Letter Sequence Request |
---|
|
|
MONTHYEARML16231A1322016-08-18018 August 2016 Materials for 8/18/16 Pre-Application Meeting Brunswick Mellla+ LAR Project stage: Request ML16264A3352016-10-17017 October 2016 Summary of August 18, 2016, Pre-Submittal Meeting with Duke Energy Regarding Mella+ License Amendment Request Project stage: Meeting 2016-10-17
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22091A1332022-04-0101 April 2022 Bru Har Combined 2021 Assessment Meeting Slides ML21041A4532021-02-17017 February 2021 Brunswick/Nrc Pre-submittal Meeting: LAR to Adopt TSTF-505, Rev. 2 (Risk-Informed Completion Times) Presentation ML21011A0822021-01-12012 January 2021 Pre-Submittal Meeting January 12, 2021, Revision to VRR-01, Full Stroke Testing of Safety/Relief Valves - Presentation Material ML20100G6342020-04-0909 April 2020 Revised- Bru 2019 Annual Assessment Meeting Slides ML20034F2842020-02-0303 February 2020 Implementation of TSTF-564 - NRC Conference Call - February 5, 2020 ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML18255A0102018-09-12012 September 2018 NRC Slides for Target Rock Public Meeting ML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 ML17297B7892017-10-26026 October 2017 Meeting Slide for Partially Closed Pre-submittal Public Meeting with Duke Energy for License Amendment Request to Adopt Areva'S XM-11 Fuel Methodology for Brunswick Steam Electric Plant ML17229B2942017-08-22022 August 2017 Meeting Slide Regarding Partially Closed Pre-submittal Public Meeting with Duke Energy for a License Amendment Request for Brunswick Steam Electric Plant ML16231A1322016-08-18018 August 2016 Materials for 8/18/16 Pre-Application Meeting Brunswick Mellla+ LAR ML16210A5152016-07-28028 July 2016 Bnp Commercial Grade Dedication Issue (Printable) ML16134A1742016-05-12012 May 2016 Summary of Public Meeting - 2015 Annual Assessment Regarding Brunswick, Units 1 and 2 ML15125A4602015-05-0505 May 2015 Summary of Public Meeting to Discuss the Annual Assessment of the Brunswick Steam Electric Plant with the Public for the Period of January 1, 2014, Through December 31, 2014 ML14140A1882014-05-19019 May 2014 Summary of Public Meeting - 2013 Annual Assessment Regrading Brunswick Steam Electric Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13277A0382013-09-24024 September 2013 GEH Presentation on Methods Applicability to Areva Atrium 10XM Fuel ML13277A0372013-08-20020 August 2013 Duke Energy Presentation - Brunswick Mellla+ Methods Applicability, Pre-Application Meeting, August 20, 2013 ML12206A3252012-08-0707 August 2012 G20120513/EDATS: OEDO-2012-0436 - Briefing Book for Meeting with Duke Energy on August 7, 2012 ML12188A0712012-07-11011 July 2012 G20120473/ EDATS: OEDO-2012-0404 - Briefing Book - Briefing Package for Meeting with Duke Energy on July 11, 2012 ML12158A3442012-06-0606 June 2012 Meeting Slides for Pre-Application Meeting with Carolina Power and Light Company Regarding Emergency Diesel Generator Completion Time Extension for Brunswick Steam Electric Plant, Units 1 and 2 ML12152A1452012-05-31031 May 2012 20120531 Bnp NRC Pre-LAR Application Meeting Final ML1115109972011-05-31031 May 2011 Category 1 Public Meeting - Meeting Summary - Annual Assessment of Brunswick Steam Electric Plant ML1020304622010-07-20020 July 2010 Groundwater Protection Status ML1016705232010-06-0808 June 2010 NRC Fire Protection Screening Criteria, Brunswick Nuclear Plant ML1015404182010-05-27027 May 2010 Meeting Summary - Public Meeting - Brunswick Steam Electric Plant Annual Assessment - Reactor Oversight Program 2009 Presentation Slides ML1001507632010-01-15015 January 2010 Meeting Presentation Brunswick Nuclear Plant Human Performance ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit ML1019404532008-05-21021 May 2008 Email from Grzeck, Lee to Heather Gepford, Austin, Joe, George Kuzo, England, Louise, Kemp, Daniel and Dale.Dusenbury@Ncmail.Net; Subject: Storm Drain Collection Basin and Storm Drain Stabilization.Pdf; Sampling Locations Data Updated 5-19- BSEP 07-0108, Areva Presentation Slides for Brunswick Fuel Transition License Amendment Request2007-07-31031 July 2007 Areva Presentation Slides for Brunswick Fuel Transition License Amendment Request ML0711503272007-04-23023 April 2007 Brunswick, EOC Slides, Cy 2006 ML0710803842007-04-18018 April 2007 Presentation Slides from Public Management Meeting to Discuss Brunswick Site and Emergency Diesel Generator Improvements ML0710804062007-04-0505 April 2007 Emergency Diesel Generator No. 1 Trip and Failure of Engine Crankshaft Bearing ML0615301932006-03-27027 March 2006 NFPA 805 Pilot Observation Visit Trip Report - March 2006 - Handouts ML0607903052006-03-10010 March 2006 Meeting Handouts for Summary of Meeting W/Carolina Power & Light Regarding the Fuel Transition Process and Licensing Submittals for Brunswick, Units 1 & 2 ML0529003762005-10-0505 October 2005 Meeting with Carolina Power & Light, Meeting Handouts, MSIV Leakage Rate Limit License Amendment Request ML0523604402005-08-11011 August 2005 Attachment 4 - Progress Energy Slides ML0511004572005-04-12012 April 2005 NRC CY2004 Annual Assessment Meeting - Brunswick - Southport, North Carolina, April 12, 2005 ML0504003192005-02-0404 February 2005 Summary of Meeting with Progress Energy Re Brunswick Steam Electric Plant ML0503902102005-01-27027 January 2005 Scoping Meeting Slides Re Brunswick Steam Electric Plant, Units 1 & 2 ML0436402692004-12-0909 December 2004 Progress Energy, Meeting Briefing of 12/9/04, Fire Protection Program ML0901504242004-08-25025 August 2004 Progress Energy Carolinas, Inc., Handouts for the Brunswick and H.B. Robinson NPP Tours During the Shearon Harris Scol Environmental Site Audit of Alternative Sites ML0403505052004-01-0707 January 2004 Meeting Handouts with Progress Energy to Discuss Fire Protection Initiatives ML0333601902003-11-25025 November 2003 Meeting Summary - Brunswick Steam Electric Plant ML0327206212003-09-24024 September 2003 Examiner - Vendor Matrix with Phone Number ML0327206112003-09-22022 September 2003 Exam Process 2022-09-14
[Table view] Category:Slides and Viewgraphs
MONTHYEARML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22109A2122022-04-20020 April 2022 Duke Energy Pre-Submittal Public April 20, 2022, Meeting Presentation ML22091A1332022-04-0101 April 2022 Bru Har Combined 2021 Assessment Meeting Slides ML21322A3262021-11-29029 November 2021 Duke Energy November 29, 2021 Pre-Submittal Public Meeting Slides for EOF Relocation Licensing Amendment Request ML21090A1162021-03-31031 March 2021 Combined 2020 Aam Presentation ML21041A4532021-02-17017 February 2021 Brunswick/Nrc Pre-submittal Meeting: LAR to Adopt TSTF-505, Rev. 2 (Risk-Informed Completion Times) Presentation ML21033A7022021-02-0303 February 2021 Pre-submitting for Planned LAR for Standby Liquid Control Tank Volume Increase ML21011A0822021-01-12012 January 2021 Pre-Submittal Meeting January 12, 2021, Revision to VRR-01, Full Stroke Testing of Safety/Relief Valves - Presentation Material ML20100G6342020-04-0909 April 2020 Revised- Bru 2019 Annual Assessment Meeting Slides ML20099C9992020-04-0808 April 2020 Har 2019 Mtg Slides ML20099D1282020-04-0808 April 2020 Bru 2019 Mtg Slides ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML19123A3532019-05-0202 May 2019 Public Meeting Summary - Brunswick Steam Electric Plant, Docket Nos. 05000325 and 05000324 ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 ML17297B7892017-10-26026 October 2017 Meeting Slide for Partially Closed Pre-submittal Public Meeting with Duke Energy for License Amendment Request to Adopt Areva'S XM-11 Fuel Methodology for Brunswick Steam Electric Plant ML17229B2942017-08-22022 August 2017 Meeting Slide Regarding Partially Closed Pre-submittal Public Meeting with Duke Energy for a License Amendment Request for Brunswick Steam Electric Plant ML16231A1322016-08-18018 August 2016 Materials for 8/18/16 Pre-Application Meeting Brunswick Mellla+ LAR ML16210A5152016-07-28028 July 2016 Bnp Commercial Grade Dedication Issue (Printable) ML16134A1742016-05-12012 May 2016 Summary of Public Meeting - 2015 Annual Assessment Regarding Brunswick, Units 1 and 2 ML14140A1882014-05-19019 May 2014 Summary of Public Meeting - 2013 Annual Assessment Regrading Brunswick Steam Electric Plant ML14135A5112014-04-17017 April 2014 Enclosure 4 to BSEP 14-0048 - Areva Mellla+ Methods Applicability Presentation (Non-Proprietary Version) ML14135A5092014-04-17017 April 2014 Enclosure 1 to BSEP 14-0048, Duke Energy Presentation - Brunswick Mellla+ Methods Applicability, Pre-Application Meeting ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13277A0382013-09-24024 September 2013 GEH Presentation on Methods Applicability to Areva Atrium 10XM Fuel ML13277A0372013-08-20020 August 2013 Duke Energy Presentation - Brunswick Mellla+ Methods Applicability, Pre-Application Meeting, August 20, 2013 ML13130A2552013-05-10010 May 2013 4/24/2013 - Meeting Summary - Category 3 Public Meeting - Annual Assessment of Brunswick Steam Electric Plant ML12181A0362012-06-29029 June 2012 Meeting Summary - Category 1 Public Meeting - Annual Assessment of Brunswick Steam Electric Plant, Docket Nos. 50-325, 50-324 ML12158A3442012-06-0606 June 2012 Meeting Slides for Pre-Application Meeting with Carolina Power and Light Company Regarding Emergency Diesel Generator Completion Time Extension for Brunswick Steam Electric Plant, Units 1 and 2 ML11102A0052011-04-12012 April 2011 Progress Energy - Slides for NFPA 805 Pre-LAR Application Meeting April 12, 2011 ML1020304622010-07-20020 July 2010 Groundwater Protection Status ML1016705232010-06-0808 June 2010 NRC Fire Protection Screening Criteria, Brunswick Nuclear Plant ML1015404182010-05-27027 May 2010 Meeting Summary - Public Meeting - Brunswick Steam Electric Plant Annual Assessment - Reactor Oversight Program 2009 Presentation Slides ML1001507632010-01-15015 January 2010 Meeting Presentation Brunswick Nuclear Plant Human Performance ML1001507042010-01-14014 January 2010 Human Performance Slides ML0930206712009-10-22022 October 2009 Emergency Diesel Generators - Progress Energy ML1019400952009-10-0808 October 2009 Marsh, River, and Creek Tritium Results Updated 10/08/09 ML1019400932009-10-0808 October 2009 Groundwater Well Samples Results, Updated 10/08/09 ML0923210802009-08-20020 August 2009 MELLLA Plus Implementation ML0921609632009-08-0404 August 2009 Meeting Summary - Public Meeting Category 1 - Preliminary White Finding - Brunswick Steam Electric Plant ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit ML1019404532008-05-21021 May 2008 Email from Grzeck, Lee to Heather Gepford, Austin, Joe, George Kuzo, England, Louise, Kemp, Daniel and Dale.Dusenbury@Ncmail.Net; Subject: Storm Drain Collection Basin and Storm Drain Stabilization.Pdf; Sampling Locations Data Updated 5-19- ML0813006582008-05-0101 May 2008 EOC 2007 NRC Slides ML0813006662008-05-0101 May 2008 EOC 2007 Progress Energy Slides ML1019405012008-04-0101 April 2008 Annual Report Slides BSEP 07-0108, Areva Presentation Slides for Brunswick Fuel Transition License Amendment Request2007-07-31031 July 2007 Areva Presentation Slides for Brunswick Fuel Transition License Amendment Request ML0711503272007-04-23023 April 2007 Brunswick, EOC Slides, Cy 2006 ML0710803842007-04-18018 April 2007 Presentation Slides from Public Management Meeting to Discuss Brunswick Site and Emergency Diesel Generator Improvements 2022-09-14
[Table view] |
Text
Brunswick Steam Electric Plant (BSEP) - Units 1 and 2 Maximum Extended Load Line Limit Analysis Plus (MELLLA+)
Brunswick Steam Electric Plant (BSEP) - MELLLA+ Slide 2 Purpose of Presentation Provide NRC -
Background
Overview of Proposed License Changes License Application Request Contents
- LAR Body
- Safety Analysis Report
- Proposed Markups
- Supporting Documents Similarities with other MELLLA+ Submittals
- T.S. Instrumentation
- Standby Liquid Control Boron Enrichment
- Operational Restrictions
- T.S. Administrative Requirements Differences with other MELLLA+ Submittals Licensing/Implementation Timeline 2
Brunswick Steam Electric Plant (BSEP) - MELLLA+ Slide 3
Background
The 2002 Extended Power Uprate (EPU) reduced the licensed flow window at rated power from approximately 24% to 6% Total Core Flow.
MELLLA+ will expand the licensed flow window at 100% power to approximately 20% Total Core Flow.
Operating domain expansion does not include changes to the licensed reactor power, the maximum licensed core flow or the current dome pressure Benefits Increased net electric generation
- Lower average pumping power
- Fewer downpowers Fewer reactivity manipulations 3
Brunswick Steam Electric Plant (BSEP) - MELLLA+ Slide 4 Overview of Proposed Licensing Changes T.S. Instrumentation
- Changes consistent with GEH DSS-CD LTR template (NEDC-33075P-A, Revision 8) *
- TS LCO 3.3.1.1 RPS Instrumentation (Simulated Thermal Power- High setpoints and OPRM Upscale)
- New proposed LCO actions for equipment out of service including Automated Backup Stability Protection Standby Liquid Control Boron Enrichment
- TS 3.1.7 SLC Boron-10 minimum enrichment increased to 92 atom-%
- Revised graph showing required volume (TS Figure 3.1.7-1) - no changes to boron concentration Operational Restrictions
- License Condition - Operation in MELLLA+ domain not allowed with Feedwater Temperature Reduction (FWTR)
- LCO 3.4.1 - Operation in MELLLA+ not allowed with Single Loop Operation (SLO)
T.S. Administrative Requirements
- TS 5.6.5 - COLR content requirements for MELLLA+ / Updated list of analytical methods
- New TS 5.6.7 - Reporting requirements supporting LCO 3.3.1.1 changes
- Earlier plans to utilize AREVAs Enhanced Option III stability solution for MELLLA+ were revised to the GEH DSS-CD stability solution 4
Brunswick Steam Electric Plant (BSEP) - MELLLA+ Slide 5 License Application Request (LAR) Contents LAR Body
- Provides roadmap of changes and justification, no significant hazards, etc.
- Provides specific discussion addressing license changes
- Additional topics based on Operating Experience from other docketed MELLLA+ submittals Safety Analysis Report (SAR)
- Follows the NRC Approved GEH MELLLA+ Licensing Topical Report (LTR) - NEDC-33006P-A
- Integrates analyses from GEH, AREVA and Others
- Summarizes the results of significant safety evaluations
- Proprietary and non-proprietary versions included Proposed Mark-ups
- Technical Specifications
- Operating License
- TS Bases (information only)
Supporting Documents - proprietary and non-proprietary
- Methods Applicability Report
- Representative cycle MELLLA+ Reload Safety Analysis Report (RSAR)
- Representative cycle Fuel Cycle Design Report
- LOCA-ECCS Analysis Report 5
Brunswick Steam Electric Plant (BSEP) - MELLLA+ Slide 6 Similarities with other MELLLA+ Submittals (Monticello, Grand Gulf, Nine Mile Point-2, Peach Bottom)
T.S. Instrumentation
- Changes consistent with DSS-CD LTR and other plants
- Some minor administrative variations Standby Liquid Control Boron Enrichment (from 47 atom-% to 92 atom-%)
- Not included as part of all MELLLA+ submittals - adopted to provide additional ATWS margin.
- Minimal changes to existing BSEP TS
- Similar to approved NMP2 SLC Submittal Operational Restrictions
- Operation in MELLLA+ domain not allowed with Feedwater Temperature Reduction (FWTR)
- Single Loop Operation (SLO) not allowed in the MELLLA+ domain T.S. Administrative Requirements
- TS 5.6.5 - COLR content requirements for MELLLA+ / Updated list of analytical methods
- New TS 5.6.7 - Reporting requirements supporting LCO 3.3.1.1 changes BSEP license changes are consistent with license changes approved for other MELLLA+ Plants 6
Brunswick Steam Electric Plant (BSEP) - MELLLA+ Slide 7 Differences with other MELLLA+ Submittals The major difference for BSEP is the use of a full core of AREVA ATRIUMTM 10XM Fuel. The justification demonstrating the acceptability of ATRIUMTM 10XM in the MELLLA+ operating domain is addressed in the MELLLA+ SAR as follows:
GEH methodologies and analyses address:
- Detect and Suppress Solution - Confirmation Density (DSS-CD) solution
- Long term ATWS and ATWS instability explicitly modeling ATRIUMTM 10XM fuel
- Uncertainties in modeling ATRIUMTM 10XM fuel with GEH methods addressed AREVA methodologies and analyses address:
- Thermal-Hydraulics, Core Neutronics, Transient Analysis, Overpressure, LOCA and Stability are all evaluated and acceptable for MELLLA+ conditions
- There are no SER restrictions on AREVA methodology that are impacted by MELLLA+
operation
- MELLLA+ core and assembly conditions for Brunswick are equivalent to core and assembly conditions of other plants for which the methodology was benchmarked
- Additional details on the application of AREVA methods to MELLLA+ conditions are addressed in the AREVA Report ANP-3108P included with the LAR submittal 7
Brunswick Steam Electric Plant (BSEP) - MELLLA+ Slide 8 License Amendment Request Timeline BSEP MELLLA+ LAR submittal (both Units) September 2016 NRC reviews (18 - 24 months) 3Q 2016 - 3Q 2018 MELLLA+ approval (both Units) 3Q 2018 MELLLA+ implementation
- UNIT 1 - Online during B1C22 3Q 2018
- UNIT 2 - Online during B2C23 3Q 2018 8
Brunswick Steam Electric Plant (BSEP) - MELLLA+ Slide 9 Questions and Discussion?
9