ML081370039

From kanterella
Revision as of 17:37, 14 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Regarding Letter, Dated May 8, 2008, Main Steam Line Limit Curves
ML081370039
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 05/22/2008
From: John Lamb
NRC/NRR/ADRO/DORL/LPLI-2
To: Keenan J
Public Service Enterprise Group
Lamb John G./NRR/DORL, 415-3100
References
TAC MD3002
Download: ML081370039 (5)


Text

May 22, 2008 Mr. Jeffrie Keenan Manager - Licensing Hope Creek Generating Station PSEG Nuclear LLC P.O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

PSEG NUCLEAR LLC, REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR HOPE CREEK GENERATING STATION REGARDING LETTER, DATED MAY 8, 2008, MAIN STEAM LINE LIMIT CURVES (TAC NO. MD3002)

Dear Mr. Keenan:

By letter dated May 8, 2008, you submitted an affidavit executed by Barbara A. Agans on behalf of Continuum Dynamics, Inc. (C.D.I.), dated May 1, 2008, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 2, Section 2.390:

Continuum Dynamics, Inc. Technical Note No.07-29P, Limit Curve Analysis with

[Acoustic Circuit Model] ACM Rev. 4 for Power Ascension at Hope Creek Unit 1, Revision 1.

A nonproprietary copy of this document has been placed in the U.S. Nuclear Regulatory Commission=s (NRC=s) Public Document Room and added to the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room.

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

3(a) A process or method, including supporting data and analysis, where prevention of its use by C.D.I.=s competitors without license from C.D.I. constitutes a competitive advantage over other companies; 3(b) Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; 3(c) Information which discloses patentable subject matter for which it may be desirable to obtain patent protection.

J. Keenan We have reviewed your application and the material in accordance with requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version of the submitted information marked proprietary will be withheld from public disclosure pursuant to 10CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-3100.

Sincerely,

/ra/

John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354 cc. See next page

ML081370039 OFFICE LPL1-2/PM LPL1-1/LA EMCB/BC LPL1-2/BC NAME JLamb ABaxter KManoly HChernoff DATE 05/16/08 05/ 20 /08 05 / 20 /08 05 / 22 /08

Hope Creek Generating Station cc:

Mr. Thomas Joyce Mr. Michael Gaffney Senior Vice President - Operations Manager - Hope Creek Regulatory PSEG Nuclear Assurance P.O. Box 236 PSEG Nuclear Hancocks Bridge, NJ 08038 P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. Dennis Winchester Vice President - Nuclear Assessment Township Clerk PSEG Nuclear Lower Alloways Creek Township P.O. Box 236 Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Mr. Carl Fricker Mr. Paul Bauldauf, P.E., Asst. Director Vice President - Operations Support Radiation Protection Programs PSEG Nuclear NJ Department of Environmental P.O. Box 236 Protection and Energy Hancocks Bridge, NJ 08038 CN 415 Trenton, NJ 08625-0415 Mr. John Perry Plant Manager - Hope Creek Mr. Brian Beam PSEG Nuclear Board of Public Utilities P.O. Box 236 2 Gateway Center, Tenth Floor Hancocks Bridge, NJ 08038 Newark, NJ 07102 Mr. James Mallon Regional Administrator, Region I Manager - Licensing U.S. Nuclear Regulatory Commission PSEG Nuclear 475 Allendale Road P.O. Box 236 King of Prussia, PA 19406 Hancocks Bridge, NJ 08038 Senior Resident Inspector Mr. Jeffrie J. Keenan, Esquire Hope Creek Generating Station PSEG Nuclear - N21 U.S. Nuclear Regulatory Commission P.O. Box 236 Drawer 0509 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Mr. William Levis President & Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038