ML111990571

From kanterella
Revision as of 18:20, 12 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Initial Exam 2011-301 General Correspondence
ML111990571
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/02/2011
From: Ohmstede G
Southern Co, Southern Nuclear Operating Co
To: Aiello R
NRC/RGN-II/DRS/OLB
References
50-348/11-301, 50-364/11-301, FNP-2010-0092-TRN
Download: ML111990571 (10)


Text

Southern Nuclear Operating Company, Inc.

FNP-201 0-0092-TRN Ashford, Alabama 36312 Tel 334.8995156 Fax 334.814.4661 October 18, 2010 SOUTHERNi Mr. Ron Alello COMPANY U.S. Nuclear Regulatory Commission, Region II Ene;gytoSeveYoi;Wor1d 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257

Dear Mr. Aiello:

You will find enclosed the exam material as required by NUREG 1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, supplement 1. All exam materials MUST be withheld from public disclosure until after the examinations are complete.

Enclosed you will find the printed paperwork listed below for the upcoming examination scheduled for the week of May 9, 2011 at Farley Nuclear Plant.

  • ES-301-1, Administrative Topics Outline (1 page)
  • ES-301 -1, Administrative Topics Outline from the past 2 NRC exams (3 pages)
  • ES-301-2, Control Room/In-Plant Systems Outline (3 pages)
  • ES-301 -2, SPARE JPMs for Control Room/In-Plant Systems Outline (1 page)
  • ES-301-2, from the past 2 NRC exams (5 pages)
  • ES-D-1, Scenario I Outline (6 pages)
  • ES-D-1, Scenario 2 Outline (6 pages)
  • ES-D-1, Scenario 3 Outline (6 pages)
  • ES-D-1, Scenario 4 Outline (6 pages)
  • ES-D-1, Scenario 5 Outline (6 pages)
  • ES-D-1, Scenario 6 Outline (6 pages)
  • ES-D-1, Scenario 7 Outline (6 pages)
  • A scenario document that lists all failures and procedures in a table format (1 page)

You will also find 2 cds:

  • One Reference Disk that has all the procedures for Farley in an easy to use format.
  • One cd that has the above forms in word documents and pdf formats for your use and one file in LxR that contains 10 questions for your reveiw.

If you have any questions, please contact Gary Ohmstede at (334) 899-5156, extension 6111 or Howard Fitzwater or Billy Thornton at (334) 814-4758.

Sir 3aOfi4istede Lead lnstrudor Exam Development

Enclosure:

GTO cc: File

Southern Nuclear Operating Company, Inc.

Post Office Drawer 470 FNP2O1 00093TRN Ashford, Alabama 36312 Tel 334.899.5156 Fax 334.814.4661 SOUTHERN COMPANY Energy to Serve Your Worlds October 21, 2010 Mr. Ron Aiello U.S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257

Dear Mr. Aiello:

You will find enclosed the exam material as required by NUREG 1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, supplement 1. All exam materials MUST be withheld from public disclosure until after the examinations are complete.

Enclosed you will find the printed paperwork listed below for the upcoming examination scheduled for the week of May 9, 2011 at Farley Nuclear Plant.

. ES-201-2, Examination Outline Quality Checklist (1 page)

If you have any questions, please contact Gary Ohmstede at (334) 899-5156, extension 6111 or Howard Fitzwater or Billy Thornton at (334) 814-4758.

Sincerely,

/ Gar mstede Lead lnstructhr Exam Development

Enclosure:

GTO cc: File

Southern Nuclear Operating Company, Inc.

FNP-201 1-0014-TRN Ashford, Alabama 36312 Tel 334.8995156 Fax 334.814.4661 February 21, 2011 SOUTHERNZ COMPANY Energy to Serve Your Wa rid Mr. Ron Aiello U.S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257

Dear Mr. Aiello:

You will find enclosed the exam material as required by NUREG 1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, supplement 1. All exam materials MUST be withheld from public disclosure until after the examinations are complete.

Enclosed you will find the printed paperwork listed below for the upcoming examination scheduled for the week of May 9, 2011 at Farley Nuclear Plant.

  • ES-201-2, Examination Outline Quality Checklist (1 page)
  • ES-201-3, Exam Security Agreement (2 pages)
  • ES-301-1, Administrative Topics Outline (1 page)
  • ES-30l-2, Control Room/In-Plant Systems Outline (2 pages)
  • ES-301-3, Operating Test Quality Checklist (1 page)
  • ES-301-4, Simulator Scenario Quality Checklist (2 pages)
  • ES-301-6, Competencies Checklist (2 pages)
  • ES-401-4, Record of Rejected K/As (3 pages)
  • ES-401-6, Written Exam Quality Checklist (1 page)
  • Four (4) separate bindings each containing the Written Exam. Each binding contains:

o Twenty-five (25) written exam questions with supporting documentation.

o LXR statistical analysis report of the validation performance to date.

  • One (1) binding containing the Administrative Topics portion to include the following:

o ES-301-1, Administrative Topics Outline w/ explanation and changes marked in blue (2 pages) o Seven (7) Admin JPMs with supporting documents.

(Continued)

(Continued)

  • One (1) binding containing the Control Room/In-Plant Systems portion of the exam to include the following:

o ES-301-2, Control Room/In-Plant Systems Outline w/ explanation and changes marked in blue (5 pages) o Eleven (11) Control Room/In-Plant JPMs o AN ADDITIONAL ES-301 -2, Control Room/In-Plant Systems Outline w/

explanation for 3 spare JPMs o AN ADDITIONAL ES-301 -2, Control RoomJIn-Plant Systems Outline o AN ADDITIONAL 3 Control Room/In-Plant JPMs with supporting documents to function as spare JPMs if necessary.

  • The Simulator Exam Scenario outlines for Seven (7) Simulator exams, in which each include:

o The original submittal ES-D-1 form with changes in blue, as required o The current ES-D-l o Scenario Outlines and Booth Operator Guide o ES-D-2, Required Operator Actions o The crew briefing sheet and Turnover sheet

  • Two templates that describe the simulator events for the submitted NRC exam and a synopsis of the AUDIT exam JPMs, admin and simulator exams scheduled for this class.

In addition to the above printed material, there is one USB 2.0 flash drive provided that includes an electronic version of the above listed materials as well as a copy of FNPs Training Reference Disk, which contains all lesson plans and required references to review the exam. All of this is provided to ensure complete and proper documentation for the upcoming examination.

If you have any questions, please contact Gary Ohmstede at (cell -334-797-2599), or Howard Fitzwater (334) 899-5156, extension 6143 or call the exam room at 334-814-4758.

Sincerely, Gry Ohmstede Lead Ins&uctor- Exam Development

Enclosure:

GTO cc: File

Southern Nuclear Operating Company, Inc.

Post Office Drawn 470 Ashford, Alabama 36312 SOUTHERN COMPANY Energy to Serve Your World April 4, 2011 FNP-20 11-0041 -TRN Mr. Luis Reyes Regional Administrator, Region II U.S. Nuclear Regulatory Commission 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Attention: Mr. Malcolm Widrnann Dear Mr. Widmann Enclosed for your review are the preliminary uncertified license applications and medical certifications for the license candidates currently enrolled in the Operator License Training program at J.M. Farley Nuclear Plant.

Should you have any questions regarding these applications or medical certifications, please contact Mr.

Brian Reed, Operations Lead Instructor, at 334-814-4981.

Sincerely, D.D.

Training Supervisor- Farley DDHJBWR

Southern Nuclear Operating Company, Inc.

Post Office Drawer 470 FNP2O1 10048TRN Ashford, Alabama 36312 Tel 334899.5156 Fax 334.814,4661 April 13, 2011 SOUTHERN COMPANY Mr. Ron AielIo Energy to Serve Your Wor U.S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257

Dear Mr. Aiello:

You will find enclosed the exam material as required by NUREG 1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, supplement 1. All exam materials MUST be withheld from public disclosure until after the examinations are complete.

Enclosed you will find the printed paperwork listed below for the upcoming examination scheduled for the week of May 9, 2011 at Farley Nuclear Plant.

  • ES-401-4, Record of Rejected K/As (3 pages).
  • ES-401-6, Written Exam Quality Checklist (1 page).
  • Two (2) SCANTRON answer sheets filled out as discussed.
  • One (1) 75 question RO written exam with a cover sheet.
  • One (1) 100 question SRO written exam with a cover sheet.
  • One (1) binder containing a working copy of the Written Exam consisting of 298 pages with separating numbered tabs and an answer key consisting of three (3) pages.

In addition to the above printed material, there is one CD-R disk provided that includes an electronic version of the above listed materials as well as a copy of FNP s Training Reference Disk, which contains all lesson plans and required references to review the exam. Also included on the CD-R disk is the LXR files from which the printed documents were created. All of this is provided to ensure complete and proper documentation for the upcoming examination.

If you have any questions, please contact Gary Ohmstede at (cell -334-797-2599), or Howard Fitzwater (334) 899-5156, extension 6143 or call the exam room at 334-814-4758.

Lead Instructor- Exam Development

Enclosure:

GTO cc: File

Southern Nuclear Operating Company. Inc.

Post Office Orawer 470 FNP2O1 1-0054 -TRN Ashford, Alabama 36312 Tel 334.899.5156 Fax 334.814,4661 April 28, 2011 SOUTHERN COMPANY Energy to Serve Your Wor1d Mr. Ron Aiello U.S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257

Dear Mr. Aiello:

You will find enclosed the exam material as required by NUREG 1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, supplement 1. All exam materials MUST be withheld from public disclosure until after the examinations are complete.

Enclosed you will find the printed paperwork listed below for the upcoming examination scheduled for the week of May 9. 2011 at Farley Nuclear Plant.

  • ES-201-2, Examination Outline Quality Checklist (1 page)
  • One copy of ES-201-3, Exam Security Agreement (2 pages)
  • ES-301-l, Administrative Topics Outline (1 page)
  • Seven (7) Administrative Exams.
  • ES-3D 1-2, Control Room/In-Plant Systems Outline (2 pages)
  • Twelve (12) Control Room/In-Plant JPMs
  • ES-301 -3, Operating Test Quality Checklist (1 page)
  • ES-301-4, Simulator Scenario Quality Checklist (2 pages)
  • ES-301-6. Competencies Checklist (2 pages)
  • The Simulator Exam Scenario outlines for Six (6) Simulator exams, in which each include:

o The current ES-D-1 o Scenario Outlines and Booth Operator Guide o ES-D-2, Required Operator Actions o The crew briefing sheet and Turnover sheet In addition to the above printed material, there is one 700 MB CD-R provided that includes an electronic version of the above listed materials. All of this is provided to ensure complete and proper documentation for the upcoming examination.

If you have any questions, please contact Gary Ohmstede or Howard Fitzwater at 334-814-4758.

Sincerely, Ohmstede Lead Instr ctor- Exam Development

Enclosure:

GTO cc: File

Southern Nuclear Operating Company. Inc.

Post Office Drawer 470 Ashford, Alabama 36312 Tel 334.899.5156 Fax 334.814.4661 SOUTH ERN COMPANY Energy to Serve Your World FNP-201 1 -0057-TRN June 1,2011 Mr. Ron AieIlo U.S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257

Dear Mr. Aiello:

Enclosed you will find the printed paperwork required upon completing the site administered Initial Written Examination by NUREG 1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, supplement 1.

Please NOTE that question #98 should be treated as classified, proprietary, and sensitive or otherwise protected information and should be withheld from public disclosure.

The Form ES-201 -3, Examination Security Agreement, has been completed; two individuals were not capable of physically signing the ES-201 -3 Form, however a telephone interview was conducted where both individuals attested that the conditions of the agreement were intact.

Finally, a third individual could not sign the original ES-201 -3 Form but instead signed a facsimile and his signature is captured on a separate ES-201-3 Form. Post examination comments for potential key changes are also included.

Enclosed are the following:

  • ES-201-3, Examination Security Agreement.
  • Sixteen (16) original exam answer sheets: 10 SRO & 6 RO for electronic scanning in LXR software (SCANTRON sheets) and copies of the same.
  • Sixteen (16) original signed exam cover sheets: 10 SRO & 6 RO and copies of the same.
  • A copy of each applicants LXR generated profile report attached to his answer sheet.
  • Preliminary grades (RO, SRO-only, SRO-OVERALL scores).
  • Statistics on each question for each of portion of the RO and SRO exams.
  • Exams as administered (one 75 question RO exam and one 100 question SRO exam).
  • Seating chart utilized during the written exam.
  • Exam key for both RO/SRO exams.
  • NMP-TR-423-F1 5 which list the questions asked by the applicants during the exam with the responses given.
  • A SCANTRON form Marked as KEY; LXR generated exam key and an LXR TEST KEY report.
  • Compilation of Comments collected from the applicants from the post-exam review with facility response/action stated. This document also identifies the facility reviewed HIGH Miss questions.
  • Re-Grade proposal for SRO-ONLY question #77.

Southern Nuclear Operating Company, Inc.

Post Office Drawer 470 Ashford, Alabama 36312 Tel 334.899.5156 Fax 334.814.4661 SOUTHERNA COMPANY Energy to Serve Your Worlds FNP-201 1 -0058-TRN June 6, 2011 Mr. Ron AieIlo U.S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257

Dear Mr. Aiello:

Enclosed you will find the resubmitted ES-401-8 forms you requested.

Enclosed are the following:

Ten (10) original signed SRO exam cover sheets.

If you have any questions, please contact Gary Ohmstede at (334) 899-5156, extension 6111 or Howard Fitzwater at (334) 814-4758.

Sincerely, Gary jmstede Nuclear Ops Plant Instructor, Lead Exam Development Enclosure cc: File, GTQ JUN 7 2011

If you have any questions, please contact Gary Ohmstede at (334) 899-5156, extension 6111 or Howard Fitzwater at (334) 814-4758.

Sincerely,

(.M. Stinson Site Vice President Enclosure cc: File, GTO