Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARML16039A3382016-02-18018 February 2016 Request for Withholding Information from Public Disclosure for Byron Station, Unit Nos. 1 and 2, and Braidwood Station, Units 1 and 2 Project stage: Withholding Request Acceptance 2016-02-18
[Table View] |
Request for Withholding Information from Public Disclosure for Byron Station, Unit Nos. 1 and 2, and Braidwood Station, Units 1 and 2 (TAC Nos. MF6715, MF6716, MF1617, MF6718)ML16039A338 |
Person / Time |
---|
Site: |
Byron, Braidwood |
---|
Issue date: |
02/18/2016 |
---|
From: |
Joel Wiebe Plant Licensing Branch III |
---|
To: |
Bryan Hanson Exelon Generation Co |
---|
Joel S. Wiebe, NRR/DORL |
References |
---|
TAC MF6715, TAC MF6716, TAC MF6717, TAC MF6718 |
Download: ML16039A338 (4) |
|
|
---|
Category:Letter
MONTHYEARML24263A1272024-09-23023 September 2024 – Request for Additional Information (EPID 2023-LLA-0136) - Non-Proprietary BYRON 2024-0046, Cycle 27 Core Operating Limits Report2024-09-19019 September 2024 Cycle 27 Core Operating Limits Report RS-24-088, Relief Requests Associated with the Fifth Inservice Inspection Interval2024-09-13013 September 2024 Relief Requests Associated with the Fifth Inservice Inspection Interval IR 05000456/20240112024-09-12012 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000456/2024011 and 05000457/2024011 ML24164A0032024-09-10010 September 2024 Issuance of Amendment Nos. 235 and 235 Revision of Technical Specifications for the Ultimate Heat Sink ML24250A1182024-09-0606 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information 05000454/LER-2024-001, Both Trains of Control Room Ventilation Temperature Control System Inoperable2024-09-0505 September 2024 Both Trains of Control Room Ventilation Temperature Control System Inoperable ML24227A0522024-08-29029 August 2024 Audit Plan for LAR to Remove ATWS Mtc Limit IR 05000456/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2024005 and 05000457/2024005) IR 05000454/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Byron Station, Units 1 and 2 (Report 05000455/2024005 and 05000454/2024005) ML24225A1112024-08-13013 August 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000454/20240112024-08-0808 August 2024 Phase 2 Post- Approval License Renewal Report 05000454/2024011 IR 05000456/20240022024-08-0808 August 2024 Integrated Inspection Report 05000456/2024002 and 05000457/2024002 ML24172A1252024-07-26026 July 2024 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2024-LLA-0075) - Transmittal Letter IR 05000454/20240022024-07-26026 July 2024 Integrated Inspection Report 05000454/2024002 and 05000455/2024002, and Exercise of Enforcement Discretion ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) 05000456/LER-2024-001, Submittal of LER 2024-001-00 for Braidwood Station, Unit 1, Trip on Low Steam Generator Level Due to Failure to Verify Isolation Valves Were Open2024-07-0303 July 2024 Submittal of LER 2024-001-00 for Braidwood Station, Unit 1, Trip on Low Steam Generator Level Due to Failure to Verify Isolation Valves Were Open RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions RS-24-066, Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller2024-06-25025 June 2024 Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller ML24163A3922024-06-25025 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0075)- Letter ML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24164A2132024-06-13013 June 2024 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Braidwood Nuclear Plant RS-24-057, License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink2024-06-0404 June 2024 License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink IR 05000456/20240102024-05-31031 May 2024 License Renewal Phase 1 Report 05000456/2024010 RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report BYRON 2024-0031, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-05-16016 May 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation ML24136A0132024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report ML24136A2452024-05-15015 May 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000457/2024004 IR 05000454/20240012024-05-10010 May 2024 Integrated Inspection Report 05000454/2024001; 05000455/2024001 and 07200068/2024001 BYRON 2024-0028, Annual Radiological Environmental Operating Report (AREOR)2024-05-0909 May 2024 Annual Radiological Environmental Operating Report (AREOR) ML24128A1212024-05-0707 May 2024 Response to Braidwood and Dresden FOF Dates Change Request (2025) BYRON 2024-0022, 2023 Regulatory Commitment Change Summary Report2024-05-0202 May 2024 2023 Regulatory Commitment Change Summary Report ML24122A6522024-05-0101 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000456/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000456/2024301; 05000457/2024301 ML24116A0052024-04-25025 April 2024 Transmittal of Braidwood Station, Unit 1, Core Operating Limits Report, Braidwood Unit 1 Cycle 25 ML24116A1192024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) IR 05000456/20240012024-04-24024 April 2024 Integrated Inspection Report 05000456/2024001 and 05000457/2024001 ML24113A1272024-04-22022 April 2024 Audit Plan in Support of Review of LAR Revision of TS 3.7.15, 3.7.16, and 4.3.1 (EPID: L-2023-LLA-0136) (Non-Proprietary) ML24113A2892024-04-22022 April 2024 Notification of NRC Baseline Inspection and Request for Information IR 05000457/20240902024-04-19019 April 2024 Final Significance Determination for 2b Auxiliary Feedwater Pump Diesel Engine Fuel Oil Dilution Issue - NRC Inspection Report 05000457/2024090 BYRON 2024-0020, Annual Dose Report for 20232024-04-18018 April 2024 Annual Dose Report for 2023 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition 2024-09-06
[Table view] Category:Proprietary Information Review
MONTHYEARML21279A0062021-10-13013 October 2021 Request for Withholding Information from Public Disclosure ML21201A3852021-07-23023 July 2021 Request for Withholding Information Regarding Proposed Alternative to Use ASME Code Case N-893 (EPIDs L-2020-LLR-0147 and -0148) ML21084A1352021-04-0505 April 2021 Request for Withholding Information from Public Disclosure ML21028A7122021-02-0303 February 2021 Request for Withholding Information Regarding Proposed Alternative to Use ASME Code Case N-893 (Epids L-2020-LLR-0147 and -0148) ML20317A1342020-11-12012 November 2020 Request for Withholding Information from Public Disclosure; Guarantees of Payment of Deferred Premiums ML19336A0192019-12-0303 December 2019 Request for Withholding Information Regarding Guarantees of Payment of Deferred Premiums ML18225A2292018-08-16016 August 2018 Request for Withholding Information from Public Disclosure ML18019A0112018-01-29029 January 2018 Request for Withholding Information from Public Disclosure ML18012A0122018-01-17017 January 2018 Request for Withholding Information from Public Disclosure ML17320A1452017-11-20020 November 2017 Request for Withholding Information Regarding Guarantees of Payment of Deferred Premiums ML17201Q1302017-08-0707 August 2017 Request for Withholding Information from Public Disclosure for Braidwood Station, Unit 1, and Byron Station, Unit Nos. 1 and 2 ML17201Q1342017-08-0707 August 2017 Request for Withholding Information from Public Disclosure for Braidwood Station, Unit No. 1 ML17023A2312017-01-26026 January 2017 Request for Withholding Information from Public Disclosure for Byron Station, Unit No. 2 ML17013A6052017-01-19019 January 2017 Request for Withholding Information from Public Disclosure for Byron Station, Unit Nos. 1 and 2 ML16337A2762016-12-0909 December 2016 Calvert; Clinton; Dresden; LaSalle; Limerick; Nine Mile Point; Oyster Creek; Peach Bottom; Quad Cities; R.E. Ginna; Three Mile Island - Request for Withholding Information Regarding; Guarantees of Payment of Deferred Premiums ML16098A3222016-04-27027 April 2016 Request to Withhold Emergency Preparedness Documents from Public Disclosure (CAC Nos. MF7504-MF7525) ML16039A3382016-02-18018 February 2016 Request for Withholding Information from Public Disclosure for Byron Station, Unit Nos. 1 and 2, and Braidwood Station, Units 1 and 2 ML16007A1852016-01-21021 January 2016 Relief from the Requirements of the ASME Code(Cac Nos. MF4809, MF4810, MF4811, and MF4812) ML15007A5532015-01-15015 January 2015 Request for Withholding Information from Public Disclosure ML14238A6912014-09-0303 September 2014 Bbs Proprietary Denial Letter ML14129A3392014-05-14014 May 2014 Request for Withholding Information from Public Disclosure ML13016A5002013-01-30030 January 2013 Request for Withholding Information from Public Disclosure for Braidwood Station, Units 1 & 2; Byron Station, Units 1 & 2; Clinton Power Station, Unit 1; Dresden Nuclear Power Station, Units 2 & 3; LaSalle County Station, Units 1 & 2 ML12136A2672012-05-23023 May 2012 Request for Withholding Information from Public Disclosure ML1129203422011-11-0303 November 2011 Request for Withholding Information from Public Disclosure Affidavit CAW-11-3137 ML1129305492011-11-0303 November 2011 Request for Withholding Information from Public Disclosure Affidavit CAW-11-03 ML1113306882011-06-0303 June 2011 Request for Withholding Information from Public Disclosure ML1036400332011-01-21021 January 2011 Request for Withholding Information from Public Disclosure ML0919403202009-09-23023 September 2009 Withholding from Public Disclosure, CAW-09-2584, (TAC Nos. ME1613, ME1614, ME1615, and ME1616.) ML0925101482009-09-10010 September 2009 Withholding Information from Public Disclosure ML0923706472009-09-0202 September 2009 Request for Withholding Information from Public Disclosure ML0921603032009-08-0505 August 2009 Request for Withholding Information from Public Disclosure ML0907103302009-04-30030 April 2009 Corp., Request for Withholding Information from Public Disclosure ML0819801082008-08-0404 August 2008 Request for Withholding Information from Public Disclosure TS 5.5.9, SG Program - Us Iarc ML0809206882008-04-0404 April 2008 Request for Withholding Information from Public Disclosure. (Tacs. MD8158/MD8159) ML0800705362008-01-31031 January 2008 Byron Station Units 1 and 2, Withholding from Public Disclosure, LTR-CDME-07-212 P-Attachment, Supplemental Information Relating to the Application for TS Improvement Re Steam Generator Tube Integrity, (Proprietary) (Tacs. MD7479, MD7482) ML0712902492007-05-16016 May 2007 Westinghouse, Request for Withholding Information from Public Disclosure ML0706801162007-03-28028 March 2007 Request for Withholding Information from Public Disclosure from Westinghouse SG Amend RAI 21507 ML0707203002007-03-28028 March 2007 Westinghouse LLC, Request for Withholding Information from Public Disclosure for Byron, Unit 2 and Braidwood, Unit 2 - SG-CDME-07-02P ML0706602592007-03-26026 March 2007 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Byron Unit 2 and Braidwood, Unit 2 - Ltr. Dated 2/23/07 ML0706100602007-03-14014 March 2007 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure ML0627802872006-11-0808 November 2006 Withholding from Public Disclosure, Westinghouse Electric Company LLC, SG-SGDA-06-20-P-Attachment, Revision 1, MC8967 & MC8969 ML0620006702006-09-20020 September 2006 Westinghouse Request for Withholding Information from Public Disclosure by Letter Dated October 3, 2005, ML0624402462006-09-15015 September 2006 Westinghouse Request for Withholding Information from Public Disclosure for Byron Unit 1 and Braidwood Unit 2 by Letter Dated 03/31/2006 ML0610101122006-05-25025 May 2006 Westinghouse, Withholding from Public Disclosure, Request for Exemption from Provisions of 10 CFR 50.44, 10 CFR 50.46, & 10 CFR 50 Appendix K for Select Rods in Lead Test Assemblies (Ltas) with Axiomtm Clad Material & Supporting Justificati ML0522300992005-08-16016 August 2005 Westinghouse, Request for Withholding Information from Public Disclosure for Byron, Unit 2 and Braidwood, Unit 2 ML0404404252004-02-13013 February 2004 (Egc), Withholding Information from Public Disclosure, Jeffrey A. Benjamin 02/05/2004 Letter Addressing an Issue Related to EGC Plants ML0309008372003-04-24024 April 2003 Request for Withholding Information from Public Disclosure 2021-07-23
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 18, 2016 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)
Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR BYRON STATION, UNIT NOS. 1AND2, AND BRAIDWOOD STATION, UNITS 1 AND 2 (TAC NOS. MF6715, MF6716, MF6717, AND MF6718)
Dear Mr. Hanson:
By letter dated September 11, 2015, you submitted an affidavit dated July 29, 2015, executed by Gayle Elliott of AREVA Inc., requesting that the information contained in the following documents be withheld from public disclosure pursuant to Title 1O of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
- Calculation Summary Sheet 32-9236713-001, "Byron and Braidwood RVCH Nozzle As-Left J-Groove Analysis"
- Calculation Summary Sheet 32-9237284-001, "Byron/Braidwood RVCH Nozzle IDTB Repair Weld Anomaly" The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
- 1. Information contained in these Documents has been classified by AREVA as proprietary in accordance with the policies established by AREVA Inc. for the control and protection of proprietary and confidential information.
- 2. These Documents contain information of a proprietary and confidential nature and is of the type customarily held in confidence by AREVA and not made available to the public.
Other companies regard information of the kind contained in these Documents as proprietary and confidential.
- 3. These Documents have been made available to the U.S. Nuclear Regulatory Commission in confidence with the request that the information contained in these Documents be withheld from public disclosure. The request for withholding of proprietary information is made in accordance with 10 CFR 2.390. The information for which withholding from disclosure is requested qualifies under 10 CFR 2.390(a)(4)
"Trade secrets and commercial or financial information."
- 4. The following criteria are customarily applied by AREVA to determine whether information should be classified as proprietary:
B. Hanson (a) The information reveals details of AREVA's research and development plans and programs or their results.
(b) Use of the information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources, to design, produce, or market a similar product or service.
(c) The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA.
(d) The information reveals certain, distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA in product optimization or marketability.
(e) The information is vital to a competitive advantage held by AREVA, would be helpful to competitors to AREVA, and would likely cause substantial harm to the competitive position of AREVA.
The information in these Documents is considered proprietary for the reasons set forth in paragraphs 4(c), 4(d) and 4(e) above.
- 5. In accordance with AREVA's policies governing the protection and control of information, proprietary information contained in these Documents has been made available, on a limited basis, to others outside AREVA only as required and under suitable agreement providing for nondisclosure and limited use of the information.
- 6. AREVA policy requires that proprietary information be kept in a secured file or area and distributed on a need-to-know basis.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the Calculation Summary Sheet 32-9236713-001, "Byron and Braidwood RVCH Nozzle As-Left J-Groove Analysis" and the Calculation Summary Sheet 32-9237284-001, "Byron/Braidwood RVCH Nozzle IDTB Repair Weld Anomaly" marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the
B. Hanson NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-6606.
Sincerely, Joel S. Wiebe, Senior Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licenses Office of Nuclear Reactor Regulation Docket Nos. STN 50-456, STN 50-457, STN 50-454 and STN 50-455:
cc: Distribution via Listserv Gayle Elliott, Manager, Product Licensing 3315 Old Forest Road Lynchburg, VA 24501
ML16039A338 OFFICE LPL3-2/PM LPL3-2/LA LPL3-2/BC/A LPL3-2/PM NAME JWiebe SRohrer JPoole JWiebe DATE 2/11/16 2/9/16 2/17/16 2/18/16