Rev 9 to EOP AP-CCW.2, Loss of CCW During Power Operation
ML17262A897
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/06/1992
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17262A884 List:
References
AP-CCW.2, NUDOCS 9206160409
Download: ML17262A897 (18)


Text

EOP:

AP-CCW.2 TITLE LOSS OF CCW DURING POWER OPERATION REV:

9 PAGE 1 of 8 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER TECHNICAL REVIEW PORC REVIEW DATE PLANT SUPERINTENDENT EF EC VE DATE CATEGORY 1.0 REVIEWED BY:

9206160409 920605'DR ADOCK 05000244 P

PDR

yJ 4

2 I

li' p

EOP:

AP-CCW.2 TITLE:

LOSS OF CCW DURING POWER OPERATION REV' PAGE 2 of 8 A.

PURPOSE This procedure provides the steps necessary to respond to a loss of CCW while the plant is at power.

B.

ENTRY CONDITIONS/SYMPTOMS 1.

SYMPTOMS The symptoms of LOSS OF CCW DURING POWER OPERATION are; a ~

b.

Annunciator A-13 COMP COOLING SURGE TANK LO LEVEL 41.24, lit, or Annunciator A-22 CCW PUMP DISCHARGE LO PRESS 60 PSI, lit, or c.

Annunciator A-17, MOTOR OFF,

RCP, CCP, lit, or d.

e.

gi h.

Annunciator A-9, RHR PUMP COOLING WATER OUTLET LO FLOW 15 GPM, lit or Annunciator A-6, CONT SPRAY PUMP COOLING WATER OUT LOW FLOW 15 GPM, lit or Annunciator A-14, SAFETY INZ PUMPS COOLING WATER OUT LO FLOW 25 GPM, lit or Annunciator A-7 (A-15),

RCP lA (1B)

CCW RETURN HI TEMP OR LO FLOW 165 GPM 125'F, lit or Annunciator A-24 (A-32),

RCP lA (1B) OIL LEVEL +'.25, lit.

C 4

EOP:

AP-CCW.2 TITLE:

LOSS OF CCW DURING POWER OPERATION REV 9

PAGE 3 of 8 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED CAUTION IF CCW FLOW TO A RCP IS INTERRUPTED FOR GREATER THAN 2 MINUTES OR IF EITHER RCP MOTOR BEARING TEMPERATURE EXCEEDS 200'F, THEN CCW SHOULD BE CONSIDERED LOST TO THAT RCP, REFER TO STEP 3.

1 Check CCW Pump Status:

o Annunciator A-17, Motor Off RCP CCP

- EXTINGUISHED o

Both CCW pump breaker white disagreement lights EXTINGUISHED Perform the following:

a. Verify auto start of standby CCW pump or start manually.
b. IF Annunciator A-22, CCW pump discharge lo press 60 psi LIT, THEN check closed CCW to RHR HXs (MOV-738A and MOV-738B).

EOP:

AP-CCW.2 TITLE LOSS OF CCW DURING POWER OPERATION REV:

9 PAGE 4 of 8 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED NOTE:

CCW surge tank level should be verified locally in the Aux Bldg, if possible.

2 Verify CCW Surge Tank Level Normal:

a.

CCW surge tank level APPROXIMATELY 50%

AND STABLE a.

Open RMW to CCW surge tank (MOV-823) and start a

RMW pump and perform the following:

IF surge tank level is stable or increasing, THEN go to Step 3.

IF surge tank level can NOT be maintained greater than 10%,

THEN 0

1) Trip the Rx.
2) Trip the RCPs.
3) Place both CCW pumps in pull stop.

4)

Go to E-O, REACTOR TRIP or SAFETY INJECTION.

~e

EOP:

AP-CCW.2 TITLE:

LOSS OF CCW DURING POWER OPERATION REV:

9 PAGE 5 of 8 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED CAUTION IF AN RCP(S)

IS TRIPPED DUE TO A LOSS OF CCW, SEAL INJECTION SHOULD BE MAINTAINED TO THE IDLE RCP(S)

UNTIL RCS TEMPERATURE IS LESS THAN 200'F, OR UNTIL CCW IS RESTORED.

3 Check CCW To Both RCPs:

o Annunciator A-7 (A-15),

RCP 1A (1B)

CCW return Hi temp or low flow 165 gpm 125'F alarm-EXTINGUISHED o

RCP motor bearings temperature (PPCS address GD-RCPS OR RCP temperature monitor RK-30A recorder) 5 200'F IF CCW lost to RCP(s),

THEN:

a. Trip the Rx.
b. Trip affected RCP(s).

c.

Go to E-O, REACTOR TRIP or SAFETY INJECTION.

4 Check CCW Valve Alignment NORMAL (Refer to Attachment CONTROL ROOM CCW ALIGNMENT DURING POWER OPERATION)

Align CCW valves as necessary.

M 'E I

Cs

EOP:

AP-CCW.2 LOSS OF CCW DURING POWER OPERATION REV:

9 PAGE 6 of 8 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED NOTE:

o An evaluation must be made to determine if operation may continue while investigating a

CCW leak in containment.

o Operation may continue with the reactor support coolers isolated.

If this occurs, notify higher supervision.

5 Check For CCW Leakage In CNMT:

a.

CNMT sump A levels NOT INCREASING NOTICEABLY

a. IF abnormal increase in CNMT sump level, THEN:

l) Direct HP Tech to sample sump A for chromates.

2) Prepare to make CNMT entry to check for CCW leak.

b.

RCP oil levels NOT INCREASING

b. IF any RCP oil level increasing uncontrollably, THEN:
1) Close CCW to and from affected RCP(s),

(MOVs 749A and 759A for "A" RCP; MOVs 749B and 759B for "B" RCP).

2) Trip Rx.
3) Trip affected RCP(s).

4)

Go to E-O, REACTOR TRIP or SAFETY INJECTION.

l J

I

EOP:

AP-CCW.2 LOSS OF CCW DURING POWER OPERATION REV:

9 PAGE 7 of 8 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 6

Check For CCW Leakage In AUX BLDG:

o Aux Bldg sump pump INCREASED START FREQUENCY

-OR-o Waste holdup tank level UNEXPLAINED INCREASE IF no leakage indicated in AUX

BLDG, THEN:
a. Direct HP Tech to sample CCW Hx SW outlet for chromates, b.

Go to step 10.

-OR-o Aux Bldg - VISUAL LEAKAGE IDENTIFIED 7

Establish - THE SOURCE OF THE CCW LEAKAGE AND ISOLATE 8 Verify CCW Surge Tank Level Normal:

o CCW surge tank level APPROXIMATELY 50%

IF CCW surge tank level NOT approximately 50%,

THEN open RMW to CCW surge tank, MOV-823, and start a

RMW pump to fillCCW surge tank to approximately 50%.

9 Direct HP To Sample For Chromates 10 Verify CONDITIONS PERMIT CONTINUED POWER OPERATION, (Refer to Technical Specification Section 3.3.3).

IF shutdown required, THEN refer to 0-2.1, NORMAL SHUTDOWN TO HOT SHUTDOWN.

i

EOP:

AP-CCW.2 LOSS OF CCW DURING POWER OPERATION REV:

9 PAGE 8 of 8 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED NOTE:

Refer to 0-9.3, NRC STATE AND COUNTIES IMMEDIATE NOTIFICATION, for reporting requirements.

11 Complete NOTIFICATION TO HIGHER SUPERVISION 12 Establish Further Guidance:

a.

Problem or leakage CORRECTED

b. Return to -APPROPRIATE OPERATING PROCEDURE
a. IF problem NOT corrected or leakage NOT found or isolated, THEN return to Step 4.

-END-

EOP:

AP-CCW.2 LOSS OF CCW DURING POWER OPERATION REV:

9 PAGE 1 of 1 ATTACHMENT CONTROL ROOM CCW ALIGNMENT DURING POWER OPERATION o

CCW to RHR Hx A o

CCW to RHR Hx B o

CCW from RCP 1A Thermal Barrier o

CCW from RCP 1B Thermal Barrier o

CCW from Ex Ltdn Hx Isol Vlv o

CCW Surge Tk Vent o

CCW to CNMT Isol Vlv o

CCW to Rx Supp Clrs Isol Vlv o

CCW from Rx Supp Clrs Isol Vlv o

CCW to RCP 1A Isol Vlv o

CCW to RCP 1B Isol Vlv o

CCW from RCP 1A Isol Vlv o

CCW from RCP 1B Isol Vlv o

NRHX Ltdn Outlet Temp (Controller)

MOV-738A Closed MOV-738B Closed AOV-754A Open AOV-754B Open AOV-745 Closed RCV-017 Open MOV-817 Open MOV-813 Open MOV-814 Open MOV-749A Open MOV-749B Open MOV-759A Open MOV-759B Open TCV-130 Auto

t' gfg, \\