E-mail from C. Fletcher to S. Ninh, Re Crystal River SI Charter
ML100750291
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/08/2009
From: Fletcher C
NRC/RGN-II/DRS/EB3
To: Son Ninh
NRC/RGN-II/DRP/RPB3
References
FOIA/PA-2010-0010
Download: ML100750291 (5)


Text

Franke, Mark From: Fletcher, Cecil Sent: Thursday, October 08, 2009 4:48 PM To: Ninh, Son Cc: Franke, Mark

Subject:

Crystal River SI Charter Attachments: Crystal River SI Charter.doc

Son, Here is the copy of the CR3 charter with all of the initial corrections. Like we discussed earlier, Marilyn is out for the rest of the week, so please forward to your secretary for routing.

nQd US Nuclear Regulatory Commission Region II-Atlanta Reactor Inspector Division of Reactor Safety-EB3 404-562-4973

0 UNITED STATES A° NUCLEAR REGULATORY COMMISSION 0 *REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 MEMORANDUM TO: Louis F. Lake, Team Leader Special Inspection FROM: Luis A. Reyes Regional Administrator

SUBJECT:

SPECIAL INSPECTION CHARTER TO EVALUATE CRYSTAL RIVER CONTAINMENT BUILDING You have been selected to lead a Special Inspection to assess the circumstances associated with a gap discovered in the concrete of the containment building at Crystal River Unit 3. Your onsite inspection should begin on October 13, 2009. Robert Carrion, Senior Reactor Inspector, Roger Thomas, and an independent Civil Engineering Contractor (TBD) will assist you in this inspection.

A. Basis Recently, the plant shut down for a planned refueling outage and to replace the steam generators inside containment. in order to move the steam generators into containment, workers began removing concrete to create the necessary opening. During that work, a small gap was found while making approximately a 25 foot x 25 foot concrete cut (liner is still intact). The gap is about one half inch wide and 10 inches inward from the outside edge of the concrete and located just at the layer of horizontal tendons. The Crystal River containment is about 42 inches thick, contains both horizontal and vertical tensioned steel tendons, and is lined with steel plate.

The licensee is evaluating the extent of the condition. The discovery of this gap in the concrete does not represent an immediate safety concern because the plant is shut down.

In accordance with Management Directive 8.3, "NRC Incident Investigation Program,"

deterministic and conditional risk criteria were used to evaluate the level of NRC response for this event.

Based on the deterministic criteria that this issue involved possible adverse generic implications, the event was evaluated for risk in accordance with Management Directive 8.3. Due to lack of information on the structural integrity of the concrete containment and how it would interact with the free-standing steel liner during a seismic event in its current condition, a risk analysis was not able to be performed at this time. However, if CONTACT: Mark Franke RII/DRS 404-562-6349

MEMORANDUM TO: Louis F. Lake, Team Leader Special Inspection FROM: Luis A. Reyes Regional Administrator

SUBJECT:

SPECIAL INSPECTION CHARTER TO EVALUATE CRYSTAL RIVER CONTAINMENT BUILDING You have been selected to lead a Special Inspection to assess the circumstances associated with a gap discovered in the concrete of the containment building at Crystal River Unit 3. Your onsite inspection should begin on October 13, 2009. Robert Carrion, Senior Reactor Inspector, Roger Thomas, and an independent Civil Engineering Contractor (TBD) will assist you in this inspection.

A. Basis Recently, the plant shut down for a planned refueling outage and to replace the steam generators inside containment. In order to move the steam generators into containment, workers began removing concrete to create the necessary opening. During that work, a small gap was found while making approximately a 25 foot x 25 foot concrete cut (liner is still intact). The gap is about one half inch wide and 10 inches inward from the outside edge of the concrete and located just at the layer of horizontal tendons. The Crystal River containment is about 42 inches thick, contains both horizontal and vertical tensioned steel tendons, and is lined with steel plate.

The licensee is evaluating the extent of the condition. The discovery of this gap in the concrete does not represent an immediate safety concern because the plant is shut down.

In accordance with Management Directive 8.3, "NRC Incident Investigation Program," deterministic and conditional risk criteria were used to evaluate the level of NRC response for this event.

Based on the deterministic criteria that this issue involved possible adverse generic implications, the event was evaluated for risk in accordance with Management Directive 8.3. Due to lack of information on the structural integrity of the concrete containment and how it would interact with the free-standing steel liner during a seismic event in its current condition, a risk analysis was not able to be performed at this time.

However, if CONTACT: Mark Franke RII/DRS 404-562-6349 A PUBLICLY AVAILABLE 0 NON-PUBLICLY AVAILABLE 0 SENSITIVE El NON-SENSITIVE ADAMS: 0 Yes ACCESSION NUMBER:__________ 0 SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRS RII:DRP RII:DRS RII:DRS RII:DRP HQ:NRR SIGNATURE NAME SNinh CFletcher MSykes MFranke KKennedy LWert MKhanna DATE 10/ /2009 10/ /2009 10/ /2009 10/ /2009 10/ /2009 10/ /2009 10/ /2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\DOCUMENTS AND SE'I-NGSJER6\LOCAL SE'-INGS\TEMPORARY INTERNET FILES\CONTENT.OUTLOOK\JQXD81H4\CRYSTAL RIVER SI CHARTER (6).DOC

L. Lake 2 the concrete containment reacted adversely with the free-standing steel liner during a seismic event, LERF would be adversely affected and a Special Inspection would be warranted. Therefore, Region II determined that the appropriate level of NRC response was to conduct a Special Inspection.

B. Scope The inspection is expected to perform data gathering and fact-finding in order to address the following:

1. Develop a complete description of the problems and circumstances surrounding the gap in the containment building.
2. Verify that the licensee has appropriately evaluated Operability and Reportability.
3. Review structural integrity testing data of the containment.
4. Assess the adequacy of the licensee's maintenance and inspection programs related to this event.
5. Assess the licensee's activities related to the problem investigation (e.g., root cause analysis, extent of condition, etc).
6. Collect data necessary to develop and assess the safety significance of any findings in accordance with IMC 0609, "Significance Determination Process."
7. Determine potential generic issues or any design and construction inadequacies and make recommendations for appropriate follow-up actions (e.g., Information Notices, Generic Letters, and Bulletins).

C. Guidance Inspection Procedure 93812, "Special Inspection," provides additional guidance to be used during the conduct of the Special Inspection. Your duties will be as described in Inspection Procedure 93812. The inspection should emphasize fact-finding in its review of the circumstances surrounding the event. Safety or security concerns identified that are not directly related to the event should be reported to the Region II office for appropriate action.

Your team will report to the site, conduct an entrance, and begin inspection no later than October 13, 2009. In accordance with IP 93812, you should promptly recommend a change in inspection scope or escalation if information indicates that the assumptions utilized in the MD 8.3 risk analysis were not accurate. A report documenting the results of the inspection should be issued within 45 days of the completion of the inspection. A copy of the inspection report shall be forwarded to the Crystal River Unit 3 License Renewal Inspection Team. The report should address all applicable areas specified in section 3.02 of Inspection Procedure 93812. At the completion of the inspection, you should provide recommendations for improving the Reactor Oversight Process baseline

L. Lake 3 inspection procedures and the Special Inspection process based on any lessons learned.

This charter may be modified should you develop significant new information that warrants review. Should you have any question concerning this charter, contact Mark Franke at (404) 562-6349.

Docket No.: 50-302 License No.: DPR-72

References:

Inspection Procedure 93812, Special Inspection Management Directive 8.3, NRC Incident Investigation Program Inspection Manual Chapter 0609, Significance Determination Process Inspection Manual Chapter 0612, Power Reactor Inspection Reports cc: R. Borchardt, EDO B. Mallett, DEDR L. Reyes, RII V. McCree, RII J. Munday, RII M. Sykes, RII L. Wert, RII T. Boyce, NRR F. Saba, NRR K. Kennedy, RII H. Christensen, RII S. Ninh, RI1 C. Fletcher, RII MFranke, RII M. Khanna, NRR