MONTHYEARML22034A3992022-02-16016 February 2022 Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion ML22034A3972022-02-16016 February 2022 Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion ML22034A3952022-02-16016 February 2022 Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion ML16285A3202016-10-12012 October 2016 ROP PI Frequently Asked Questions (Faqs): 13-04 ML16159A4002016-06-16016 June 2016 Iepra Ror for Point Beach SE Section 3.4 ML16159A4022016-06-16016 June 2016 Fpra Ror for Point Beach SE Section 3.4 ML15261A7492015-09-14014 September 2015 NRC Supplement to NRC Letter - Notification of NRC Inspection and Request for Information Dated May 1, 2015 - NextEra Energy Point Beach Nuclear Plant (Msh) ML16072A0362015-06-0303 June 2015 Receipt of Cd Containing Revised I/O Files from NextEra Point Beach Nuclear Plant Flood Hazard Re-Evaluation Report ML15014A1602015-01-14014 January 2015 Attachment 2 - NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process ML15014A1532015-01-14014 January 2015 Attachment 1- NEI Comments on NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process ML14314A5122014-11-13013 November 2014 Enclosure 2 - Frequently Asked Questions (Faqs) Discussed During the October 22 2014 Reactor Oversight Process Public Meeting ML14147A0112014-06-20020 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML14149A1532014-05-0101 May 2014 FOIA/PA-2014-0074 - Resp 4 - Partial. Group F (Records Already Publicly Available) ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1017301232010-06-0909 June 2010 Green Ticket Tritium Releases ML0806704192008-03-0707 March 2008 CDBI Findings ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0726203022007-09-28028 September 2007 Amendment to Indemnity Agreement No. B-41, Amendment No. 14 ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0635404332006-12-20020 December 2006 Enclosure 2 - Consent and Hearing Waiver Form - the Nuclear Management Company, LLC ML0634705992006-12-14014 December 2006 Plant Service List ML0627903812006-09-29029 September 2006 Exhibit 26 to Case No. 2-2002-004, Interview Report ML0626801502006-09-22022 September 2006 Escort Ratio for Visitors ML0626503122006-09-0101 September 2006 Liquid Radiation Release Lessons Learned Task Force Final Report (Enclosure) ML0626504142005-11-0303 November 2005 RIII-2005-A-0062 Closure ML0626802782005-08-29029 August 2005 3rd ARB Action Plan RIII-05-A-0062 (Point Beach) ML0626802752005-08-22022 August 2005 2nd ARB Action Plan, RIII-05-A-0062 (Point Beach) ML0626504072005-07-19019 July 2005 Action Request - Corrective Action Program (CAP) ML0626802642005-07-18018 July 2005 Initial ARB Action Plan RIII-05-A-0062 (Point Beach) ML0518603982005-07-15015 July 2005 NRC Actions Under the Reactor Oversight Process for the Point Beach Nuclear Plant, Units 1 and 2 ML0518903972005-07-0101 July 2005 Log Entries Report ML0518903962005-07-0101 July 2005 U1R28 Outage Risk Plan Ppg Outage Management ML0518903952005-07-0101 July 2005 U1R28 Add/Delete Log ML0626504032005-06-22022 June 2005 Action Request - Corrective Action Program (CAP) (CAP065250) ML0626503992005-06-10010 June 2005 Action Request - Corrective Action Program (CAP) (CAP065041) ML0626504012005-06-10010 June 2005 Action Request - Corrective Action Program (CAP) (CAP065035) ML0515202282005-05-24024 May 2005 EP FFD Questions Not Asked ML0514700842005-05-24024 May 2005 COLR 28 Replaced with COLR 29 Prior to Vessel Removal. Attach: 04/14/2004 Condition Evaluation 013784. Attach: 04/12/2004 CAP 055612. Attach: Undated Bullet Nose Disconnected & Removed with Head ML0515202262005-05-24024 May 2005 2SI-825B Not Full Open with Handwritten Notations ML0515202242005-05-24024 May 2005 Phone Line Through Containment Hatch While Fuel Movement in Progress ML0515202232005-05-24024 May 2005 Loss of SFP Cooling Due to Breaker Miss Alignment ML0515202212005-05-24024 May 2005 2SI-825B Not Full Open with Handwritten Notations ML0515202192005-05-24024 May 2005 U1R28 Interim Exit Meeting Notes ML0515202182005-05-24024 May 2005 Tsac Not Entered When Source Range Audible Count Rate Removed from Service ML0515202072005-05-24024 May 2005 Questions for Followup Based on Last Outage ISI Summary Report ML0514700772005-05-24024 May 2005 Refuel Outage 1R28 Resident Inspector Coverage ML0514700822005-05-24024 May 2005 Mikes 2004-03 IR Section Write Ups, 2T-34A Accumulator Level Indication ML0515201472005-05-24024 May 2005 Phone Line Through Containment Hatch While Fuel Movement in Progress ML0515202132005-05-24024 May 2005 Inservice Inspection Document Request ML0515201492005-05-24024 May 2005 Transient Combustible Materials in Containment & Turbine Building Without Administrative Controls 2022-02-16
[Table view] |
Text
'T-TeamTrack Reports Page 27 of 40 NMC > Sites > Point Beach -Action Request > Corrective Actn Program (CAP) AR Section 1 Activity Request Id: CAP065250 Activity Type: CAP Submit Date: 6/21/2005 3:30:00 PM One Line
Description:
BOP Testing methodology of PAT may not meet 2003 AA/FFD order.
0 Detailed
Description:
6/21/2005 3:30:00 PM - ANDERSON, RENEE G.:
During security inspections of NMC facilities, inspectors questioned the BOP (behavior observation program) /
portion of the GAT testing methodology and were concerned that it may not meet the intent of the 2003 AA/FFD order.
The Behavior Observation Program (BOP) is a required element of NRC regulations and orders on access authorization and Fitness For Duty (FFD). NMC currently covers BOP training as part of Plant Access Training (PAT) and/or FFD training. The NRC questioned if a separate test on BOP responsibilities, or a separate grading of BOP portions of a comprehensive PAT examination, is required to meet NRC BOP training requirements.
Ultimately the NRC issued green findings for Kewaunee and DAEC based on the BOP testing methods in PAT but determined that neither a separate test on BOP or grading of BOP portions of a comprehensive PAT examination are is required provided the training adequately covers required BOP training elements and the licensee has Implemented a method to ensure the training has achieved the desired results. This may be accomplished through testing. If testing is used, licensee should determine effective means of remediation for exam failures and incorrect responses to questions.
Initiator: ANDERSON, RENEE G. Initiator Department: TT Training Technical (RP/Chem/EP)
PBZ Date/Time of Discovery: 6/21/2005 3:23:16 PM Date/Time of Occurrence: 6/21/2005 3:23:16 PM Identified By: External Other System: (None)
Equipment # (1st): (None) Equipment Name (1st): (None)
Equipment # (2nd): (None) Equipment Name (2nd): (None)
Equipment # (3rd): (None) Equipment Name (3rd): .(None)
Site/Unit: Point Beach - Common Why did this occur?: 6/21/2005 3:30:00 PM - ANDERSON, RENEE G.:
NRC inspection of two NMC plant's FFD training programs.
Immediate Action Taken: 6/21/2005 3:30:00 PM - ANDERSON, RENEE G.:
To satisfy the BOP concerns identified by the NRC, NMC agreed to formalize the exam analysis process and BOP testing methods. To ensure this occurs the NMC GAT team made the following changes in Rev. 2 of the GAT Training Program
Description:
3.1.4 Fleet GAT TAC is responsible for performing exam analysis per Training Fleet Procedure (FP-T-SAT-40)
Implementation Phase, annually (not to exceed 15 months).
3.4.7 The Plant Access Training (PAT) examination shall consist of 50 multiple-choice questions based on PAT learning objectives. 10-15 of the 50 questions shall be based on Fitness For Duty (FFD) learning objectives with a minimum of 5 questions based on Behavior Observation Program (BOP) objectives.
The NMC GAT team also verified that the electronic testing for PAT through LMS is programmed to ensure at lease 5 questions are included from BOP objectives.
Recommendations: 6/21/2005 3:30:00 PM - ANDERSON, RENEE G.:
Close to actions taken. Each site is initiating a cap to document the actions taken in response to the NRC Green Finding 0 SRO Review Required?: N Section 2 Operability Status: NA 0 Compensatory Actions: N Basis for Operability: 6/21/2005 4:04:11 PM - HILL, CLAY:
http://enwsQ2/tmtrackltmtrack.dll?ReportPage&Template=reports%2Frptexec&Reportld=5562/20 6/22/2005
Te-amTrack Reports Page 28 of 40 Admin issue only.
D Unplanned TSAC Entry: N External Notification: N http://enws02ltmtrackltmtrack.dl]?ReportPage&Template~reports%2Frptexec&ReportId=556/225 6/22/2005