ML11280A200
"Draft Supplement" is not in the list (Request, Draft Request, Supplement, Acceptance Review, Meeting, Withholding Request, Withholding Request Acceptance, RAI, Draft RAI, Draft Response to RAI, ...) of allowed values for the "Project stage" property.
| ML11280A200 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 09/29/2011 |
| From: | Tsongas T - No Known Affiliation |
| To: | Dan Doyle Rulemaking, Directives, and Editing Branch |
| References | |
| 76FR54502 00022 | |
| Download: ML11280A200 (1) | |
Text
,Z&z~X 4§:2~~~
Hello Mr. Doyle, Unfortunately, your facilitator assumed that since I had asked a question, I had already commented, so I was eliminated from the list of telephone commenters. After that, the phone line was open so I could hear you, but you could not hear people on the phone lines. And it was downhill all the way. This is a poor way to run a public meeting. If you cannot even manage technology to get a phone connection, then the NRC will have to just spend the time and money to have public meetings in several locations in the Columbia Generating Station's area, including downstream locations, Portland OR and Vancouver WA. I waited through 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> of bad connections with echoing feedback, to finally be cut out arbitrarily and then technologically. It appears that the NRC does not really want to have to deal with our comments or input into this process. Is that correct?
I am a very concerned member of the public.
Theodora Tsongas, PhD, MS
- i~I Th D
F71 CDl Portland Oregon 6z)
~e~