MONTHYEARML14071A1672014-01-28028 January 2014 Enclosure 2: Presentation Slides - North Anna ISFSI TN-32 Cask and Pad 1 Assessments Following August 23, 2011, Central Virginia Earthquake Project stage: Other 2014-01-28
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24029A2362024-01-30030 January 2024 Preliminary Results of the Environmental Review, Subsequent License Renewal ML23338A1522023-12-0707 December 2023 Public Meeting Slides for North Anna and Surry Emergency Plan Augmentation Times License Amendment Request ML23255A0992023-09-15015 September 2023 Slides for September 15, 2023 Public Meeting on Poanhi Seismic Evaluations ML23103A3482023-04-14014 April 2023 Annual Assessment Meeting Presentation for North Anna and Surry ML21221A0332022-06-17017 June 2022 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides ML21174A3042021-06-23023 June 2021 SLRA RAI Response Public Meeting - 21-06-24 ML21221A1542021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Dominion Slides ML21145A2172021-05-13013 May 2021 Discussion on May 13, 2021 with Dominion on Select Staff RAIs on North Anna Subsequent License Renewal Application - Dominion Slides ML21132A2892021-05-13013 May 2021 SLRA RAI Response Public Meeting ML21034A5972021-02-10010 February 2021 External Presentation Am Atkinson_Nrc ISG-06 Meeting Dominion Digital IC Project 02102021 ML20288A3472020-10-14014 October 2020 (COVID-19) Emergency Preparedness Exemption Pre-Application Meeting ML20099F2992020-04-0909 April 2020 NRC Slides for North Anna pre-app April 9 ML20099F2412020-04-0909 April 2020 Co., NRC Safety Pre& 8208;Application Meeting North Anna Power Station (NAPS) ML20098B6022020-04-0707 April 2020 Annual Assessment Meeting Presentation ML19297D1872019-11-18018 November 2019 Pre-Application Meeting - Dominion Slides ML18320A2502018-11-20020 November 2018 50.90 License Amendment Request - Dominion Fleet EAL Scheme Changes, November 20, 2018 Public Meeting ML18141A3072018-05-21021 May 2018 18 - SLR Status ML17123A2092017-05-0303 May 2017 Summary of Meeting to Discuss Annual Assessment of the North Anna Power Station, Units 1 and 2 with the Public for the Period of January 1, 2016 Through December 31, 2016 ML16124A7582016-05-0303 May 2016 April 14, 2016, Summer of Public Meeting - North Anna, Units 1 and 2 ML16124A7632016-05-0303 May 2016 April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2 ML16104A3822016-04-26026 April 2016 New Fuel Storage Rack & SFP Criticality Analysis for April 26th 2016 Scheduled Category 1, Pre-Submittal Public Teleconference ML16104A3872016-04-13013 April 2016 Criticality Analysis Checklist for North Anna ML15273A4292015-09-29029 September 2015 Revised Slides for September 29, 2015 Meeting with Dominion Re North Anna ISFSI License Renewal ML15153A0452015-05-13013 May 2015 Revised North Anna ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15133A0822015-05-13013 May 2015 ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15128A5462015-05-0808 May 2015 Summary of Public Meeting with North Anna, Units 1 and 2 to Discuss the Annual Assessment with the Public ML14101A1202014-04-11011 April 2014 Public Meeting Summary - North Anna Power Station, Docket Nos. 50-338, 50-339 ML14058B1762014-03-0606 March 2014 Presentation Slides - North Anna ISFSI - High Burnup Dry Storage Confirmatory Data Project, TN-32 Storage Cask, Tom Brookmire, March 6, 2014, Docket No. 72-16, TAC No: L24886 ML14071A1672014-01-28028 January 2014 Enclosure 2: Presentation Slides - North Anna ISFSI TN-32 Cask and Pad 1 Assessments Following August 23, 2011, Central Virginia Earthquake ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML12257A2002012-09-11011 September 2012 2-North Anna Extent of Condition Presentation 9-7-12 Sept 10 ML12257A2342012-09-11011 September 2012 5-Hacker - North Anna Mockup and Search Unit Action Presentation Sept 10 ML12131A5052012-05-0909 May 2012 Presentation for 2011 North Anna EOC Annual Assessment Meeting ML11305A0452011-11-0101 November 2011 Region II - North Anna Public Meeting Slides ML11305A0622011-11-0101 November 2011 Restart Readiness, Public Meeting PR2 ML11276A0242011-10-0303 October 2011 Slides-North Anna AIT Public Meeting October 3, 2011 ML1127701352011-10-0303 October 2011 Ltr to D. Heacock Re Participation in the Commission Meeting on the North Anna Plant on 10/21/11 ML11252A0062011-09-0808 September 2011 Dominion'S Slides Earthquake Response and North Anna Restart Readiness Demonstration Plan ML1124205512011-08-30030 August 2011 Seismic Event ML1110304982011-04-13013 April 2011 Public Meeting Handouts ML1110304942011-04-13013 April 2011 Public Meeting Attendees ML1032204442010-11-18018 November 2010 Public Meeting Summary - North Anna Power Station ML1020100212010-07-14014 July 2010 Nucler Power Station, Units 1 and 2, Westinghouse RFA-2 Fuel Transition Licensing Meeting Presentation Slides ML1012600332010-05-0505 May 2010 Meeting Posters ML1012600342010-05-0505 May 2010 Public Mtg. Slides ML0917610472009-08-0505 August 2009 ECCS Preacs Filtration Presentation ML0911000392009-04-17017 April 2009 Notice of Public Meeting Category 1 - Annual Assessment of North Anna Power Station ML0820501832008-07-23023 July 2008 Meeting Announcement - Summary of Public Meeting Category 1 - Performance Discussion Meeting, North Anna Power Station ML0812008742008-03-24024 March 2008 Annual Assessment Meeting Reactor Oversight Program - Cy 2007 ML0730400332007-11-0101 November 2007 Public Meeting Slides for Meeting with Dominion Nuclear 2024-01-30
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24029A2362024-01-30030 January 2024 Preliminary Results of the Environmental Review, Subsequent License Renewal ML23338A1522023-12-0707 December 2023 Public Meeting Slides for North Anna and Surry Emergency Plan Augmentation Times License Amendment Request ML23255A0992023-09-15015 September 2023 Slides for September 15, 2023 Public Meeting on Poanhi Seismic Evaluations ML23103A3482023-04-14014 April 2023 Annual Assessment Meeting Presentation for North Anna and Surry ML21221A0332022-06-17017 June 2022 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides ML22091A0902022-04-0101 April 2022 Combined 2021 Assessment Meeting Slides ML21221A1542021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Dominion Slides ML21221A1482021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides ML21132A2892021-05-13013 May 2021 SLRA RAI Response Public Meeting ML21145A2172021-05-13013 May 2021 Discussion on May 13, 2021 with Dominion on Select Staff RAIs on North Anna Subsequent License Renewal Application - Dominion Slides ML21034A5972021-02-10010 February 2021 External Presentation Am Atkinson_Nrc ISG-06 Meeting Dominion Digital IC Project 02102021 ML20288A3472020-10-14014 October 2020 (COVID-19) Emergency Preparedness Exemption Pre-Application Meeting ML20099F2412020-04-0909 April 2020 Co., NRC Safety Pre& 8208;Application Meeting North Anna Power Station (NAPS) ML20099F2992020-04-0909 April 2020 NRC Slides for North Anna pre-app April 9 ML20098B6022020-04-0707 April 2020 Annual Assessment Meeting Presentation ML19297D1872019-11-18018 November 2019 Pre-Application Meeting - Dominion Slides ML18141A3072018-05-21021 May 2018 18 - SLR Status ML16124A7582016-05-0303 May 2016 April 14, 2016, Summer of Public Meeting - North Anna, Units 1 and 2 ML16124A7632016-05-0303 May 2016 April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2 ML15273A4292015-09-29029 September 2015 Revised Slides for September 29, 2015 Meeting with Dominion Re North Anna ISFSI License Renewal ML15133A0822015-05-13013 May 2015 ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15153A0452015-05-13013 May 2015 Revised North Anna ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15128A5462015-05-0808 May 2015 Summary of Public Meeting with North Anna, Units 1 and 2 to Discuss the Annual Assessment with the Public ML14058B1762014-03-0606 March 2014 Presentation Slides - North Anna ISFSI - High Burnup Dry Storage Confirmatory Data Project, TN-32 Storage Cask, Tom Brookmire, March 6, 2014, Docket No. 72-16, TAC No: L24886 ML14071A1672014-01-28028 January 2014 Enclosure 2: Presentation Slides - North Anna ISFSI TN-32 Cask and Pad 1 Assessments Following August 23, 2011, Central Virginia Earthquake ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML12257A2342012-09-11011 September 2012 5-Hacker - North Anna Mockup and Search Unit Action Presentation Sept 10 ML12257A2002012-09-11011 September 2012 2-North Anna Extent of Condition Presentation 9-7-12 Sept 10 ML12131A5052012-05-0909 May 2012 Presentation for 2011 North Anna EOC Annual Assessment Meeting ML11305A0452011-11-0101 November 2011 Region II - North Anna Public Meeting Slides ML11305A0622011-11-0101 November 2011 Restart Readiness, Public Meeting PR2 ML1128500392011-10-12012 October 2011 Summary of Augmented Inspection Team Public Exit Meeting with Virginia Electric Power Company to Discuss the Results of an ATI Inspection of an Earthquake Event on August 23, 2011 ML11276A0242011-10-0303 October 2011 Slides-North Anna AIT Public Meeting October 3, 2011 ML1127701352011-10-0303 October 2011 Ltr to D. Heacock Re Participation in the Commission Meeting on the North Anna Plant on 10/21/11 ML11252A0062011-09-0808 September 2011 Dominion'S Slides Earthquake Response and North Anna Restart Readiness Demonstration Plan ML12040A2742011-08-31031 August 2011 E-Mail from G. Wilson, NRR to D. Merzke, EDO; Subject: Seismic Instruments at North Anna ML12044A2792011-08-30030 August 2011 Email from M. Khanna, NRR to R. Auluck, NRR FW: North Anna Earthquake Issue Commissioner Briefing Final with Talking Points ML1124205512011-08-30030 August 2011 Seismic Event ML12044A2912011-08-30030 August 2011 E-mail from G. Bowman, EDO to T. Hipschman, Comm, Et Al; Subject: FYI-Revised Slides on North Anna/Gl-199 ML12044A2572011-08-26026 August 2011 Email from A. Istar, NRR to A. Hiser, NRR on North Anna Nuclear Power Plant. Pptx ML1110304822011-04-13013 April 2011 Public Annual Assessment Meeting/Open House Slides ML1032204442010-11-18018 November 2010 Public Meeting Summary - North Anna Power Station ML1021102592010-08-0404 August 2010 Enclosure 3: Dominion - North Anna Presentation of July 28, 2010 Public Meeting ML1020100212010-07-14014 July 2010 Nucler Power Station, Units 1 and 2, Westinghouse RFA-2 Fuel Transition Licensing Meeting Presentation Slides ML1012600342010-05-0505 May 2010 Public Mtg. Slides ML1012600332010-05-0505 May 2010 Meeting Posters ML0917610472009-08-0505 August 2009 ECCS Preacs Filtration Presentation ML0912104262009-05-12012 May 2009 7th International Conference on NDE - Presentation :a Destructive Validation of NDE Responses of Service-Induced PWSCC Found in North Anna 2 Control Rod Drive Nozzle 31 ML0820501832008-07-23023 July 2008 Meeting Announcement - Summary of Public Meeting Category 1 - Performance Discussion Meeting, North Anna Power Station ML0812008742008-03-24024 March 2008 Annual Assessment Meeting Reactor Oversight Program - Cy 2007 2024-01-30
[Table view] |
Text
North Anna ISFSI TN-32 Cask and Pad 1 Assessments following August 23, 2011 Central Virginia Earthquake Richard Ridder January 28, 2014
Agenda Purpose
Background
Observations at ISFSI Pad 1 Pad 1 Structural Analysis TN-32 Evaluations Structural Thermal Shielding Summary Cask Spacing TN32 Cask and Pad 1 Assessments following August 23, 2011 Central Virginia Earthquake 2
Purpose of Meeting Describe the results of the observations and evaluations of North Anna ISFSI Pad 1 and the TN-32 casks following 8/23/11 earthquake Discuss Dominions proposed resolution to the as-left TN-32 cask spacing compared with the Technical Specification Design Features Description TN32 Cask and Pad 1 Assessments following August 23, 2011 Central Virginia Earthquake 3
Background
August 23, 2011 Central Virginia Earthquake 5.8 magnitude Recorded Accelerations Exceeded Design Basis Earthquake (DBE)
Values Strong motion duration 3.1 seconds TN32 Cask and Pad 1 Assessments following August 23, 2011 Central Virginia Earthquake 4
TN32 Cask and Pad 1 Assessments following August 23, 2011 Central Virginia Earthquake 5 Observations at ISFSI Pad 1 Detailed Visual and Performance Inspections No damage or cracking to pad surface from earthquake No visible structural damage to TN-32 casks No damage to electrical conduit, only slight displacement No damage to pressure monitoring systems, including the remote monitoring panel TN32 Cask and Pad 1 Assessments following August 23, 2011 Central Virginia Earthquake 6
Additional Observations No cask monitoring system alarms during or following earthquake.
No loss of electrical power at the ISFSI No change to cask surface dose rates No abnormalities or drift in setpoints for six randomly selected pressure switches inspected on August 30, 2011. Interseal helium monitoring pressures were normal.
TN32 Cask and Pad 1 Assessments following August 23, 2011 Central Virginia Earthquake 7
TN-32 Cask Movement 25 of 27 casks showed indication of slight movement from pre-earthquake positions 41/2 inches maximum No obvious preferential direction N S 2 2.5 3 3.5 2.5 2.25 1.25 2.5 2.5 2 1 1 49 43 37 29 23 16 13 10 19 26 30 41 47 52 3.5 2
1.5 1 1.5 4.5 3 1.5 1.5 2.5 0.5 45 38 36 20 14 12 06 21 24 32 42 48 53 1 4 2 0.75 TN32 Cask and Pad 1 Assessments following August 23, 2011 Central Virginia Earthquake 8
Indications of Sliding TN32 Cask and Pad 1 Assessments following August 23, 2011 Central Virginia Earthquake 9
Spacing Measurements Center to center spacing varies from 15 feet 21/4 inches to 16 feet 111/4 inches 16 feet nominal spacing described in Tech Specs 163 161 16 162 152 164 158 165 161 1511 1511 163 162 1610 1611 1610 165 163 163 162 162 169 169 168 1610 1610 N S 49 43 37 29 23 16 13 10 19 26 30 41 47 52 45 38 36 20 14 12 06 21 24 32 42 48 53 1511 1510 163 163 1511 1510 162 162 16 162 158 164 TN32 Cask and Pad 1 Assessments following August 23, 2011 Central Virginia Earthquake 10
TN-32 Spacing The casks moved slightly, but showed no other indications of adverse effects, and no damage.
Dominion concludes that leaving the casks in their current positions makes sense Analyze Pad and revisit TN-32 analyses Address spacing description in Tech Specs TN32 Cask and Pad 1 Assessments following August 23, 2011 Central Virginia Earthquake 11
Pad 1 Structural Analysis Purpose Confirm visual inspection results which showed no damage, and confirm no damage in inaccessible areas Anticipate the condition of Pad 1 if another 8/23/11 earthquake occurs Enveloped Response Spectra Peak Spectral (@ Top of Pad #1 & C.G. of Casks)
Soil Structure Interaction Acceleration (SSI) Analysis: Frequency Acc.
Time Amplified TimeHistories Layers of Rock & Soil Acceleration Time Recorded TimeHistories TN32 Cask and Pad 1 Assessments following August 23, 2011 Central Virginia Earthquake 12
Pad 1 Structural Analysis Static Coefficient Analysis Using amplified response spectra from SSI, peak seismic accelerations were applied in a static coefficient analysis Casks assumed to remain pinned to pad Casks located at 14 ft center-to-center spacing Cask loads modeled as point loads to address any cask edge loading Pad analyzed in accordance with ACI 349-01 Seismic load demand approximately 75% of design code capacity using above conservatisms Sufficient margin in Pad 1 to withstand the moments and shear forces from the 8/23/11 earthquake and another 8/23/11 earthquake or a DBE as presently licensed TN32 Cask and Pad 1 Assessments following August 23, 2011 Central Virginia Earthquake 13
TN-32 Structural Evaluation Cask structural analysis used 1g lateral and 2g vertical accelerations Cask basket structurally evaluated for a 1g lateral acceleration and 3g vertical acceleration Cask and basket evaluated for 18 inch drop onto pad (50g acceleration downwards) and tipover (50g)
Peak enveloped seismic accelerations from SSI at cask center of gravity are bounded by these previously analyzed conditions Sliding Evaluation Minimum acceleration to slide:
0.284g horizontal, vertical 0.189g, coefficient of friction 0.35 Sliding would be expected for event of 8/23/11 magnitude TN32 Cask and Pad 1 Assessments following August 23, 2011 Central Virginia Earthquake 14
TN-32 Thermal Evaluation Current licensed thermal analysis Cask maximum heat load - 32.7 kW 16 feet minimum center-to-center spacing Previous licensed thermal analysis Cask maximum heat load - 27.1 kW 16 feet nominal center-to-center spacing All cask heat loads were less than 27.1 kW prior to 8/23/11 TN32 Cask and Pad 1 Assessments following August 23, 2011 Central Virginia Earthquake 15
TN-32 Thermal Evaluation Transnuclear performed sensitivity analysis for cask spacing 16, 15, and 14 feet center-to-center spacing Cask maximum heat load of 27.1 kW Vertical view factors calculated for each spacing Cask temperatures calculated for 27.1 kW heat load at 14 feet spacing are bounded by the current licensing basis Tmax, 16ft, 32.7 kW (°F) Margin to Component Tmax, 14ft, 27.1 kW (°F)
(licensing basis) licensing basis (°F)
Outer Surface 240 237.5 2.5 Radial Neutron Shield 280 257.6 22.4 (Resin/Aluminum)
Seal/Lid 256 237.1 18.9 Fuel Compartment 527 466.1 60.9 Fuel Cladding 565 501.4 63.6 TN32 Cask and Pad 1 Assessments following August 23, 2011 Central Virginia Earthquake 16
TN-32 Radiological Assessment No indications of damage to TN-32 casks No detection of local radiation leakage or streaming as confirmed by radiological surveys No change in surface dose rates as confirmed by radiological surveys Insignificant change in offsite dose rates due to cask movement The analysis assumes fully loaded pad, essentially transforming the pad into a line source for evaluation of offsite dose to public. Movement of the casks a few inches from their nominal locations would have an insignificant effect on offsite dose rates at the site boundaries TN32 Cask and Pad 1 Assessments following August 23, 2011 Central Virginia Earthquake 17
Summary No observed damage to TN-32 casks or Pad 1 Pad 1 - sufficient margin to withstand the 8/23/11 earthquake and another 8/23/11 earthquake or a DBE as presently licensed TN-32 structural evaluation - no damage predicted; accelerations due to earthquake bounded by existing analyses TN-32 shielding assessment - surface dose rates unchanged, offsite dose rate change insignificant TN-32 thermal analysis - temperature increases at 14 feet center-to-center spacing bounded by current licensing basis TN32 Cask and Pad 1 Assessments following August 23, 2011 Central Virginia Earthquake 18
Cask Spacing TS Design Features Description (4.2.3):
The SSSCs in each row will be spaced a nominal 16 feet apart center-to-center. Each row of SSSCs will be spaced a nominal 16 feet apart center-to-center. For SSSCs whose heat load exceeds 27.1 KW the spacing shall be a minimum of 16 feet apart center-to-center.
Spacing currently varies from 15 21/4 to 16 111/4 Propose formal clarification on the Docket of nominal spacing TN32 Cask and Pad 1 Assessments following August 23, 2011 Central Virginia Earthquake 19