Comment (22) of Theodora Tsongas Re Columbia Generating Station; Notice of Availability of Draft Supplement 47 to the Generic Environmental Impact Statement for License Renewal
ML11280A200
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/29/2011
From: Tsongas T
- No Known Affiliation
To: Dan Doyle
Rulemaking, Directives, and Editing Branch
References
76FR54502 00022
Download: ML11280A200 (1)


Text

,Z&z~X 4§:2~~~

Hello Mr. Doyle, Unfortunately, your facilitator assumed that since I had asked a question, I had already commented, so I was eliminated from the list of telephone commenters. After that, the phone line was open so I could hear you, but you could not hear people on the phone lines. And it was downhill all the way. This is a poor way to run a public meeting. If you cannot even manage technology to get a phone connection, then the NRC will have to just spend the time and money to have public meetings in several locations in the Columbia Generating Station's area, including downstream locations, Portland OR and Vancouver WA. I waited through 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> of bad connections with echoing feedback, to finally be cut out arbitrarily and then technologically. It appears that the NRC does not really want to have to deal with our comments or input into this process. Is that correct?

I am a very concerned member of the public.

- i~I Theodora Tsongas, PhD, MS F71 Portland Oregon Th D CDl 6z) ~e~