MONTHYEARML24256A1672024-10-31031 October 2024 October 2024 Perry Plant License Renewal Draft Environmental Impact Statement Public Meeting Slides ML23291A0572023-10-25025 October 2023 Environmental Scoping Meeting Related to the Perry Nuclear Power Plant, Unit 1 License Renewal Application - Virtual Meeting Slides ML23291A0702023-10-18018 October 2023 Environmental Scoping Meeting Related to the Perry Nuclear Power Plant, Unit 1 License Renewal Application - In-person Meeting Slides ML23046A1682023-02-16016 February 2023 License Renewal Application - 2nd Safety Pre-Application Meeting, February 16, 2023 (Perry Slides) ML23044A2082023-02-14014 February 2023 February 14, 2023, Second Perry Nuclear Power Plant License Renewal Environmental Pre-application Public Meeting - NRC Slides ML23044A2122023-02-14014 February 2023 February 14, 2023, Second Perry Nuclear Power Plant License Renewal Environmental Pre-application Public Meeting - Energy Harbor Slides ML22199A0232022-07-21021 July 2022 July 21, 2022, Perry Nuclear Power Plant License Renewal Environmental Pre-application Public Meeting - NRC Slides ML22199A0352022-07-21021 July 2022 July 21, 2022, Perry Nuclear Power Plant License Renewal Environmental Pre-application Public Meeting - Energy Harbor Slides ML22200A2222022-07-21021 July 2022 License Renewal Application - Safety Pre-Application Meeting July 21, 2022 (Perry Slides) ML22201A0052022-07-19019 July 2022 License Renewal Application - Safety Pre-Application Meeting July 21, 2022 (NRC Slides) ML21176A1992021-06-25025 June 2021 Slideshow Presentation for 2020 End -of-Cycle Public Meeting for Davis-Besse and Perry ML21047A1522021-02-16016 February 2021 Slides - Perry Pre-Application Flooding 2/16/2021 Meeting Slides (L-2021-LRM-10016) ML20210M0712020-07-27027 July 2020 Combined End-of-Cycle 2019 Public Meeting Slide Presentation ML18054B6002018-02-21021 February 2018 Drywell General Area Heat Detectors License Amendment Request - Pre-Submittal Meeting, Perry Nuclear Power Plant, February 21, 2018 ML17205A0362017-07-19019 July 2017 Presentation for 2016 Perry EOC Open House ML16307A4052016-09-14014 September 2016 R-III Rug 15 Sep 16 Presentation ML16047A1332016-02-0909 February 2016 February 9, 2016, Public Meeting Slides for License Amendment Request for Drain Down of Upper Containment Pool in Mode 3 ML14079A0912014-03-18018 March 2014 NRC - Perry 2013 Annual Assessment Public Meeting Slides ML13294A5972013-10-21021 October 2013 FENOC Presentation Slides for Public Meeting September 24, 2013 ML13281A5302013-10-15015 October 2013 Meeting Slide for FENOC - NRC Pre-Submittal Meeting Request for Licensing Action ML13101A1432013-04-10010 April 2013 NRC 2012 Annual Assessment Presentation ML13101A1522013-04-10010 April 2013 2012 Annual Assessment Presentation ML12269A0612012-09-26026 September 2012 FENOC Presentation for 2012-09-26 Public Meeting ML12094A2932012-04-0303 April 2012 Licensee Slides for Annual Assessment Meeting ML12086A2002012-03-26026 March 2012 NRC Slides Regarding Perry Nuclear Plant EOC Meeting for Cy 2011 ML1122408232011-08-11011 August 2011 Annual Assessment Meeting, 2010 Reactor Oversight Program ML1122805732011-08-11011 August 2011 Licensee Presentation Slides from 2010 EOC Meeting 8/11/11 ML1117303602011-06-21021 June 2011 FENOC Licensee Slides for 6-21-11 All FENOC Meeting ML1021500692010-07-28028 July 2010 NRC Slides for Perry, July 28, 2010; Annual Assessment Meeting ML1021500852010-07-28028 July 2010 Licensee Slides for Perry; July 28, 2010; Annual Assessment Meeting ML1009102662010-03-31031 March 2010 Slides FENOC and NRC Senior Management Briefing, 3-31-10 ML0932005842009-11-12012 November 2009 FENOC Presentation for NRC Public Meeting ML0932101992009-11-12012 November 2009 NRC Slides from Public Meeting with Firstenergy Nuclear Operating Company ML0920900792009-07-21021 July 2009 Licensee Slides from End of Cycle - Public Meeting ML0920900682009-07-21021 July 2009 Slides for Perry Nuclear Power Plant Annual Assessment Meeting, Reactor Oversight Program - Cy 2008 ML0811506052008-04-24024 April 2008 Summary of Public Meeting with Firstenergy Nuclear Operating Co. to Discuss the 2007 Perry End-of-Cycle Performance Assessment ML0801604842008-01-0909 January 2008 Slides - FENOC Public Meeting, Senior Management Briefing, January 9, 2008 ML0708602302007-03-21021 March 2007 Slides, Perry Annual Assessment Meeting Reactor Oversight Process - Cy 2006. ML0708602352007-03-21021 March 2007 Slides, Perry Confirmatory Action Letter Closure Meeting. ML0708602382007-03-21021 March 2007 Perry EOC Cy 2006 Slides FENOC (EOC-Public Meeting) ML0708602462007-03-21021 March 2007 Perry EOC Cy 2006 Slides FENOC (CAL Closure - Public Meeting) ML0701205622007-01-10010 January 2007 Public Meeting - FENOC Meeting Slides ML0634900272006-12-13013 December 2006 NRC Slides from Public Meeting to Discuss Results of NRC Confirmatory Action Letter Follow-Up Inspections ML0634900242006-12-13013 December 2006 FENOC Slides from Perry Public Meeting to Discuss Results of NRC Confirmatory Action Letter Followup Inspections ML0623001332006-08-15015 August 2006 NRC Perry 8-15-06 Public Meeting Slides ML0623001242006-08-15015 August 2006 Licensee Public Meeting Slides ML0733408162006-07-14014 July 2006 Michael Johnson Ltr. Confirmatory Order (EA-01-082, EA-04-172) ML0619304062006-07-11011 July 2006 FENOC CAL Followup Inspection Public Meeting Presentation Slides ML0619303972006-07-11011 July 2006 NRC CAL Followup Inspection Public Meeting Presentation Slides for Perry ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 2024-10-31
[Table view] |
Text
Perry Nuclear Power Plant Annual Assessment Summary 2016 Reactor Oversight Process Nuclear Regulatory Commission - Region III
What We/NRC Regulate What It Includes Reactors Materials Safety Security Waste Environment What We Dont Regulate Assurance of Plant Safety Elements Continuous Training Long-Term Maintenance Military Radon Regulation Compliance Defense In-X-Rays Depth 1
How We Regulate Regulatory Framework NRCs Safety Mission Strategic Performance Areas Cornerstones Cross-Cutting Areas Human Performance--Safety Conscious Work Environment--Problem Identification & Resolution Performance Indicators Significance Threshold Performance Indicators 17 Performance Indicators PIs for each cornerstone Green White Yellow Red Licensee submits data to NRC Increasing Safety Significance quarterly Inspection program verifies accuracy Inspection Findings Data available on NRC website Green White Yellow Red Increasing Safety Significance 2
Action Matrix Columns Industry-Wide Performance 90 86 80 As of 02/27/2017 Multiple/Repetitive 70 Licensee Regulatory Degraded Unacceptable Degraded Response Response Performance Performance 60 Cornerstone 50 40 30 20 10 Increasing: 10 0 3 0
- Regulatory Action Industry-Wide Inspection Findings Industry-Wide Performance Indicators Finding data current as of 2/22/2017 693 700 6713 7000 600 Calendar Year 6000 Calendar Year 500 2016 data 2016 data 5000 400 300 4000 200 3000 100 2000 2 4 0
0 1000 0 7 0 0 0
Green White Yellow Red 3
NRC Annual Assessment Summary NRC Inspection Activities Perry Nuclear Power Plant Perry 2016 6728 total hours expended by NRC on Reactor The Licensee, FirstEnergy Nuclear Operating Oversight Process activities Company, operated the plant safely and in a manner that preserved the public health and safety and 2846 inspector hours of direct inspection activity protected the environment 663 inspector hours reviewing and observing plant Perry met all cornerstone objectives and was in the operating status Licensee Response Column of the NRCs ROP 1767 inspector hours of preparation for and Action Matrix for all quarters of 2016 documentation of inspection activities NRC plans baseline inspections at Perry in 2017 and 1452 hours0.0168 days <br />0.403 hours <br />0.0024 weeks <br />5.52486e-4 months <br /> for other Reactor Oversight Process one follow-up inspection for 4 traditional enforcement findings with the potential to impede the regulatory elements (e.g., assessments and communications) process for errors in reporting issues NRC Inspection Activities Perry Nuclear Power Plant Perry Nuclear Power Plant for 2016 PIs and Findings January 1 through December 31, 2016 2 resident inspectors on site - residents produced four quarterly inspection reports and walked through the 19 Green/Severity Level IV findings which included:
plant daily Emergency Core Cooling heat exchanger flow indication 27 other inspectors participated in various inspections instrument valves not properly aligned Failure to implement a periodic replacement of hoses used Major team inspections in 2016: with FLEX equipment Special inspection to review spurious opening of Use of a method for analyzing flooding which was not some reactor coolant system safety valves consistent with method in licensees design basis Failure to insure welding process on a RCS vent valve was Implementation of FLEX/Mitigating Strategies conducted properly ForceonForce exercise 4
Actions in Response to the NRC Social Media Japan Nuclear Accident Channels
- Mailbox for comments on staff actions:
JLD_Public.Resource@nrc.gov
- Office of Public Affairs Point of Contact:
OPA.resource@nrc.gov or 301-415-8200
- (301) 816-5100 (call collect)
Report a safety concern
- Allegation@nrc.gov General information or questions
- www.nrc.gov Perry NRC Resident Inspectors