Slides on Oconee Ssf Flood Barrier Breach SDP Lessons Learned
ML14058A077
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/04/2014
From: Jeff Circle, Vail J
NRC/NRR/DRA/APOB
To:
Shared Package
ML14055A421 List: ... further results
References
FOIA/PA-2012-0325
Download: ML14058A077 (21)


Text

Oconee SSF Flood Barrier Breach SDP - Lessons Learned Jeff Circle, DRA/APOB.

James Vail, DRAAPOB.

NHR Ue0 -Sen 'ive

/Inte oHfo t'njji 0 USS.NRC IflNTESTATES REGIIATORY NUTCLEAR COMMAESO ProtectinSPeople and the Environment

Purpose

  • To inform DRA personnel of the lessons learned from the disposition of the Oconee Standby Shutdown Facility (SSF) wall SDP finding.

, To help encourage and foster a questioning attitude by staff on regulatory and enforcement processes.

NR &ernetZmats !nU.SNRC0 5TT.F. L.B MU.iED I.IUULTOYWCM1MM*SIO NO'!!.s

  • ProtewngPeople and the Environment

Discussion Topics

  1. Background of finding.

e Technical lessons learned.

s Process lessons learned.

s Actions taken.

e Considered future actions.

NRR Use lySeiv Into Infma! ni 0 i2US.NRC LiNfED NUGLEA STATES REDGLU.MRYCOMMISSION People ad Ohe

%.Protecting Environment

Importance of the SSF at Oconee

  1. The SSF contains the only means to shut all three units down following a station blackout induced by catastrophic flood, fire, or other external events.

@The Oconee site does not have emergency diesel generators.

- On-site emergency ac power isprovided by two hydro-electric generators at the Keowee dam.

s Catastrophic flooding to the site can render all the switchyards and Keowee dam unavailable thus blacking out all three units.

- Under these conditions, the additional failure of the SSF function results incore damage.

NRR cials Myqnsi We 0 U@S1NRC SATESnVCLEAR UNIMTED REGLLUMRYOMMSSION Protecting People and the Environment

Aerial View Showing The Relationship of the Oconee Site Environment and Lake Keowee

..... .*.."._:",

  • ...-'..............

N R R Use n .SeItive In Infort!-r. n 0 IJOS Nn TAE U

S NRC LCL.LU REGIRl.KERYCOMSO Protecting People and the Environment

Aerial View of the Oconee Site cial Us ly -Se itive A ter IInf (~ma!'tn'v 0 USONRC IMNTED STATESNUCtEBR EGULqATRY 4

COMMISSION ProtectingPeople and the Environment

The Flood Barrier Finding V,.Licensee opened an access cover uncovering a previously cut hole in the wall on August 13, 2003.

- Should have done a 10CFR50.65

, (a)(4) assessment immediately.

- Should have done a 10CFR50.59

.* evaluation after 90 days.

  • Licensee opportunities to identify 7I* .issue

- June 2,2005 NRC inspectors notified the licensee of condition.

Licensee issued PIP (condition report intheir corrective action

  • system). Corrective action not

, taken.

-,August 3,2005 NRC inspectors questioned lack of corrective action Five.foot flood wall and licensee issued a further PIP.

protecting the doorway.

  • Opening sealed on August 3,2005.

Opening inoutside wall with access plate on inside of SSF building.

NR R OfiiUse nly Sen tive nte Ifrmin' fl -U.S.NRC UNMlf5TATEShI.CILAR COMM.ISSION REGURflORY 49I4i i FW ii Protecting Peoplfeand the Enviroment

Interior and Exterior Walls of SSF NRR Q US.NRC lNMTDlSTATES REGIJUMT

?I1CLEAR ~COMM5SON Protecting People and the Environment

The Flood Scenario Ruptiire of Jocassee Dam Lake Jocassee

-300-f BoOa-Wes Creek .

Nine Times i.f _ .,

  • . . #'

cpA3

.a" ., .

  • .oSIx Oconee Site OMiUse fly -ensi lye

-InternaillInformatibl 0 US.NRC I#PTED S a1 dcthqEnmiRYOMMeN ReApeS ProtectingPeople and the Environment

Aerial View of Jocassee Dam- Upstream of the Oconee Site NRR Oiala Us Only sitie Innterna nno mato 0 ,U.SNRCSTATES UNrtED) MICITARISGU1ATORY 0MMOSMSoN Protectin~gPeople anid the Enzironment

SSF Catastrophic Flood Heights Given Rupture of Jocassee Dam Licensee study in1980s established a resultant flood height of approximately 5feet.

- Justification for erection of the 5-ft wall around the doorway.

- Study isunavailable.

- Flood height almost matches that of overtopping of Keowee dam.

  • Licensee commissioned additional study by FERC in 1992.

- Established a higher resultant flood height range of 12-16 feet.

- Licensee still used the 5-ft height for their IPEEE submittal developing a 20% split fraction apportioning the Jocassee Dam rupture frequencies to account for these higher FERC flood heights.

fici Us nly SensiUvRC

. . Cl inenlfo iv W OW §i ýProtecitng

-)U.SNRC People a,dthe Environment

Background Summary

, August 17, 2006- SERP meeting assessed as preliminary WHITE based on a blended qualitative and quantitative risk-informed approach (pre-IMC 0609 App M).

  • August 31, 2006 -Choice letter sent to licensee.

, October 5,2006 - Licensee provided written response to choice letter and waived regulatory conference.

, Nov. 22, 2006 -Final significance determination issued. WHITE based on qualitative erosion of defense-in-depth, but includes quantitative CDF based on apportioning flood frequency to flood height.

  • December 20, 2006 -Licensee appeals the final significance determination.

Requests NRC to accept incomplete, un-docketed new information on Jocassee dam seismic failure.

. Appeal panel convened on January 9,2007.

  • Licensee contractor seismic fragility analysis of Jocassee issued January 29, 2007.

. March 1,2007 - Appeal panel upholds WHITE finding.

. May 3,2007 - Licensee requests reassessment of final significance determination.

. June, 2007 - Assembled a team to review new information. Flooding expert review of data on random dam failure.

  • June 28, 2007 -Follow up telecom with Licensee on dam failure questions and comments.
  • July 17, 2007 -Licensee response to analysis questions by email.

. September 5,2007 - Final SERP split vote forces upper management resolution.

  • November 20, 2007 -Final determination letter released to licensee.

NOffi al"Only se siN e Protediang People and ke Environment

Jocassee Dam Random Failure Frequency Licensee developed random dam failure frequency for IPEEE submittal based on rockfill dam failures per population of earthen, rockfill, and composite dams.

- Severely underestimated frequency by an order of magnitude at 1.4E-5 per year.

s As part of the second appeal, DRA/APOB investigated the derivation of this frequency.

(b)(7)(F)

NRR U.S.NRC LFNTTEDSTATES5 MIiLLARREGt'UTORTCOMMISSION Protectinig People and the Environment

Dam and Dike Failure

  1. Dam failure iswell documented and can be characterized by type of dam.
  1. Of the 79,777 dams inthe US, 72% are embankment type and 28

%are concrete.

  1. Nineteenth century dams would fail at 5%inthe first five years after construction but would settle out to a 1to 4%additional failure by 20 years of life.

s This failure rate was reduced to 2%inthe first 5years for dams built after 1930.

a By 1960, dam failure rates were less than 0.01 %due to better engineering.

@Whatever the era, half of all dams that ever fail, do so inthe first five years. This high infant mortality isoften due to piping inthe soil around the dam or underneath it.Even concrete dams are not immune. However, dam construction dropped dramatically after 1980 so that nearly all dams are older than 5years.

rma n U.S.NRC lnalnf N R R - 0Nmo STATESNIRUAR REGLIATORC ProtectingPeople and the Environment

Technical Lessons Learned Investigation of Dam Failure Frequencies http://crunch.tec~army.mil/nid/webpaqes/nid.cfm http://npdp.stanfordedu/index.html Failures Dam.years Mean All Arch Dams 2 9101 2.1E-04 All Buttress Dams 2 9819 1.9E-04 All Concrete Dams 10 110227 9.3E-05 All Earth Dams 366 2240403 1.6E-04 All Gravity Dams 28 122798 2.3E-04 All Masonry Dams 5 21692 2.2E-04 All Multi-Arch Dams 0 240 1.5E-04 All Rockfill Dams 7 55872 1.3E-04 All Stone Dams 2 11365 1.7E-04 All Timber Crib Dams 3 6536 3.6E-04 Total 425 2605987 1.6E-04 Failures Dam-years Mean Buttress Dams Over 50 Feet 0 1876 2,OE-04 Arch Dams Over 50 Feet 2 5667 2.8E-04 Concrete Dams Over 50 Feet 0 19215 8.2E-05 Earth Dams Over 50 Feet 56 144810 3.8E-04 Gravity Dams Over 50 Feet 7 19542 3.2E-04 Masonry Dams Over 50 Feet 0 1987 2.OE-04 Multi-Arch Dams Over 50 Feet 0 77 2.4E-04 Rockfill Dams Over 50 feet 4 19900 2.1E-04 Total 69 213184 2.4E-04 NRR Lhi 'alUseO90 - ensit' eN U.S.NRC IWO STDIAIESNIT1AIXRiWAUTRYCOMIWSSION ProtectiNg People 4111theEnvironment

Licensee Evaluations s Only two IPEEEs addressed dam failure floods quantitatively - Ft Calhoun and Diablo Canyon. Everyone else only addressed probable maximum precipitation and screened out dam failure as low probability.

s Unfortunately, there were few dam failure data sources around back then, so many plants used the estimate published in NUREG/CR-5042. The data source for the estimate in NUREG/CR-5042 was the Oconee PRA -NSAC/60. The estimate of 2.5E-05/dam-year inNSAC/60 was done inerror by an order of magnitude and itpropagated throughout the industry.

e

References:

- NUREG/CR-5042, "Evaluation of External Hazards to Nuclear Power Plants inthe United States.

- NSAC/60, "Oconee PRA" Nall Uely-e e US.,NRC SI a**In rmat" n

~ inau~gjp~iProtecting 0 People anid theEnvironment

SPAR Considerations for External Flood Dams as far up or downstream as 300 miles should be considered for both flood and loss of heat sink. Itisnoteworthy that all forms of dams have a failure rate between 1E-4 and 4E-4, even for blue sky events.

Determining flood levels, however, isa complex matter. The USACOE has software named HEC RAS that when combined with GIS geographical data will model river flow and flooding ingreat detail.

Weather based floods remain inthe deterministic world because the input conditions are always from the same source as was used inthe original plant design basis. Besides, the growth of the maximum precipitation only increases about 20% when a 100 year interval iscompared to a 1000 year interval. With only 100 years of data available inmany locations, projecting beyond a I E-3/yr event isvery uncertain anyway.

NR R HIC-8 liýProteding~People nlfom o 0n IN S1TAtSNUIA RE.TR£OMS and th'e nviunmati

Process Lessons Learned

@Process did not account for situations where licensee did not communicate to the regional office and waived participation ina regulatory conference.

s Process did not accept new information prior to final determination.

s Without a regulatory conference, communication was impacted to program office and regional management of potential greater-than-green SDP findings.

sly Sensi USNRC,e l ,.. UNITED ItEGiATORnCOMMISSION i~m. b *t'*- ii~',i* ilJ*Protectig STATES NUCL[AR People ,,nd the Envir.onment

Actions Taken IIMC0609 indraft revision to account for:

- Licensees may present new information provided that they informed the agency either during a regulatory conference or inwriting before the final significance determination ismade.

- New information has to be submitted within the 30-day appeal period.

- Using best available information to determine final significance inatimely manner.

- NRR concurrence with regional management on accepting an appeal.

Ral Use I -Sensi imrtm .N RCU Intrc atioand PR 7 Pnfor T Eni hRRnCMISN

Actions Taken (cont'd) eTraining conducted to regional Senior Reactor Analysts (SRAs) inrecent counterparts meeting.

@Met with NSIR to inform DHS on potential dam and other outside infrastructure vulnerability.

NRR fi~Use 0 y- e~ns' ive

,U.S NRC INrwrTITOSAE 1:C1FARREGIRAToRY COMMI1SSION Protecting People and the Environment

Considered Future Actions

@NRR Program Office Director and/or Deputy Director should be informed of all greater-than-green findings.

  1. Exploration of licensing and potential backfit requirement for protection against most likely flood.

s Generic communication to licensees on flooding.

NRR I 0 U.S,NRC