Temporary Instruction 2515/177 Inspection Document Request
ML12166A190
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/11/2012
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Kaminskas V
FirstEnergy Nuclear Operating Co
References
IR-12-005
Download: ML12166A190 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 11, 2012 Mr. Vito Kaminskas Site Vice President, Nuclear FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097

SUBJECT:

PERRY NUCLEAR POWER PLANT - NOTIFICATION OF AN NRC INSPECTION REGARDING THE MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS; AND REQUEST FOR INFORMATION

Dear Mr. Kaminskas:

On September 17, 2012, the U.S. Nuclear Regulatory Commission (NRC) will begin the on-site portion of the Gas Accumulation Management in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Temporary Instruction at your Perry Nuclear Power Plant. This inspection will be performed in accordance with NRC Temporary Instruction (TI) 2515/177.

In order to minimize the impact that the inspections have on the site and to ensure a productive inspection, we have enclosed a request for documents needed for the inspection. The documents have been divided into three groups:

  • The first group lists information necessary for our initial inspection-scoping activities.

This information should be available to the inspector no later than August 10, 2012.

By August 20, 2012, the inspector will communicate the initial selected samples.

  • The second group is needed to support our in-office preparation activities. This set of documents should be available at the Region III office no later than September 5, 2012.

This information should be separated by information request number, especially if provided electronically (e.g., folder with the information request number). During the in-office preparation activities, the inspectors may identify additional information needed to support the inspection. The lead inspector will provide a list of the additional information needed during the week of September 10, 2012.

  • The last group includes the additional information requested above as well as plant-specific reference material. This information should be available to the inspector on September 17, 2012. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the inspector as the documents are generated.

V. Kaminskas It is important that these documents be as complete as possible, in order to minimize the number of documents requested during the preparation week or during the on-site inspection.

If no activities were accomplished associated with a specific request, then provide a statement indicating that the request is not applicable.

Please send the information to the lead inspector, Jorge J. Corujo-Sandín, at the following e-mail address: jorge.corujo-sandin@nrc.gov. A hard-copy with the required information is also an acceptable option. If there are questions about the material requested, or the inspection, please call Mr. Corujo-Sandin at (630) 829-9741.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-440 License No. NPF-58

Enclosure:

As stated cc w/encl: Distribution via ListServ TM

TEMPORARY INSTRUCTION 2515/177 INSPECTION DOCUMENT REQUEST Inspection Report: 05000440/2012005(DRS)

Inspection Dates: September 17 - 21, 2012 October 1 - 5, 2012 Inspection Procedure: TI 2515/177, Management of Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Inspector: Jorge J. Corujo-Sandín (630) 829-9741 jorge.corujo-sandin@nrc.gov I. Information Requested By August 10, 2012

1. Copy of the station's response to Generic Letter (GL) 2008-01 and any supplemental report.
2. Copies of all Requests for Additional Information and the associated responses.
3. List of corrective action program documents (with a short description) associated with GL 2008-01, voids in piping, gas intrusion events, and pressure transients for the previous three years that affected the subject systems (i.e., emergency core cooling, decay heat removal, and containment spray systems).
4. List of the suction piping sections identified as susceptible to gas accumulation (the list should identify the corresponding system).
5. List of the discharge piping sections identified as susceptible to gas accumulation (the list should identify the corresponding system).
6. List of changes (with a short description and tracking number) to the Final Safety Evaluation Report (FSAR), Technical Specifications, Technical Specification Bases, and Technical Requirement Manual associated with the resolution of GL 2008-01.
7. List of calculations associated with GL 2008-01 (with a short description of the calculation and the change), including calculations that have been changed or created in response to GL 2008-01.

1 Enclosure

TEMPORARY INSTRUCTION 2515/177 INSPECTION DOCUMENT REQUEST II. Information Requested By September 5, 2012

1. Copies of program documents and procedures developed to implement the resolution of GL 2008-01.
2. Copies of the selected corrective action program documents.
3. Copies of the selected licensing and design basis document changes.
4. Copies of the selected calculations.
5. List of commitments (with a description) done in response to GL 2008-01.
6. List of actions that were completed in response to GL 2008-01.
7. List of outstanding actions that will be completed in response to GL 2008-01 and the completion schedule (include the documents that are tracking their completion such as work orders or corrective action documents).
8. Copies of all the corrective actions identified in the nine-month response and supplemental reports.
9. List (with a short description) of gas intrusion mechanisms that apply to the plant and the affected system locations (e.g., identify the source, conditions, and expected void locations).
10. Design basis documents of the subject systems.
11. Design basis documents of keep-full systems of the subject systems.
12. Copies of the construction code pages of the subject systems that discuss waterhammer or flow-induced dynamic loading. Also, include the associated Design Specification pages.
13. Provide the following description for the pumps of the subject systems: (1) flowrate at best efficiency point; (2) maximum and minimum flowrate during accident conditions and shutdown cooling; (3) number of pump stages; (4) if a pump is multi-stage, indicate if the shaft is stiff or flexible (include the basis for this determination); (5) pump head required to meet operability requirements; and (6) un-degraded pump head.
14. Copies of self-assessments associated with the implementation of the GL 2008-01 program and the associated corrective action program documents (include the attachments, if any).
15. Copies of corrective action program implementing procedures.
16. Copies of the operability determination procedures.

2 Enclosure

TEMPORARY INSTRUCTION 2515/177 INSPECTION DOCUMENT REQUEST

17. Electronic copies of piping and instrumentation diagrams (P&IDs) of the subject systems.
18. If available, electronic copies of the current Technical Specifications, Technical Specifications Basis, FSAR, and Technical Report Manual.

III. Information Requested to be Available on First Day of Inspection, September 17, 2012

1. Copies of surveillance procedures associated with the resolution of GL 2008-01, and the results of the last two surveillances for the subject systems.
2. Copies of the modification packages for hardware modifications as part of the resolution of GL 2008-01.
3. Copies of procedures use for detecting and determining void volumes.
4. Copies of procedures use for filling and venting.
5. Copies of surveillance procedures that establish flow at the subject systems (e.g., surveillances where the pumps are operated).
6. Subject systems walkdown work documents associated with the resolution of GL 2008-01 and the results of these walkdowns.
7. Copies of the engineering evaluations performed for all identified voids.
8. A list of all piping locations that are currently voided and their associated evaluation.
9. Copies of trends of periodic gas accumulation monitoring results (e.g., venting, ultrasonic tests).
10. Copy of the design change review checklist.
11. Copies of training documents that ensure that personnel are aware of gas-related concerns. Include the scheduled or attendance list of training that was already conducted.
12. Copy of the void transport analysis.
13. Basis for the void acceptance criteria (e.g., calculation). If applicable, provide the justification for any deviation from the void acceptance criteria established by the Office of Nuclear Reactor Regulation.
14. Basis for horizontal pipe acceptance criteria (e.g., calculation).

3 Enclosure

TEMPORARY INSTRUCTION 2515/177 INSPECTION DOCUMENT REQUEST

15. If applicable, provide a list of inaccessible locations where plant walkdowns of the subject systems have not been completed. Include an explanation of why each area is considered inaccessible.
16. Hard copies of isometric drawings of the subject systems (11 x 17 or similar size is preferred, if legible).
17. Hard copies of P&IDs of the subject systems (11 X 17 or similar size is preferred, if legible).

If you have any questions regarding the information requested, please contact the lead inspector.

4 Enclosure

V. Kaminskas It is important that these documents be as complete as possible, in order to minimize the number of documents requested during the preparation week or during the on-site inspection. If no activities were accomplished associated with a specific request, then provide a statement indicating that the request is not applicable.

Please send the information to the lead inspector, Jorge J. Corujo-Sandín, at the following e-mail address: jorge.corujo-sandin@nrc.gov. A hard-copy with the required information is also an acceptable option. If there are questions about the material requested, or the inspection, please call Mr. Corujo-Sandin at (630) 829-9741.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-440 License No. NPF-58

Enclosure:

As stated cc w/encl: Distribution via ListServ TM DISTRIBUTION:

See next page DOCUMENT NAME: Ltr 061112 Perry - RFI - TI177.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME JCorujo-Sandin AMStone:cs DATE 06/11/12 06/11/12 OFFICIAL RECORD COPY

Letter to Mr. Vito Kaminskas from Ms. Ann Marie Stone dated June 11, 2012.

SUBJECT:

PERRY NUCLEAR POWER PLANT - NOTIFICATION OF AN NRC INSPECTION REGARDING THE MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS; AND REQUEST FOR INFORMATION DISTRIBUTION:

Michael McCoppin RidsNrrPMPerry Resource RidsNrrDorlLpI3-2 Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak