Xc @~+4 geperMA gr jF~v ~ 7~ ~u/ w~4j~/yz wow/~ /~o>~
EOP: TITLE:
REV: 7 ECA-3 ' SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 1 of 27 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER TECHNICAL REVIEW PORC REVIE DATE PLANT SUPER ENDENT E FEC IVE DATE CATEGORY 1.0 REVIEWED BY:
920hih0395 920605 PDR ADOCK 05000244 P , PDR
4 "Y
a
]
C .f
EOP: TITLE:
REV: 7 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 2 of 27 A. PURPOSE This procedure provides actions for a SGTR with coincident loss of normal and auxiliary PRZR sprays and PORVs.
B. ENTRY CONDITIONS/SYMPTOMS
- 1. ENTRY CONDITIONS This procedure is entered from:
- a. E-3, STEAM GENERATOR TUBE RUPTURE, when PRZR pressure control is not available.
'l
EOP: T1TLE:
REV 7 ECA-3 ' SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 3 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: o Foldout Page should be open AND monitored periodical].y.
o Adverse CNMT values should be used whenever CNMT pressure is greater than 4 psig or CNMT radiation is greater than 10+ R/hr.
1 Check Ruptured S/G Narrow Go to Step 8.
Range Level LESS THAN 674
[554 adverse CNMT]
2 Check RCP Status AT LEAST Try t'o start one RCP:
ONE RUNNING
- a. Establish conditions for starting RCPT o Bus 11A and Bus 11B energized o Refer to Attachment RCP START
3 Check IF Normal PRZR Spray Available:
a, Verify IA to CNMT - AVAILABLE a. Perform the following:
- 1) Place PRZR heater control group to PULL STOP.
- 2) Place PRZR heater backup group to OFF.
- 3) Place normal spray valve controllers to MANUAL at 0%.
- 4) Go to Step 4.
- b. Go to E-3, STEAM GENERATOR TUBE RUPTURE, Step 20
V
~ 5)
EOP! T1TLE!
REV' ECA-3 ' SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 4 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 4 Try To Restore PRZR PORV:
- a. Block valves - AT LEAST ONE OPEN a. Open one block valve unless it was closed to isolate an open
'
MOV-516 for PCV-430 PORV.
~ MOV-515 for PCV-431C If block valves can NOT be opened, THEN dispatch AO to locally ensure breakers to block valves closed.
~ MOV-515, MCC C position 6C
~ MOV-516, MCC D position 6C
- c. Verify at least one PRZR PORV c. Go to Step 5.
flow path - AVAILABLE
- d. Go to E-3, STEAM GENERATOR TUBE RUPTURE, Step 21
C
~ g F I'
EOP TlTLE:
REV: 7 ECA-3 ' SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 5 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED
. NOTE: If auxiliary spray is the only means of RCS pressure control, THEN the 320'F AT limit between the spray line and PRZR does not apply.
5 Try To Establish Auxiliary Spray:
- a. Charging pumps - AT LEAST ONE a. Perform the following:
RUNNING
- 1) IF CCW flow is lost to any RCP thermal barrier OR any RCP ¹1 seal outlet temperature offscale high, THEN locally isolate seal injection to affected RCP.
~ RCP A, V-300A
~ RCP B, V-300B
- 2) Ensure HCV-142 demand at 0%.
- 3) Start charging pumps as necessary.
IF charging not available, THEN go to Step 6.
- b. Establish auxiliary spray flow: b. IF auxiliary spray can NOT be established, THEN go to Step 6.
- 1) Open auxiliary spray valve (AOV-296)
- 2) Close charging valve to loop B cold leg (AOV-294)
- c. Go to E-3, STEAN GENERATOR TUBE RUPTURE, Step 20b
i2 EOP: TI 1'LE:
REV: 7 ECA-3-3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 6 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED
CAUTION IF CST LEVEL DECREASES TO LESS THAN 5 FEET, THEN ALTERNATE WATER SOURCES FOR AFW PUMPS WILL BE NECESSARY (REFER TO ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS).
NOTE: TDAFW pump flow control valves fail open on loss of IA.
6 Check Intact S/G Level:
- a. Narrow range level - GREATER a. Maintain total feed flow greater THAN 5S [25$ adverse CNMT] than 200 gpm until narrow range level greater than 5% '[25%
adverse CNMT] in at least one S/G.
- b. Control feed flow to maintain b. IF narrow range level in intact narrow range level between 17% S/G continues to increase in an
[25% adverse CNMT] and 50% uncontrolled manner, THEN go to ECA-3.1, SGTR WITH LOSS OF REACTOR COOLANT - SUBCOOLED RECOVERY DESIRED, Step 1.
7 Check,PRZR Level GREATER Return to Step 1.
THAN 54 [304 adverse CNMT]
I T ~
C1 c4 pt D4;,
M)
~v' 4
t Ml 4C
EOP: TITLE:
REV: 7 ECA-3 ' SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 7 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 8 Check If SI Can Be Terminated:
- a. RCS subcooling based on core a. Do NOT stop SI pumps. Go to exit T/Cs - GREATER THAN O' ECA-3.1, SGTR WITH LOSS OF USING FIGURE MIN SUBCOOLING REACTOR COOLANT - SUBCOOLED RECOVERY DESIRED, Step 1.
- b. Secondary heat sink: b. IF neither condition satisfied, o Total feed flow to S/Gs GREATER THAN 200 GPM AVAILABLE to ECA-3 ',
THEN do NOT stop SI pumps.
SGTR WITH LOSS OF REACTOR COOLANT - SUBCOOLED Go RECOVERY DESIRED, Step 1.
-OR-o Narrow range level in intact S/G - GREATER THAN 5% [25%
adverse CNMT]
- c. RVLIS indication c. Do NOT stop SI pumps. Go to ECA-3.1, SGTR WITH LOSS OF o Level (no RCPs) - GREATER REACTOR COOLANT - SUBCOOLED THAN 68% [73% adverse CNMT] RECOVERY DESIRED, Step 1.
-OR-o Fluid fraction (any RCP running) - GREATER THAN 80%
- d. Any ruptured S/G narrow range d. Do NOT stop SI pumps. Return to level - INCREASING IN AN Step 2.
UNCONTROLLED MANNER OR OFFSCALE HIGH 9 Stop SI Pumps and Place In AUTO
f-1 c>
EOP: T1TLE:
REV: 7 ECA-3 ' SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 8 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED
- * * * * * * *, * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
- CAUTION ALIGNING SI PUMP SUCTION TO RWST BEFORE ISOLATING BAST MAY RESULT IN BACKFLOW FROM RWST TO BASTS.
10 Verify SZ Pump Suction Aligned To RWST:
- a. SI pump suction valves from a. Ensure at least one valve in BASTs - CLOSED each flow path closed.
~ MOV-826A ~ MOV-826A or MOV-826B
~ MOV-826B ~ MOV-826C or MOV-826D
~ MOV-826C
~ MOV-826D
~ MOV-825A
~ MOV-825B
e I
e+
EOP: TITLE:
REV 7 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 9 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED ll Check If Charging Flow Has Been Established:
- a. Charging pumps - ANY RUNNING a. Perform the following:
- 1) IF CCW flow is lost to any RCP thermal barrier OR any RCP ¹1 seal outlet temperature offscale high, THEN dispatch AO with key to RWST gate to close seal injection needle valve(s) to affected RCP:
~ RCP A, V-300A
~ RCP B, V-300B
- 2) Ensure HCV-142 open, demand at 0%.
- b. Charging pump suction aligned to b. Manually align valves as RWST' necessary. IF LCV-112B can NOT be opened, THEN perform the LCV-112B - OPEN following:
o LCV-112C - CLOSED 1) Verify charging pump A NOT running and place in PULL STOP.
- 2) Dispatch AO to locally open manual charging pump suction from RWST (V-358 located in charging pump room).
- 3) WHEN V-358 open, THEN direct AO to close V-268 to isolate charging pumps B and C from VCT (V-268 located in charging pump room).
- c. Start charging pumps as necessary and adjust charging flow to restore PRZR level
i~
~I tt ~
EOP: TITLE:
REV 7 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 10 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 12 Verify SI Flow Not Required: Perform the following:
o RCS subcooling based on core a. Manually operate SI pumps as exit T/Cs - GREATER THAN 0 F necessary.
USING FIGURE MIN SUBCOOLING
- b. Go to ECA-3.1, SGTR WITH LOSS OF o RVLIS indication REACTOR COOLANT - SUBCOOLED RECOVERY DESIRED, Step 1.
o Level (no RCPs) - GREATER THAN 68% [73% adverse CNMT]
-OR-o Fluid fraction (any RCP running) - GREATER THAN 80%
13 Verify Adequate SW Flow To CCW Hx:
- a. Verify at least two SW pumps a. Manually start pumps as power RUNNING supply permits (258 kw per pump). IF less than two SW pumps can be operated, THEN go to Step 20,
- b. Verify AUX BLDG SW isolation b. Establish SW to AUX BLDG (Refer valves - OPEN to Attachment AUX BLDG SW).
~ MOV-4615 and MOV-4734
~ MOV-4616 and MOV-4735
- c. Verify CNMT RECIRC fan c. Dispatch AO to locally throttle annunciator C-2, HIGH flow to CCW Hx to between TEMPERATURE ALARM - EXTINGUISHED 5000 gpm and 6000 gpm total flow.
EOP: TITLE:
REV 7 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 11 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 14 Check If Normal Operation, CVCS Can Be EstablisheQ
- a. Verify IA restored: a. Continue with Step 19. WHEN IA restored, THEN do Steps 14 o IA to CNMT (AOV-5392) - OPFN through 18.
o IA pressure - GREATER THAN 60 PSIG
- b. Verify instrument bus D- b. Energize MCC B. IF MCC B NOT ENERGIZED available, THEN perform the following:
- 1) Verify MCC A energized.
- 2) Place instrument bus D on maintenance supply.
- c. CCW pumps - ANY RUNNING c. Perform the following:
- 1) IF any RCP ¹1 seal outlet temperature offscale high, THEN isolate CCW to thermal barrier of affected RCP(s).
~ RCP A, MOV-749A and MOV-759A
~ RCP B, MOV-749B,and MOV-759B
- 2) Manually start one CCW pump.
- d. Charging pump - ANY RUNNING d. Continue with Step 20. WHEN any charging pump running, THEN do Steps 15 through 19 '
spf,,
'I
~
4~
EOP: TITLE:
REV: 7 ECA-3 ' ,SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 12 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 15 Check If Seal Return Flow Should Be Established:
- a. Verify RCP ¹1 seal outlet a. Go to Step 16.
temperature - LESS THAN 235'F
- b. Verify RCP seal outlet valves b. Manually open valves as OPEN necessary.
~ AOV-270A
+ AOV-270B
- c. Reset both trains of XY relays for RCP seal return isolation valve MOV-313
- d. Open RCP seal return isolation d. Perform the following:
valve MOV-313
- 1) Place MOV-313 switch to OPEN.
'.
- e. Verify RCP ¹1 seal leakoff flow IF any RCP seal leakoff flow LESS THAN 5.5 GPM greater than 5.5 gpm THEN:
o Close the affected RCP seal discharge valve
~ RCP A, AOV-270A
~ RCP B,'OV-270B o Trip the affected RCP IF both RCP seal discharge valves are shut, THEN go to Step 16.
- f. Verify RCP ¹1 seal leakoff flow f. Refer to AP-RCP.1, RCP SEAL GREATER THAN 0.25 GPM MALFUNCTION.
0 6"
Ik 0
l f 4 4
EOP: TITLE:
REV: 7 ECA-3.3 SGTR WITHOUT PRESSURI2',ER PRESSURE CONTROL PAGE 13 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: If PRZR level is less than 13%, letdown may be established by placing AOV-427 to OPEN.
16 Establish Normal Letdown: IF RCP seal return has been established, THEN establish excess
- a. Establish charging line flow to letdown as follows:
REGEN Hx - GREATER THAN 20 GPM o Place excess letdown divert
- b. Place the following switches to valve, AOV-312, to NORMAL.
CLOSE' o Ensure CCW from excess letdown Letdown orifice valves open, (AOV-745).
(AOV-200A, AOV-200B, and AOV-202) o Open excess letdown isolation
~ AOV-371, letdown isolation valve AOV-310.
valve
~ AOV-427, loop B cold leg to o Slowly open HCV-123 to maintain REGEN Hx excess letdown temperature less than 195'F and pressure less
- c. Place letdown controllers in than 100 psig.
MANUAL at 25% open o Adjust charging pump speed as
~ TCV-130 necessary.
~ PCV-135 IF RCP seal return NOT established,
- d. Reset both trains of XY relays THEN consult TSC to determine if for AOV-371 and AOV-427 excess letdown should be placed in service.
- e. Open AOV-371 and AOV-427
- f. Open letdown orifice valves as necessary
- g. Place TCV-130 in AUTO at 105'F
- h. Place PCV-135 in AUTO at 250 psig
- i. Adjust charging pump speed and HCV-142 as necessary
t
~,
EOP: TITLE:
REV: 7 ECA-3.3 SGTR WITHOUT PRESSURI2ER PRESSURE CONTROL PAGE 14 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 17 Check VCT Makeup System:
n t
- a. BAST levels - ANY GREATER THAN 50 a. Go to Step 18.
- b. Check Annunciator B-23, BORIC b. Perform the following:
ACID TANK LO LO LEVEL EXTINGUISHED 1) Adjust boric acid flow control valve to required flow from table.
BAST BORIC ACID LEVEL FLOW (GPM) 4.5
<10'0-15%
6.7 15-20$ 8.9
>20% 10.0
- 2) Go to Step 17d.
- c. 'Adjust boric acid flow control valve 'in AUTO to 4.5 gpm
- d. Verify the following: d. Adjust controls as necessary.
- 1) RMW mode selector switch in AUTO
- 2) RMW control armed - RED LIGHT LIT"
o Level - GREATER THAN 20%
- 1) Ensure BA transfer pumps and
-OR- RMW pumps running. IF NOT, THEN reset MCC C,and MCC'D UV o Level - STABLE OR INCREASING lockouts as necessary.
'2) Place,RMW flow control valve HCV-111 in MANUAL.
- 3) Increase RMW flow.
'1 4
4&<
EOP: T!TLE REV: 7 ECA-3 ' SGTR WITHOUT PRESSURXZER PRESSURE CONTROL PAGE 15 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 18 Check Charging Pump Suction Aligned To VCT:
- a. VCT level - GREATER THAN 208 a. IF VCT level can NOT be maintained greater than 58, THEN perform the following:
- 1) Ensure charging pump suction aligned to RWST o LCV-112B open o LCV-112C closed
- 2) Continue with Step 19. WHEN VCT level greater than 408, THEN do Step 18b.
- b. Verify charging pumps aligned to b. Manually align valves as VCT necessary.
o LCV-112C - OPEN o LCV-112B - CLOSED 19 Equalize Charging And Letdown Flows:
- a. Verify charging pump controllers in manual
- b. Control charging and seal injection flows to equal letdown and seal leakoff flows
F
~4 ( <
k ~ +4 I t C>> kw EOP: T1TLE: REV: 7 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 20 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Plant staff should decide whether to repair PRZR pressure control systems or continue with this procedure. If PRZR pressure control is established, PRZR level should be restored to greater than 5% [30% adverse CNMT] and then further recovery should continue with 37. 25 Check If SI Isolated: ACCUMs Should Be
- a. Check the following: a. Return to Step 12.
o RCS subcooling based on core exit T/Cs - GREATER THAN O' USING FIGURE MIN SUBCOOLING o RVLIS indication - GREATER THAN 68% (73% adverse CNMT]
~ MOV-841, MCC C position 12F ~ MOV-865, MCC D position 12C
- c. Close SI ACCUM discharge valves c. Vent any unisolated ACCUMs:
~ MOV-841 1) Open vent valves for ~ MOV-865 unisolated SI ACCUMs. ~ ACCUM A, AOV-834A ~ ACCUM B, AOV-834B
- 2) Open HCV-945.
- d. Locally reopen breakers for MOV-841 and MOV-865
4 VW t EOP: TITLE: REV! 7 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 21 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Leakage from ruptured S/G into RCS will dilute RCS boron concentration. 26 Verify Adequate Shutdown Margin
- b. Verify boron concentration- b. Borate as necessary.
GREATER THAN REQUIREMENTS OF FIGURE SDM 27 Maintain Required RCP Seal Perform the following: Injection Flow And Labyrinth Seal D/P: o Adjust charging flow to REGEN Hx, HCV-142 as necessary. o Labyrinth seal D/P to each RCP GREATER THAN 15 INCHES OF WATER -OR-o RCP seal injection flow- o Dispatch AO to adjust seal GREATER THAN 6 GPM injection needle valves V-300A and V-300B if necessary. 28 Initiate RCS Cooldown to 350'F In RCS Cold Legs:
- a. Establish and maintain cooldown rate in RCS cold legs - LESS THAN 100'F/HR
- b. Dump steam to condenser from b. Manually or locally dump steam intact S/G using intact S/G ARV.
IF no intact S/G available, THEN use faulted S/G. 4 ~. EOP: TITLE: REV: 7 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 22 of 27 STEP ACTION/EXpECTED RESPONSE RESPONSE NOT OBTAINED
- * * * * * * * * * * * * * * * * * * * * * * * *.* * * * * * * * * * * * * * *
29 Control Charging Flow To Maintain RCS Subcooling:
- a. RCS subcooling based on core a. Increase charging flow to exit T/Cs - GREATER THAN 20'F maintain subcooling greater than USING FIGURE MIN SUBCOOLING 20'F using Figure MIN SUBCOOLING and go to Step 30.
- b. Ruptured S/G narrow range level b. Control charging flow to
- LESS THAN 90% [85% adverse maintain RCS pressur'e at CNMT] ruptured S/G pressure and go to Step 30.
- c. Ruptured S/G narrow range level c. IF ruptured S/G level STABLE OR DECREASING increasing, THEN decrease charging flow to stabilize level. Maintain RCS subcooling greater than 20'F using Figure MIN SUBCOOLING.
30 Check Be If RCS Stopped: Cooldown Should
- a. RCS cold leg temperatures - LESS a. Return to Step 26.
THAN 350'F
THAN 400 PSIG [300 PSIG adverse CNMT] t 4 ~or EOP: TITLE: REV: 7 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 23 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 32 Check Ruptured S/G Narrow Refill ruptured S/G to Range Level GREATER THAN using feed flow. 67'55'dverse CNMT] 174 [254 adverse CNMT] IF either of the following conditions occ'urs, THEN stop feed flow to ruptured S/G: o Ruptured S/G pressure decreases in an uncontrolled manner. -OR-o Ruptured S/G pressure increases to 1020 .psig. eCr ~ g t ' EOP: TITLE: REV: 7 ECA-3-3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 24 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED
CAUTION o STEAM SHOULD NOT BE RELEASED FROM A RUPTURED S/G IF WATER MAY EXIST IN ITS STEAMLINE.. o RUPTURED S/G PRESSURE MAY DECREASE RAPIDLY WHEN STEAM IS RELEASED.
NOTE: The upper head are not running. region may void during RCS depressurization This may result in a rapidly increasing if RCPs PRZR level. 33 Depressurize RCS And Ruptured S/G To 400 PSXG t'300 PSXG adverse CNMT]
- a. Perform the following:
o Decrease charging and increase letdown to initiate backfill -OR- ,o Initiate blowdown from ruptured S/G -OR-o Dump steam from ruptured S/G
- b. Check RCS pressure - LESS THAN b. Return to Step 32.
400 psig [300 psig adverse CNMTj I
- c. Stop RCS depressurization
jY' EOP: TITLE: REV: 7 ECA-3 ' SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 25 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 34 Check Can Be IfEstablished: RHR Normal Cooling
- a. RCS cold leg temperature - LESS a. Return to Step 28.
THAN 350'F
- b. RCS pressure - LESS THAN b. Return to Step 32.
400 psig [300 psig adverse CNMT]
- c. Place RCS overpressure c. IF RCS overpressure protection protection system in service system can NOT be placed in (Refer to 0-7, ALIGNMENT AND service, THEN notify TSC of OPERATION OF. THE REACTOR VESSEL potential Tech Spec violation if OVERPRESSURE PROTECTION SYSTEM) RHR system is placed in service.
NOTE: Leakage from ruptured S/G into RCS will dilute RCS boron concentration. 35 Verify Adequate Shutdown Margin
- b. Verify boron concentration- b. Borate as necessary.
GREATER THAN REQUIREMENTS OF FIGURE SDM w4 EOP: TITLE: REV 7 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 26 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 36 Initiate RCS Cooldown To Cold Shutdown:
- a. Establish and maintain cooldown rate in RCS cold legs - LESS THAN 100'F/HR
- b. Use RHR system if in service
- c. Dump steam to condenser from c. Manually or locally dump steam intact S/G from intact S/G using ARVs.
IF no intact S/G available and RHR system NOT in service, THEN use faulted S/G. 37 Control Charging Flow To Maintain RCS Subcooling:
- a. RCS subcooling based on core a. Increase charging flow to exit: T/Cs - GREATER THAN 20'F maintain subcooling greater than USING FIGURE MIN SUBCOOLING 20'F using Figure MIN SUBCOOLING and go to Step 38.
- b. Ruptured S/G narrow range level b. Control charging flow to
- LESS THAN 90% f85% adverse maintain RCS pressure at CNMT) ruptured S/G pressure and go to .Step 38.
- c. Ruptured S/G narrow range level c. IF ruptured S/G level STABLE OR DECREASING increasing, THEN decrease charging flow to stabilize level. Maintain RCS subcooling greater than 20'F using Figure MIN SUBCOOLING.
%y ga we EOP: TITLE: REV: 7 ECA-3+3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 27 of 27 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 38 Check If RCPs Must Be Stopped:
- a. RCPs - ANY RUNNING a. Go to Step 39.
- b. Check the following: b. Go to Step 39.
o RCP ¹1 seal D/P - LESS THAN 220 PSID -OR-o Check RCP seal leakage - LESS THAN 0.25 GPM
- c. Stop affected RCP(s) 39 Check Core Exit T/Cs LESS Return to Step 35 THAN 200'F
'0 Evaluate Long Term Plant Status:
- a. Maintain cold shutdown conditions
- b. Consult TSC
-END- gj % t EOP: 7IILE: REV: 7 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 1 of 1 ECA-3 . 3 APPENDIX LIST TITLE PAGES
- 1) RED PATH
SUMMARY
- 2) FIGURE MIN SUBCOOLING
- 3) FIGURE SDM
- 4) ATTACHMENT RCP START
- 5) ATTACHMENT N2 PORVS
- 6) ATTACHMENT RUPTURED S/G
- 7) ATTACHMENT D/G STOP
- 8) ATTACHMENT SD-1
- 9) ATTACHMENT SEAL COOLING
- 10) ATTACHMENT SD-2
- 11) ATTACHMENT RHR COOL
- 12) ATTACHMENT AUX BLDG SW
- 13) ATTACHMENT SI FLUSH
- 14) FOLDOUT
EOP: TITLE:
REV: 7 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 1 of 1 RED PATH.
SUMMARY
- a. SUBCRITICALITY Nuclear power greater than 54
- b. CORE COOLING Core exit T/Cs greater than 1200'F
-OR-Core exit T/Cs greater than 700'F AND RVLIS level (no RCPs) less than 434 [46%
adverse CNMT]
I
- c. HEAT SINK Narrow range level in all S/Gs less than 54
[25% adverse CNMT] AND total feedwater flow less than 200 gpm
- d. INTEGRITY Cold leg temperatures decrease greater than 100'F in last 60 minutes AND RCS cold leg temperature less than 285'F
- e. CONTAINMENT CNMT pressure greater than 60 psig
A'~
MC
~ '
'tR
~I l
g
+r
~ s O'J(
l I' 1
~ ~
k L II
~ '
EOP: TITLE:
REV: 7 ECA-3.3 SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 1 of 1 FIGURE MIN SUBCOOLING NOTE: Subcooling Margin = Saturation Temperature From Figure Below [-] Core Exit T/C Indication RC S PRESSURE (PSIG) 2500 2400 2300 RCS PRESSURE INCREHENTS 20 PSIG 2200 2100 2000 1900 1800 1700 1600 1500 SUBCOOLED 1300 REGION 1200 1100 1000 900 800 700 INADE(UATE SUBCOOLING 600 DVERS REGION NH 500 400 300 200 NORMAL CNHT TEHPERATURE INCREHENTS 10'F 100 0
20 0 250 300 350 400 450 500 550 600 650 700 CORE EXIT SATURATION TEHPERATURE ('F)
1 r
4 "1 t~
-
e
~ IC t
~'
H4 I~
lg EOP: TtTLE:
REV: 7 ECA-3 3~ SGTR WITHOUT PRESSURIZER PRESSURE CONTROL r PAGE 1 of 1 FIGURE SDM BORON CONCENTRATION (PPM) 1800 BORON INCREMENTS 20 PPM 1600 1400 ADEQUATE SDH 1200 100 PPH CONSERVATISH INCLUDED 1000 8OD 600 400 TE 200 BURNUP INCREMENTS 100 MWD/HTU 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 CYCLE 22 BURNUP (MWD/HTU)
NOTE: To obtain core burnup, use PPCS turn on code BURNUP.
1 fOP: T!TLE:
REV 7 ECA-3' SGTR WITHOUT PRESSURIZER PRESSURE CONTROL PAGE 1 of 1 FOLDOUT PAGE SI REINITIATION CRITERIA IF EITHER condition listed below occurs, THEN manually operate SI pumps as necessary and go to ECA-3.1, SGTR WITH LOSS OF REACTOR COOLANT SUBCOOLED RECOVERY DESIRED, Step 1:
o RCS subcooling based on core exit TCs LESS THAN O'F USING REQUIREMENTS OF FIGURE MIN SUBCOOLING OR o RVLIS level (no RCPs) LESS THAN 684 [734 adverse CNMT]
- 2. SECONDARY INTEGRITY CRITERIA IF any S/G pressure is decreasing in an uncontrolled manner or is completely depressurized AND has not been isolated, THEN go to E-2, FAULTED S/G ISOLATION, Step 1, unless faulted S/G needed for RCS cooldown.
- 3. COLD LEG RECIRCULATION SWITCHOVER CRITERION IF RWST level decreases to less than 284, THEN go to ES-1.3, TRANSFER TO COLD LEG RECIRCULATION, Step l.
- 4. AFW SUPPLY SWITCHOVER CRITERION IF CST level decreases to less than 5 feet, THEN switch to alternate AFW water supply (Refer to ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS).
l