50-338, 50-339 ML14058B1762014-03-0606 March 2014 Presentation Slides - North Anna ISFSI - High Burnup Dry Storage Confirmatory Data Project, TN-32 Storage Cask, Tom Brookmire, March 6, 2014, Docket No. 72-16, TAC No: L24886 ML14071A1672014-01-28028 January 2014 Enclosure 2: Presentation Slides - North Anna ISFSI TN-32 Cask and Pad 1 Assessments Following August 23, 2011, Central Virginia Earthquake ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML12257A2342012-09-11011 September 2012 5-Hacker - North Anna Mockup and Search Unit Action Presentation Sept 10 ML12257A2002012-09-11011 September 2012 2-North Anna Extent of Condition Presentation 9-7-12 Sept 10 ML12131A5052012-05-0909 May 2012 Presentation for 2011 North Anna EOC Annual Assessment Meeting ML11305A0452011-11-0101 November 2011 Region II - North Anna Public Meeting Slides ML11305A0622011-11-0101 November 2011 Restart Readiness, Public Meeting PR2 ML11276A0242011-10-0303 October 2011 Slides-North Anna AIT Public Meeting October 3, 2011 ML1127701352011-10-0303 October 2011 Ltr to D. Heacock Re Participation in the Commission Meeting on the North Anna Plant on 10/21/11 ML11252A0062011-09-0808 September 2011 Dominion'S Slides Earthquake Response and North Anna Restart Readiness Demonstration Plan ML1124205512011-08-30030 August 2011 Seismic Event ML1110304942011-04-13013 April 2011 Public Meeting Attendees ML1110304982011-04-13013 April 2011 Public Meeting Handouts ML1032204442010-11-18018 November 2010 Public Meeting Summary - North Anna Power Station ML1020100212010-07-14014 July 2010 Nucler Power Station, Units 1 and 2, Westinghouse RFA-2 Fuel Transition Licensing Meeting Presentation Slides ML1012600332010-05-0505 May 2010 Meeting Posters ML1012600342010-05-0505 May 2010 Public Mtg. Slides ML0917610472009-08-0505 August 2009 ECCS Preacs Filtration Presentation ML0911000392009-04-17017 April 2009 Notice of Public Meeting Category 1 - Annual Assessment of North Anna Power Station 2024-09-03
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24283A1442024-10-16016 October 2024 Main Steam Line Break Accident Analysis LAR Pre-Application Meeting ML24247A0042024-09-0303 September 2024 SLR Efficiencies Public Meeting - NRC Presentation - September 5, 2024 ML24108A0712024-04-30030 April 2024 Combined - 2023 Annual Assessment Public Meeting Slides ML24029A2362024-01-30030 January 2024 Preliminary Results of the Environmental Review, Subsequent License Renewal ML23338A1522023-12-0707 December 2023 Public Meeting Slides for North Anna and Surry Emergency Plan Augmentation Times License Amendment Request ML23255A0992023-09-15015 September 2023 Slides for September 15, 2023 Public Meeting on Poanhi Seismic Evaluations ML23103A3482023-04-14014 April 2023 Annual Assessment Meeting Presentation for North Anna and Surry ML21221A0332022-06-17017 June 2022 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides ML22091A0902022-04-0101 April 2022 Combined 2021 Assessment Meeting Slides ML21221A1482021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides ML21221A1542021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Dominion Slides ML21132A2892021-05-13013 May 2021 SLRA RAI Response Public Meeting ML21145A2172021-05-13013 May 2021 Discussion on May 13, 2021 with Dominion on Select Staff RAIs on North Anna Subsequent License Renewal Application - Dominion Slides ML21034A5972021-02-10010 February 2021 External Presentation Am Atkinson_Nrc ISG-06 Meeting Dominion Digital IC Project 02102021 ML20288A3472020-10-14014 October 2020 (COVID-19) Emergency Preparedness Exemption Pre-Application Meeting ML20099F2412020-04-0909 April 2020 Co., NRC Safety Pre& 8208;Application Meeting North Anna Power Station (NAPS) ML20099F2992020-04-0909 April 2020 NRC Slides for North Anna pre-app April 9 ML20098B6022020-04-0707 April 2020 Annual Assessment Meeting Presentation ML19297D1872019-11-18018 November 2019 Pre-Application Meeting - Dominion Slides ML18141A3072018-05-21021 May 2018 18 - SLR Status ML16124A7582016-05-0303 May 2016 April 14, 2016, Summer of Public Meeting - North Anna, Units 1 and 2 ML16124A7632016-05-0303 May 2016 April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2 ML15273A4292015-09-29029 September 2015 Revised Slides for September 29, 2015 Meeting with Dominion Re North Anna ISFSI License Renewal ML15153A0452015-05-13013 May 2015 Revised North Anna ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15133A0822015-05-13013 May 2015 ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15128A5462015-05-0808 May 2015 Summary of Public Meeting with North Anna, Units 1 and 2 to Discuss the Annual Assessment with the Public ML14058B1762014-03-0606 March 2014 Presentation Slides - North Anna ISFSI - High Burnup Dry Storage Confirmatory Data Project, TN-32 Storage Cask, Tom Brookmire, March 6, 2014, Docket No. 72-16, TAC No: L24886 ML14071A1672014-01-28028 January 2014 Enclosure 2: Presentation Slides - North Anna ISFSI TN-32 Cask and Pad 1 Assessments Following August 23, 2011, Central Virginia Earthquake ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML12257A2002012-09-11011 September 2012 2-North Anna Extent of Condition Presentation 9-7-12 Sept 10 ML12257A2342012-09-11011 September 2012 5-Hacker - North Anna Mockup and Search Unit Action Presentation Sept 10 ML12131A5052012-05-0909 May 2012 Presentation for 2011 North Anna EOC Annual Assessment Meeting ML11305A0452011-11-0101 November 2011 Region II - North Anna Public Meeting Slides ML11305A0622011-11-0101 November 2011 Restart Readiness, Public Meeting PR2 ML1128500392011-10-12012 October 2011 Summary of Augmented Inspection Team Public Exit Meeting with Virginia Electric Power Company to Discuss the Results of an ATI Inspection of an Earthquake Event on August 23, 2011 ML11276A0242011-10-0303 October 2011 Slides-North Anna AIT Public Meeting October 3, 2011 ML1127701352011-10-0303 October 2011 Ltr to D. Heacock Re Participation in the Commission Meeting on the North Anna Plant on 10/21/11 ML11252A0062011-09-0808 September 2011 Dominion'S Slides Earthquake Response and North Anna Restart Readiness Demonstration Plan ML12040A2742011-08-31031 August 2011 E-Mail from G. Wilson, NRR to D. Merzke, EDO; Subject: Seismic Instruments at North Anna ML12044A2912011-08-30030 August 2011 E-mail from G. Bowman, EDO to T. Hipschman, Comm, Et Al; Subject: FYI-Revised Slides on North Anna/Gl-199 ML1124205512011-08-30030 August 2011 Seismic Event ML12044A2792011-08-30030 August 2011 Email from M. Khanna, NRR to R. Auluck, NRR FW: North Anna Earthquake Issue Commissioner Briefing Final with Talking Points ML12044A2572011-08-26026 August 2011 Email from A. Istar, NRR to A. Hiser, NRR on North Anna Nuclear Power Plant. Pptx ML1110304822011-04-13013 April 2011 Public Annual Assessment Meeting/Open House Slides ML1032204442010-11-18018 November 2010 Public Meeting Summary - North Anna Power Station ML1021102592010-08-0404 August 2010 Enclosure 3: Dominion - North Anna Presentation of July 28, 2010 Public Meeting ML1020100212010-07-14014 July 2010 Nucler Power Station, Units 1 and 2, Westinghouse RFA-2 Fuel Transition Licensing Meeting Presentation Slides ML1012600332010-05-0505 May 2010 Meeting Posters ML1012600342010-05-0505 May 2010 Public Mtg. Slides ML0917610472009-08-0505 August 2009 ECCS Preacs Filtration Presentation 2024-09-03
[Table view] |
Text
Extent of Condition Chuck Wirtz FirstEnergy, BWRVIP Integration Committee Chairman, NIFG Member NRC Meeting - North Anna Actions September 11, 2012
Overview
- Tentative Extent of Condtion Actions
© 2012 Electric Power Research Institute, Inc. All rights reserved. 2
Scope
- The scope of the extent of condition evaluation included all the Class 1 dissimilar metal welds in the US fleet that have been examined by ASME,Section XI, Appendix VIII, Supplement 10 procedures and personnel (NIFG Action Item 5.1)
© 2012 Electric Power Research Institute, Inc. All rights reserved. 3
Objective
- The objective is to understand the extent and types of UT examinations performed on dissimilar metal welds (DMWs), their relative risk from an NDE perspective, the overall relative safety risk with consideration of the weld joint materials, and identify the actions to be taken (NIFG Action Item 5.2)
© 2012 Electric Power Research Institute, Inc. All rights reserved. 4
Method
- A focused survey was developed by the NIFG team
- Distributed to all US fleet ISI/NDE contacts
- Identification/Description of Supp 10 Welds
- Exam Method (i.e., Auto, Encoded Manual, Manual)
- Was Site-Specific Mock-up Used
- Was Team Scanning Used
- Filler and Base Materials
- Mitigation Status
- Year of Next Scheduled Exam
© 2012 Electric Power Research Institute, Inc. All rights reserved. 5
Response
- Data received from 104 of 104 plants
- Data provided on more than 2,200 DM welds
- Peer checks of the data performed
- On a sampling basis, compared data to existing industry DM weld survey information from BWRVIP and MRP databases
- Peer checks found data was generally consistent, but there were some anomalies that will require follow-up with the plants to resolve
- Responses allowed the NIFG team to screen all the plants and understand the extent of condition and relative safety significance
© 2012 Electric Power Research Institute, Inc. All rights reserved. 6
Data set screening Initial screening of data identified some anomalies resulting in an preliminary Supplement 10 population of 2107 DMW welds Automated vs Manual Examinations 1000 900 800 866 PWR 700 1241 600 BWR 500 400 300 200 100 0
Manual Automated The next screening of data eliminated welds reported as being examined from the inside surface because:
- none involved the use of site-specific mockups
© 2012 Electric Power Research Institute, Inc. All rights reserved. 7
Data Analysis
- Approach was to quantify the data using a risk matrix
© 2012 Electric Power Research Institute, Inc. All rights reserved. 8
Data Analysis Considerations
- NDE - NDE
- Materials - Materials
- Susceptible base material
- Susceptible filler material material
- Non- susceptible filler material
- Ultimately not used in the data analysis
- Mitigated welds because the use of team scanning was not documented consistently.
© 2012 Electric Power Research Institute, Inc. All rights reserved. 9
Data Analysis - Initial Strategy
© 2012 Electric Power Research Institute, Inc. All rights reserved. 10
Risk Assessment Tool
- The risk assessment strategy is being developed into a tool This will be distributed to all licenses for their use in self assessment Materials and Mitigation strategies determine relative risk category Application of NDE drives relative risk from Red to Green
© 2012 Electric Power Research Institute, Inc. All rights reserved. 11
Data Analysis - Final Strategy
© 2012 Electric Power Research Institute, Inc. All rights reserved. 12
High Level Summary (red box)
Extent of Condition (Preliminary) 866 Welds Plants PWR BWR 13 (1.5%) 6 1241 BWR PWR 40 (3.2%) 6 Fleet 53 (2.5%) 12 (11.5%)
13 40 6
6 7
Welds Plants Utilities
© 2012 Electric Power Research Institute, Inc. All rights reserved. 13
Tentative Extent of Condition Actions
- For welds identified as high relative risk (red box welds)
- Re-examine within 3 years using the DM weld guidance and NDE improvement tools developed by the NIFG team
© 2012 Electric Power Research Institute, Inc. All rights reserved. 14
Tentative EOC Actions (cont.)
- For welds identified as medium relative risk (orange box welds)
- Verify the materials are non-susceptible and/or mitigated
- Perform a review of the weld repair history to determine if there were any through-wall repairs or repairs to the ID surface and disposition as follows:
- If repairs history indicates ID materials could have been compromised, then the weld is to be treated the same as a red box weld and red box extent of condition actions apply
- If there were no repairs or the repairs were not through-wall or ID repairs, re-examine as normally scheduled using the DM weld guidance and NDE improvement tools developed by the NIFG team
© 2012 Electric Power Research Institute, Inc. All rights reserved. 15
Tentative EOC Actions (cont.)
- For welds identified as low relative risk (yellow box welds)
- At next scheduled examination apply the DM weld guidance and NDE improvement tools developed by the NIFG team
- For welds identified as having no relative risk (green box welds)
- No action is really necessary, but these welds will also benefit from application of the DM weld guidance and NDE improvement tools developed by the NIFG team upon their next examination
© 2012 Electric Power Research Institute, Inc. All rights reserved. 16
Implementation
- Implementation will be through the NEI 03-08 Materials Initiative Program, which will include issuing the extent of condition actions and NDE improvement guidance to the plants as Mandatory, Needed or Good Practice requirements as approved by the BWRVIP and PMMP Executive Committees.
© 2012 Electric Power Research Institute, Inc. All rights reserved. 17
Tentative Implementation Strategy for Red and Orange Box EOC Actions
- A Risk Assessment Tool will be sent to the plants requiring them to verify or re-evaluate their DMW Supplement 10 examination status, bin their own welds in the proper risk boxes, and follow the extent of condition actions outlined in the previous slides.
- NEI 03-08 guidance must be documented in plants Corrective Action programs.
- The plants will report the results of their self-binning to the NDE Integration Committee.
© 2012 Electric Power Research Institute, Inc. All rights reserved. 18
Tentative Implementation Schedule for the Red and Orange Box EOC Actions
- The targeted completion date for development of the Risk Assessment Tool is October 12th.
- The Tool and the associated actions will be reviewed and approved through the committees of the applicable NEI 03-08 Issue Programs (i.e., NDE, BWRVIP, and MRP). This process is expected to take at least 8 weeks.
- Requirements approved by the BWRVIP and PMMP Executive Committees will be transmitted to the plants for self-binning and implementation.
© 2012 Electric Power Research Institute, Inc. All rights reserved. 19
Open Discussion NRC Survey Questions
- The survey did not ask for differentiation of conventional vs phased array techniques. For the purpose of the extent of condition survey all qualified Supplement 10 exams were treated equally.
- The survey did not specifically ask for manual vs automated for both axial and circumferential scans. Some responses did identify that both manual and automated were used; these were treated as manual only.
- The NRC provided numerous detailed questions on the specifics of the site specific mockup applications. For the purposes of the extent of condition analysis, all site specific mockups were treated as equal contributors to risk.