Letter Sequence RAI |
---|
|
|
MONTHYEARJAFP-05-0151, Request for Approval of Relief Request No. RR-39, Implementation of BWRVIP Guidelines in Lieu of ASME Section XI Code Requirements on Reactor Vessel Internals and Components Inspection2005-10-0707 October 2005 Request for Approval of Relief Request No. RR-39, Implementation of BWRVIP Guidelines in Lieu of ASME Section XI Code Requirements on Reactor Vessel Internals and Components Inspection Project stage: Request ML0603907362006-02-0909 February 2006 Request for Additional Information Regarding Relief Request RR-39, Implementation of BWRVIP Guidelines Project stage: RAI JAFP-06-0059, Response to Request for Additional Information, Regarding Request for Approval of Relief Request No. 39, Section XI Code2006-04-0303 April 2006 Response to Request for Additional Information, Regarding Request for Approval of Relief Request No. 39, Section XI Code Project stage: Response to RAI JAFP-06-0085, Revision to Response for Additional Information Regarding Request for Approval of Relief Request No. 39, Implementation of BWRVIP Guidelines in Lieu of ASME Section XI Code Requirements on Reactor Vessel Internals and Components Inspect2006-05-31031 May 2006 Revision to Response for Additional Information Regarding Request for Approval of Relief Request No. 39, Implementation of BWRVIP Guidelines in Lieu of ASME Section XI Code Requirements on Reactor Vessel Internals and Components Inspection Project stage: Request ML0622002262006-08-30030 August 2006 Relief Request No. RR-39, Implementation of BWRVIP Guidelines in Lieu of ASME Section XI Code Requirements on Reactor Vessel Internals and Components Inspection Project stage: Other 2006-04-03
[Table View] |
|
---|
Category:Letter
MONTHYEARML24270A0742024-09-30030 September 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0134) - LTR ML24270A1452024-09-26026 September 2024 Notice of Enforcement Discretion for James A. Fitzpatrick Nuclear Power Plant JAFP-24-0047, License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software2024-09-25025 September 2024 License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software JAFP-24-0045, Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2024-09-20020 September 2024 Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications IR 05000333/20240112024-09-19019 September 2024 Follow-up to Inspection Procedure 71153 Report 05000333/2024011 and Preliminary White Finding and Apparent Violation JAFP-24-0044, Core Operating Limits Report Cycle 272024-09-16016 September 2024 Core Operating Limits Report Cycle 27 JAFP-24-0043, Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues2024-09-12012 September 2024 Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues ML24165A0382024-09-0404 September 2024 Issuance of Amendment No. 356 Update Fuel Handling Accident Analysis 05000333/LER-2024-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation2024-09-0404 September 2024 Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation IR 05000333/20240052024-08-29029 August 2024 Updated Inspection Plan for James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2024005) 05000333/LER-2024-001, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-08-21021 August 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000333/20240022024-08-0707 August 2024 Integrated Inspection Report 05000333/2024002 JAFP-24-0034, 10 CFR 50.46 Annual Report2024-07-31031 July 2024 10 CFR 50.46 Annual Report ML24208A0492024-07-30030 July 2024 Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Proposed No Significant Hazards Consideration Determination (Letter) JAFP-24-0036, Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-07-29029 July 2024 Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-24-0033, Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test2024-07-23023 July 2024 Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test IR 05000333/20244032024-07-18018 July 2024 Biennial Problem Identification and Resolution Inspection Report 05000333/2024403 (Cover Letter Only) IR 05000333/20244012024-07-15015 July 2024 Security Baseline Inspection 05000333/2024401 RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24190A1932024-07-0909 July 2024 Correction Letter of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance IR 05000333/20240102024-07-0808 July 2024 Commercial Grade Dedication Inspection Report 05000333/2024010 ML24184A1662024-07-0303 July 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24136A1162024-06-26026 June 2024 Issuance of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance ML24176A2412024-06-24024 June 2024 Licensed Operator Positive Fitness-for-Duty Test JAFP-24-0027, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-06-24024 June 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations JAFP-24-0026, Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance2024-06-12012 June 2024 Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 JAFP-24-0023, 2023 Annual Radiological Environmental Operating Report2024-05-0909 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000333/20240012024-05-0909 May 2024 Integrated Inspection Report 05000333/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests JAFP-24-0020, 2023 Annual Radioactive Effluent Release Report2024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report JAFP-24-0019, 2023 REIRS Transmittal of NRC Form 52024-04-18018 April 2024 2023 REIRS Transmittal of NRC Form 5 ML24106A0152024-04-15015 April 2024 Request for Withholding Information from Public Disclosure Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24107A6972024-04-12012 April 2024 Engine Systems, Inc Part 21 Report Re EMD Cylinder Liner Water Leak RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24068A0532024-03-28028 March 2024 Issuance of Amendment No. 354 Revise Technical Specifications Section 3.3.1.2, Source Range Monitors Instrumentation JAFP-24-0014, Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-03-25025 March 2024 Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-24-0010, Response to Request for Additional Information for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2024-02-29029 February 2024 Response to Request for Additional Information for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance IR 05000333/20230062024-02-28028 February 2024 Annual Assessment Letter for James A. FitzPatrick Nuclear Power Plant (Report 05000333/2023006) JAFP-24-0009, Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-02-28028 February 2024 Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis IR 05000333/20230042024-02-0707 February 2024 Integrated Inspection Report 05000333/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200012/2023001 ML24037A0102024-02-0606 February 2024 Requalification Program Inspection ML24018A0012024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000333/2024010) and Request for Information ML24004A2302024-01-0808 January 2024 Project Manager Reassignment ML23356A0832024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0058 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines JAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2023-12-14014 December 2023 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications 2024-09-04
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24060A0512024-02-28028 February 2024 NRR E-mail Capture - FitzPatrick - Final Arcb RAI Regarding Amendment to Update the Fuel Handling Accident Analysis ML24033A0542024-02-0101 February 2024 NRR E-mail Capture - FitzPatrick - Final HFE RAI Regarding Amendment to Update the Fuel Handling Accident Analysis ML24024A1372024-01-24024 January 2024 NRR E-mail Capture - Final Snsb RAI Regarding FitzPatrick Amendment to Modify Safety Relief Valves Setpoint Lower Tolerance ML24018A0012024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000333/2024010) and Request for Information ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23164A0322023-06-13013 June 2023 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000333/2023010 ML22321A0102022-11-17017 November 2022 Notification of Conduct of a Fire Protection Team Inspection ML22124A2672022-05-0404 May 2022 Request for Additional Information for James A. FitzPatrick Nuclear Power Plant TSTF-505 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21187A0522021-07-0606 July 2021 Fitz RAI Regarding FitzPatrick Amendment Request to Modify SR 3.5.1.6 ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21041A1932021-02-10010 February 2021 Request for Information for a Triennial Baseline Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements Inspection; Inspection Report (05000333/2021011) ML20066L3682020-03-0505 March 2020 Request for Additional Information: License Amendment Request for Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment ML20056E7992020-02-25025 February 2020 Request for Additional Information for LAR on Primary Containment Hydrodynamic Loads ML20035D5762020-02-0303 February 2020 Request for Additional Information: License Amendment Request for Application of the Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequence ML20027A0112020-01-23023 January 2020 Request for Additional Information: License Amendment Request for Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation ML19353A9452019-12-19019 December 2019 Request for Additional Information: License Amendment Request for Application of the Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequences ML19322A0062019-11-15015 November 2019 NRR E-mail Capture - Fermi 2: Request for Additional Information- Relief Request VRR-006, Proposed Alternative for Preservice Testing of Butterfly Valves ML19280A0372019-10-0505 October 2019 NRR E-mail Capture - FitzPatrick Revised Request for Additional Information: Emergency Amendment to Extend Completion Time of Transformer to 21 Days ML19280A0392019-10-0505 October 2019 NRR E-mail Capture - FitzPatrick Additional Request for Additional Information: Emergency Amendment to Extend Completion Time of Transformer to 21 Days ML19280A0362019-10-0404 October 2019 NRR E-mail Capture - FitzPatrick Request for Additional Information: Emergency Amendment to Extend Completion Time of Transformer to 21 Days ML19099A2672019-04-16016 April 2019 Use of Encryption Software for Electronic Transmission of Safeguards Information ML19099A2852019-03-12012 March 2019 Draft RAI: FitzPatrick Request to Update Electronic Transmission of Safeguards Information ML19025A1202019-01-24024 January 2019 NRR E-mail Capture - Calvert Cliffs, Fitzpatrick, and Nine Mile Point - Request for Additional Information Regarding License Amendment Request to Revise Emergency Response Organization Staffing ML18353B5112018-12-20020 December 2018 Request for Additional Information Relief Request No. 14R-22, for Fourth 10-Year Inservice Inspection Interval ML18164A3652018-06-13013 June 2018 NRR E-mail Capture - FitzPatrick RAIs - LAR to Adopt EAL Schemes Pursuant to NEI 99-01, Revision 6 ML18094B0922018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to B. S. Ford RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59) ML18085A6922018-03-26026 March 2018 NRR E-mail Capture - James A. FitzPatrick Nuclear Power Plant, Unit 1 - Request for Information to Adopt Traveler TSTF-542, RPV Water Inventory Control ML18085A6912018-03-23023 March 2018 NRR E-mail Capture - Draft Request for Information (RAI) for JAFNPP Traveler TSTF-542, RPV Water Inventory Control ML18029A8422018-01-29029 January 2018 NRR E-mail Capture - Request for Additional Information: FitzPatrick License Amendment Request to Revise Technical Specifications to Address Secondary Containment Personnel Access Door Openings ML17335A1002017-11-29029 November 2017 NRR E-mail Capture - FitzPatrick - Request for Additional Information - Relief Request 15R-02 Regarding the Use of BWRVIP Guidelines Instead of ASME Code (CAC: MG0116; EPID: L-2017-LLR-0083) ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. ML17228A0052017-08-15015 August 2017 NRR E-mail Capture - Request for Additional Information - St. Lucie Relief Request #3 - Icw 30 Pipe Defect Removal (MF9288) ML16299A0192016-11-0202 November 2016 Request for Additional Information Regarding Direct License Transfer from Entergy to Exelon ML16287A6502016-10-21021 October 2016 Request for Additional Information Regarding: License Amendment Request to Revise Technical Specifications Section 5.5.6 for Extension of Type a and Type C Leak Rate Test Frequencies ML16280A5732016-10-18018 October 2016 Request for Additional Information Relief Request for Proposed Alternative for the Implementation of BWRVIP-05 ML16117A1862016-04-26026 April 2016 Entergy Fleet Relief Request EN-ISI-15-1 Request for Additional Information - 04/26/16 Email from R. Guzman to G. Davant (CAC Nos. MF7133-MF7136) ML16013A0642016-01-13013 January 2016 NRR E-mail Capture - Request for Additional Information Entergy CNRO-2015-00023 - Revision to Entergy Quality Assurance Program Manual (Fleet Submittal CAC Nos. MF7086-MF7097) ML15341A1662015-12-0707 December 2015 NRR E-mail Capture - Entergy Fleet RR-EN-15-1, Request for Additional Information (CACs MF6341-MF6349) ML14240A6122014-09-24024 September 2014 Request for Additional Information Regarding Proposed Changes to the Technical Specification Low Pressure Safety Limit ML14184A6152014-07-25025 July 2014 Request for Additional Information Regarding Proposed Safety Limit Minimum Critical Power Ratio License Amendment ML14195A0972014-07-16016 July 2014 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Hazard and Screening Report ML14164A5382014-07-0202 July 2014 Request for Additional Information Regarding 10 CFR 50.55A Alternate Request PRR-05 (Tac No. MF3680) ML14093A6772014-05-0101 May 2014 SONGS - Request for Additional Information Concerning Pre-Emption Authority ML13338A6452013-12-12012 December 2013 Interim Staff Evaluation and Request for Additional Information, Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation 2024-07-12
[Table view] |
Text
February 9, 2006 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
JAMES A. FITZPATRICK NUCLEAR POWER PLANT - REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST RR-39, IMPLEMENTATION OF BWRVIP GUIDELINES (TAC NO. MC8587)
Dear Mr. Kansler:
On October 7, 2005, Entergy Nuclear Operations, Inc. (Entergy), submitted a relief request for the James A. FitzPatrick Nuclear Power Plant which would implement various Boiling Water Reactor Vessel Internals Program (BWRVIP) guidelines in lieu of the American Society for Mechanical Engineers Boiler and Pressure Vessel Code inspection requirements on reactor vessel internals and components.
The Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). On February 6, 2006, the Entergy staff indicated that a response to the RAI would be provided within 60 days.
Please contact me at (301) 415-2901 if you have any questions on this issue.
Sincerely,
/RA/
John P. Boska, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-333
Enclosure:
RAI cc w/encl: See next page
ML060390736 *see memo dated February 1, 2006 OFFICE LPL1-1/PM LPL1-1/LA CVIB/BC LPL1-1/BC NAME JBoska SLittle MMitchell* RLaufer DATE 2/09/06 2/09/06 2/01/06 2/09/06
FitzPatrick Nuclear Power Plant cc:
Mr. Gary J. Taylor Resident Inspector's Office Chief Executive Officer James A. FitzPatrick Nuclear Power Plant Entergy Operations, Inc. U. S. Nuclear Regulatory Commission 1340 Echelon Parkway P.O. Box 136 Jackson, MS 39213 Lycoming, NY 13093 Mr. John T. Herron Ms. Charlene D. Faison Sr. VP and Chief Operating Officer Manager, Licensing Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.
440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Mr. Theodore A. Sullivan Mr. Michael J. Colomb Site Vice President Director of Oversight Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant 440 Hamilton Avenue P.O. Box 110 White Plains, NY 10601 Lycoming, NY 13093 Mr. David Wallace Mr. Kevin J. Mulligan Director, Nuclear Safety Assurance General Manager, Plant Operations Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc. James A. FitzPatrick Nuclear Power Plant James A. FitzPatrick Nuclear Power Plant P.O. Box 110 P.O. Box 110 Lycoming, NY 13093 Lycoming, NY 13093 Mr. James Costedio Mr. Oscar Limpias Manager, Regulatory Compliance Vice President Engineering Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc. James A. FitzPatrick Nuclear Power Plant 440 Hamilton Avenue P.O. Box 110 White Plains, NY 10601 Lycoming, NY 13093 Mr. Christopher Schwarz Mr. Travis C. McCullough Vice President, Operations Support Assistant General Counsel Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.
440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Mr. John F. McCann Mr. Charles Donaldson, Esquire Director, Licensing Assistant Attorney General Entergy Nuclear Operations, Inc. New York Department of Law 440 Hamilton Avenue 120 Broadway White Plains, NY 10601 New York, NY 10271
FitzPatrick Nuclear Power Plant cc:
Regional Administrator, Region I Ms. Stacey Lousteau U.S. Nuclear Regulatory Commission Treasury Department 475 Allendale Road Entergy Services, Inc.
King of Prussia, PA 19406 639 Loyola Avenue Mail Stop L-ENT-15E Oswego County Administrator New Orleans, LA 70113 Mr. Steven Lyman 46 East Bridge Street Oswego, NY 13126 Mr. Peter R. Smith, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy New York State Dept. of Public Service 3 Empire State Plaza Albany, NY 12223-1350 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. James H. Sniezek BWR SRC Consultant 5486 Nithsdale Drive Salisbury, MD 21801-2490 Mr. Michael D. Lyster BWR SRC Consultant 5931 Barclay Lane Naples, FL 34110-7306
REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST RR-39 ENTERGY NUCLEAR OPERATIONS, INC.
JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET NO. 50-333 By letter dated October 7, 2005, Agencywide Documents Access and Management System accession number ML052900075, Entergy Nuclear Operations Inc. (Entergy or the licensee) submitted relief request RR-39 for the James A. FitzPatrick Nuclear Power Plant (JAFNPP).
The licensee proposes to use Boiling Water Reactor Vessel Internal Program (BWRVIP) guidelines as an alternative to certain requirements of Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessl Code (ASME Code) for inservice inspection of Reactor Pressure Vessel (RPV) internal components.
The Nuclear Regulatory Commission (NRC) staff has reviewed the information the licensee provided that supports the proposed relief request and would like additional information to clarify the submittal:
- 1. According to Sections 3.3 and 3.4 of the BWRVIP-76, BWR Vessel and Internals Project, BWR Core Shroud and Flaw Evaluation Guidelines report, core shroud welds shall be inspected every 6 years when the enhanced visual test (EVT-1) method is used for one-sided weld inspections, and shall be inspected every 10 years when the subject welds are examined with the ultrasonic test (UT) method. The inspection frequency for the core shroud welds as indicated in Section 6.4 of the submittal is not consistent with the aforementioned requirement. Therefore, the NRC staff requests that the licensee revise the inspection frequency requirement for the subject welds in Section 6.4 of the submittal.
- 2. In Attachment 2 of the submittal, the licensee provides a comparison of ASME Category B--1 and B--2 examination requirements with the BWRVIP guidelines. The NRC staff requests that the licensee include the following welds in this attachment.
(A) ASME Item B13.30, Table IWB-2500-1, Shroud support welds H9 and H12.
(B) ASME Item B13.40, Table IWB-2500-1, Shroud horizontal welds H1 and H2.
(C) ASME Item B13.40, Table IWB-2500-1, Shroud H8 Attachment welds.
- 3. According to Figure 3-3 of the BWRVIP-76 report, vertical and top guide ring segment welds shall be inspected every 6 years when the EVT-1 is used for one-sided weld inspections and shall be inspected every 10 years when the subject welds are examined with the UT method. In Attachment 2 of the submittal, the inspection frequency Enclosure
requirement for the vertical and top guide ring segment welds (Item B13.40 in Table IWB-2500-1 of the ASME Code,Section XI) is not consistent with the aforementioned requirement specified in the BWRVIP-76 report. Therefore, the NRC staff requests that the licensee revise the inspection frequency requirement for the subject welds in Attachment 2 of the submittal.
- 4. In Attachment 2 of the submittal, the licensee indicates that the BWRVIP-38, BWR Vessel Internal Project, BWR Shroud Support Inspection and Flaw Evaluation Guidelines, report will be used for inspecting core shroud attachment welds. The staffs final safety evaluation (SE) of the BWRVIP-38 report indicates that when inspection tooling and methodologies are developed that allow the welds in the lower plenum to be accessible, the guidelines will state that the licensee will inspect these welds with the appropriate non-destructive examination methods in order to establish a baseline for these welds. One of the core shroud attachment welds that has limited accessibility in the lower plenum is the H12 weld. Therefore, the NRC staff requests that the licensee revise Attachment 2 to include a commitment that the shroud support weld-H12 be inspected when the inspection tooling and methodologies permit such an inspection.
- 5. In Attachment 4 of the submittal, the licensee does not address the inspection requirements for the following welds, and the NRC staff requests that the licensee include them in this attachment.
Jet pumps riser welds-RS-4 and RS-5.
- 6. In a letter dated October 1, 2003, the licensee submitted a similar relief request for the Vermont Yankee Nuclear Power Station (VYNPS). The NRC staff approved the VYNPS relief request by an SE dated September 19, 2005. In Table 1 of the VYNPS relief request, the licensee provided details of its inspection requirements for the reactor vessel internals (RVI) components and the corresponding inspection bases that were delineated in the respective BWRVIP reports. The NRC staff requests that the licensee provide similar inspection requirements and the inspection frequency for the JAFNPPs RVI components. This information will enable the NRC staff to perform an effective review of the BWRVIP inspection criteria that will be used by the licensee for the JAFNPPs RVI components.