ML17056B314
| ML17056B314 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 05/31/1989 |
| From: | Dahlberg K NIAGARA MOHAWK POWER CORP. |
| To: | |
| Shared Package | |
| ML17056B295 | List: |
| References | |
| NUDOCS 9102200129 | |
| Download: ML17056B314 (2) | |
Text
OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: (315) 349-2443 OPERATING STATUS
- 1. Unit Name: Nine Mile Point Unit //1
- 2. Reporting Period: 5/1/89 through 5/31/89 Notes 3 Licensed Thermal Power (MWt):
~ 1850
- 4. Nameplate Rating (Gross MWe): 640
- 5. Design Electrical Rating (Net MWe): 620
- 6. Maximum Dependable Capacity (Gross MWe): 630
- 7. Maximum Dependable Capacity (Net MWe): 610
- 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 744.0 3,623.0 172,752.2
- 12. Number of Hours Reactor Was Critical 0.0 0.0 115,234.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 1,204.2
- 14. Hours Generator On-Line 0.0 0.0 112,117.2
- 15. Unit Reserve Shutdown Hours 0.0 0.0 20.4
- 16. Gross Thermal Energy Generated (MWH) 0.0 0.0 188,473,132.0
- 17. Gross Electrical Energy Generated (MWH) 0.0 0.0 62)473p070 0
- 18. Net Electrical Energy Generated (MWH) 0.0 0.0 60,524,382.0
- 19. Unit Service Factor 0.0 0.0 64.9
- 20. Unit Availability Factor 0.0 0.0 64.9
- 21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 57.4
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 56,5
- 23. Unit Forced Outage Rate 100.0 100.0 20.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Refuel outa e started on anunr 22 I 88.
- 26. Unit is Test Status (Prior to Commercial Operation): Forecast Achieved IN1TIALCR1TICAL1TY INlTIALELECTRIC1TY COMMERCIAL OPERATION p P10207 1 02200 129'50QQ22Q 9pDR" ADOCK PDR R
4 Py lg l