Category:Letter
MONTHYEARML24289A0312024-11-0808 November 2024 – Issuance of Amendments Related to the Removal of License Condition 2.F as Part of the Consolidated Line-Item Improvement Process (CLIIP) IR 05000382/20240032024-11-0808 November 2024 Integrated Inspection Report 05000382/2024003 05000382/LER-2024-001-01, Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure2024-11-0707 November 2024 Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure IR 05000382/20244022024-10-10010 October 2024 Security Baseline Inspection Report 05000382/2024402 Public IR 05000382/20244032024-10-0909 October 2024 Security Baseline Inspection Report 05000382/2024403 IR 05000382/20240112024-10-0101 October 2024 State Fire Protection Team Inspection Report 05000382/2024011 ML24229A1042024-09-25025 September 2024 Integrated Inspection Report 05000382/2023004, Disputed Non-Cited Violation Revised ML24268A1132024-09-24024 September 2024 Acknowledgment of Response to NRC Inspection Report 05000382/2024013, and Notice of Violation ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000382/20240052024-08-21021 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2024005 ML24228A2612024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 IR 05000382/20240132024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment 05000382/LER-2024-004, Automatic Reactor Trip Due to Lightning Strike2024-08-15015 August 2024 Automatic Reactor Trip Due to Lightning Strike IR 05000382/20240022024-08-0808 August 2024 Integrated Inspection Report 05000382/2024002 ML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML24213A1632024-08-0101 August 2024 2024 Waterford Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification 05000382/LER-2024-003, Automatic EFAS Actuation During Surveillance Test2024-07-10010 July 2024 Automatic EFAS Actuation During Surveillance Test ML24150A3852024-06-0404 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2024011) and Request for Information ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 IR 05000382/20230042024-05-20020 May 2024 Amended Integrated Inspection Report 05000382/2023004 05000382/LER-2024-002, Automatic Reactor Trip Due to Transformer Failure2024-05-16016 May 2024 Automatic Reactor Trip Due to Transformer Failure 05000382/LER-2024-001, Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure2024-05-15015 May 2024 Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000382/20240012024-05-0606 May 2024 Integrated Inspection Report 05000382/2024001 ML24067A1032024-04-25025 April 2024 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000382/20244012024-03-18018 March 2024 Material Control and Accounting Program Inspection Report 05000382/2024401 ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A3742024-03-15015 March 2024 Acknowledgement of Response to NRC Inspection Report 05000382/2023004 and Disputed Non-Cited Violation ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24032A0032024-03-0606 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0053 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000382/20230062024-02-28028 February 2024 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2023006 05000382/LER-2023-004, Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement2024-02-14014 February 2024 Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement ML24039A1992024-02-12012 February 2024 – Integrated Inspection Report 05000382/2023004 IR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and 05000382/LER-2023-003, Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing2023-12-30030 December 2023 Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation 2024-09-06
[Table view] Category:Licensee Response to Notice of Violation
MONTHYEARW3F1-2024-0041, Reply to a Notice of Violation, EA-24-0522024-09-19019 September 2024 Reply to a Notice of Violation, EA-24-052 W3F1-2024-0012, Response to NRC Integrated Inspection Report 05000382/20230042024-03-11011 March 2024 Response to NRC Integrated Inspection Report 05000382/2023004 W3F1-2023-0055, Reply to a Notice of Violation2023-12-14014 December 2023 Reply to a Notice of Violation W3F1-2023-0014, Reply to a Notice of Violation; EA-22-1192023-02-20020 February 2023 Reply to a Notice of Violation; EA-22-119 W3F1-2022-0058, Reply to a Notice of Violation; EA-22-0332022-10-12012 October 2022 Reply to a Notice of Violation; EA-22-033 W3F1-2021-0028, Response to an Apparent Violation in NRC Inspection Report 05000382/2021013; EA-20-1142021-04-0202 April 2021 Response to an Apparent Violation in NRC Inspection Report 05000382/2021013; EA-20-114 W3F1-2019-0045, Updated Reply to a Notice of Violation; NRC Inspection Report 05000382/20180082019-06-20020 June 2019 Updated Reply to a Notice of Violation; NRC Inspection Report 05000382/2018008 W3F1-2019-0033, (Waterford 3) - Reply to Notice of Violation EA-18-020 Supplement2019-05-17017 May 2019 (Waterford 3) - Reply to Notice of Violation EA-18-020 Supplement W3F1-2018-0073, (Waterford 3) - Reply to a Notice of Violation; NRC Inspection Report 05000382/20180082018-12-14014 December 2018 (Waterford 3) - Reply to a Notice of Violation; NRC Inspection Report 05000382/2018008 W3F1-2018-0056, Reply to Notice of Violation EA-18-0202018-09-12012 September 2018 Reply to Notice of Violation EA-18-020 W3F1-2013-0072, Reply to a Notice of Violation: EA-12-2572013-12-18018 December 2013 Reply to a Notice of Violation: EA-12-257 W3F1-2012-0097, Reply to a Notice of Violation: EA-12-1982012-12-0303 December 2012 Reply to a Notice of Violation: EA-12-198 W3F1-2009-0043, Reply to Non-Cited Violation2009-09-16016 September 2009 Reply to Non-Cited Violation ML0629303022006-10-18018 October 2006 Response to NRC Inspection Report 05000382/2006009 Notice of Violation W3F1-2006-0053, Reply to Notice of Violation: EA-06-1362006-09-29029 September 2006 Reply to Notice of Violation: EA-06-136 W3F1-2006-0048, Reply to Notice of Violation: EA-06-1922006-09-18018 September 2006 Reply to Notice of Violation: EA-06-192 W3F1-2004-0040, Reply to Notice of Violation, EA-03-230, NRC Inspection Report No. 50-382/03-0072004-05-12012 May 2004 Reply to Notice of Violation, EA-03-230, NRC Inspection Report No. 50-382/03-007 2024-09-19
[Table view] |
See also: IR 05000382/2006009
Text
October 18, 20006
EA-06-136
Joseph E. Venable
Vice President Operations
Waterford 3
Entergy Operations, Inc.
17265 River Road
Killona, LA 70066-0751
SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - RESPONSE TO NRC
INSPECTION REPORT 05000382/2006009 NOTICE OF VIOLATION
Dear Mr. Venable:
Thank you for your letter of September 29, 2006, in response to our letter and Notice of
Violation dated August 30, 2006, involving inaccurate information associated with the NRCs
Safety System Unavailability, High Pressure Injection and Residual Heat Removal Performance
Indicators. We have reviewed your reply and find it responsive to the concerns raised in our
Notice of Violation. We will review the implementation of your corrective actions during a future
inspection to determine that full compliance has been achieved and will be maintained.
Sincerely,
/RA/
Zachary K. Dunham, Chief
Branch E
Division of Reactor Projects
Docket: 50-382
License: NPF-38
Entergy Operations, Inc. -2-
cc:
Senior Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, MS 39286-1995
Vice President, Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, MS 39286-1995
Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, MS 39205
General Manager, Plant Operations
Waterford 3 SES
Entergy Operations, Inc.
17265 River Road
Killona, LA 70066-0751
Manager - Licensing Manager
Waterford 3 SES
Entergy Operations, Inc.
17265 River Road
Killona, LA 70066-0751
Chairman
Louisiana Public Service Commission
P.O. Box 91154
Baton Rouge, LA 70821-9154
Director, Nuclear Safety &
Regulatory Affairs
Waterford 3 SES
Entergy Operations, Inc.
17265 River Road
Killona, LA 70066-0751
Richard Penrod, Senior Environmental
Scientist
Office of Environmental Services
Northwestern State University
Russsell Hall, Room 201
Natchitoches, LA 71497
Entergy Operations, Inc. -3-
Parish President
St. Charles Parish
P.O. Box 302
Hahnville, LA 70057
Winston & Strawn LLP
1700 K Street, N.W.
Washington, DC 20006-3817
Entergy Operations, Inc. -4-
Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (RJC1)
Senior Resident Inspector (GFL1)
Branch Chief, DRP/E (ZKD)
Senior Project Engineer, DRP/E (DLL1)
Team Leader, DRP/TSS (RLN1)
RITS Coordinator (KEG)
SUNSI Review Completed: __ZKD____ ADAMS: / Yes G No Initials: __ZKD____
/ Publicly Available G Non-Publicly Available G Sensitive / Non-Sensitive
R:_REACTORS\WAT\2006\W3 RP2006-09 Response.wpd
RIV:C:DRP/E
ZKDunham
/RA/
10/18/06
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax