IR 05000400/2013407

From kanterella
Revision as of 08:46, 4 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
IR 05000400-13-407, 12/31/2013, Harris Nuclear Power Plant NRC Material Control and Accounting - Cover Letter
ML14035A510
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/04/2014
From: Hopper G
NRC/RGN-II/DRP/RPB4
To: Kapopoulos E
Duke Energy Progress
References
IR-13-407
Download: ML14035A510 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 4, 2014 Mr. Ernie Kapopoulos, Vice President Duke Energy Progress, Inc.

Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165 SUBJECT: SHEARON HARRIS NUCLER POWER PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000400/2013407 On December 31, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a material control and accounting inspection at your Shearon Harris Nuclear Plant. The enclosed inspection report documents the inspection results, which were discussed on January 30, 2014, with you and other members of your staff.

This inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAM E. Kapopoulos 2 If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)

and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your respons

Sincerely,

/RA/

George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-400 License No.: NPF-63 Nonpublic Enclosure: NRC Material Control and Accounting Inspection Report 05000400/2013407 w/Attachment: Supplemental Information cc w/o enclosure distribution via ListServ _________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE Via email DXJ /RA/ GTH /RA/

NAME PLessard DJackson GHopper DATE 02/04/2014 02/03/2014 02/04/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO E. Kapopoulos 3 Letter to Ernie Kapopoulos from George T. Hopper dated February 4, 2014 SUBJECT: SHEARON HARRIS NUCLER POWER PLANT - NRC MATERIAL CONTROL AND ACCOUNTING Distribution:

RidsNrrPMShearonHarris Resource C. Evans, RII L. Douglas, RII B. Westreich, NSIR E. McNiel, NSIR RIDSNRRDIRS OE Mail PUBLIC