Similar Documents at Ginna |
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17250B3061999-10-20020 October 1999 Proposed Tech Specs,Consisting of 1999 Changes to TS Bases ML17265A6941999-06-28028 June 1999 Proposed Tech Specs,Revising ITS Associated with RCS Leakage Detection Instrumentation,As Result of Commitment Submitted as Part of Staff Review of Application of leak-before-break Status to Protions of RHR Piping ML17265A6401999-05-12012 May 1999 Rev 11 to Technical Requirements Manual for Ginna Station. ML17265A6261999-04-18018 April 1999 Rev 10 to Technical Requirements Manual (Trm), for Ginna Station ML17311A0701999-04-14014 April 1999 Rev 10 to AP-PRZR.1, Abnormal Pressurizer Pressure. ML17309A6521999-04-14014 April 1999 Rev 14 to AP-RCS.1, Reactor Coolant Leak. ML17309A6531999-04-13013 April 1999 Rev 1 to FIG-2.0, Figure Sdm. with 990413 Ltr ML17265A6111999-03-26026 March 1999 Rev 9 to Technical Requirements Manual for Ginna Station. ML17265A5911999-03-0101 March 1999 Proposed Tech Specs Change Revising Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6) ML17265A5571999-02-25025 February 1999 Rev 4 to Technical Requirements Manual (Trm). ML17265A5491999-02-12012 February 1999 to EOP FR-H.5, Response to SG Low Level. ML17265A5481999-02-12012 February 1999 to EOP ATT-22.0, Attachment Restoring Feed Flow. ML17265A5461999-02-12012 February 1999 0 to EOP AP-TURB.1, Turbine Trip Without Rx Trip Required. ML17309A6481999-01-25025 January 1999 Revised Ginna Station Emergency Operating Procedures. with 990125 Ltr ML17265A5151999-01-14014 January 1999 Revised Emergency Operating Procedures,Including Rev 14 to AP-SW.1,rev 3 to ATT-5.2,rev 5 to ATT-8.0,rev 1 to ATT-14.6, Rev 17 to E-1,rev 16 to ECA-1.1,rev 26 to ES-1.3,rev 4 to FR-Z.2 & Index ML17265A5081999-01-0808 January 1999 Rev 7 to Technical Requirements Manual, for Ginna Station ML17265A4961998-12-18018 December 1998 Rev 6 to Technical Requirements Manual. ML20198C0361998-12-14014 December 1998 Rev 11 to ECA-0.2, Loss of All AC Power Recovery with SI Required ML20198C0121998-12-14014 December 1998 Rev 10 to AP-RCS.2, Loss of Reactor Coolant Flow ML20198C0581998-12-14014 December 1998 Rev 5 to FR-Z.1, Response to High Containment Pressure ML20198C0411998-12-14014 December 1998 Rev 16 to FR-C.1, Response to Inadequate Core Cooling ML20198C0521998-12-14014 December 1998 Rev 13 to FR-S.1, Response to Reactor Restart/Atws ML17265A4661998-11-24024 November 1998 Proposed Tech Specs 4.2.1,revising Description of Fuel Cladding Matl & Updating List of References Provided in TS 5.6.5 for COLR ML20155G0301998-10-30030 October 1998 Rev 13 to EOP AP-CCW.1, Leakage Into Component Cooling Loop ML17265A4091998-08-24024 August 1998 Rev 13 to AP-SW.1, Svc Water Leak. W/980824 Ltr ML17265A3721998-07-16016 July 1998 Rev 14 to EOP AP-CW.1, Loss of Circ Water Pump. W/980716 Ltr ML17265A3151998-06-0404 June 1998 Proposed Tech Specs Basis Re Main Steam Isolation Setpoint ML17265A2941998-05-21021 May 1998 Tech Specs Consisting of Submittal Changes for 1998 ML17265A2861998-05-0606 May 1998 Rev 19 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant Saturated Recovery Desired & Updated ECA Index.W/980506 Ltr ML17265A2461998-04-27027 April 1998 Proposed Tech Specs Revising Requirements Associated W/Sfp to Reflect Planned Mod to Storage Racks & Temporarily Addressing Boraflex Degradation within Pool ML17265A1821998-02-20020 February 1998 Rev 1 to EWR 5111, MOV Qualification Program Plan, Calculation Assumption Verification Criteria. ML17265A1491997-12-31031 December 1997 Rev 1 to Inservice Testing Program. ML17264B0731997-10-14014 October 1997 Rev 4 to Technical Requirements Manual (TRM) for Ginna Station. ML17264B0671997-10-0808 October 1997 Proposed Tech Specs,Correcting & Clarifying Info Re RCS Pressure & Temp Limits Rept Administrative Controls Requirements ML17264B0441997-09-29029 September 1997 Proposed Tech Specs Revising Adminstrative Controls W/ Respect to Reactor Coolant Sys Pressure & Temp Limits Rept ML17264B0391997-09-29029 September 1997 Proposed Tech Specs Revising Allowable Value & Trip Setpoint for High Steam Flow Input Into LCO Table 3.3.2-1,Function 4d (Main Steam Isolation) to Address Issues Identified in Rev Revised Setpoint Analysis Study ML17265A1541997-09-16016 September 1997 Rev 1 to DA EE-92-089-21, Design Analysis Ginna Station Instrument Loop Performance Evaluation & Setpoint Verification. ML17264B0031997-08-19019 August 1997 Proposed Tech Specs Allowing Testing of Three ECCS motor- Operated Valves in Mode 4 Which Currently Requires Entry Into LCO 3.0.3 ML17264A9991997-08-19019 August 1997 Proposed Tech Specs Correcting Specified Accumulator Borated Water Volume Values in SR 3.5.1.2 to Match Associated Accumulator Percent Level Values ML17264A9791997-08-0505 August 1997 Rev 7 to AP-RCS.3, High Reactor Coolant Activity. ML17264A9781997-08-0505 August 1997 Rev 12 to AP-RCS.1, Reactor Coolant Leak. ML17264A9771997-08-0505 August 1997 Rev 11 to AP-RCP.1, RCP Seal Malfunction. ML17264A9751997-08-0505 August 1997 Rev 14 to AP-ELEC.1, Loss of 12A & 12B Busses. ML17264A9851997-08-0404 August 1997 Rev 2 to Summary Description of Compliance w/10CFR73 Amend Protection Against Malevolent Use of Vehicles at Nuclear Power Plants. ML17264A9391997-07-0707 July 1997 Rev 3 to Technical Requirements Manual for Ginna Station, Inserting New Tabs Accordingly Per Previous Transmittal for Rev ML17264A9341997-07-0101 July 1997 to Technical Requirements Manual (TRM) & inter-office Correspondence Dtd 970624 ML17264A9461997-06-20020 June 1997 to Inservice Insp (ISI) Program. ML17264A9241997-06-0303 June 1997 Proposed Tech Specs Clarifying Issues Re Low Temperature Overpressure Protection ML17311A0471997-05-22022 May 1997 Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr ML17264A8671997-04-24024 April 1997 Proposed Tech Specs,Revising Rcs,Pt & Administrative Control Requirements 1999-06-28
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML17265A6401999-05-12012 May 1999 Rev 11 to Technical Requirements Manual for Ginna Station. ML17265A6261999-04-18018 April 1999 Rev 10 to Technical Requirements Manual (Trm), for Ginna Station ML17309A6521999-04-14014 April 1999 Rev 14 to AP-RCS.1, Reactor Coolant Leak. ML17311A0701999-04-14014 April 1999 Rev 10 to AP-PRZR.1, Abnormal Pressurizer Pressure. ML17309A6531999-04-13013 April 1999 Rev 1 to FIG-2.0, Figure Sdm. with 990413 Ltr ML17265A6111999-03-26026 March 1999 Rev 9 to Technical Requirements Manual for Ginna Station. ML17265A5571999-02-25025 February 1999 Rev 4 to Technical Requirements Manual (Trm). ML17265A5481999-02-12012 February 1999 to EOP ATT-22.0, Attachment Restoring Feed Flow. ML17265A5491999-02-12012 February 1999 to EOP FR-H.5, Response to SG Low Level. ML17265A5461999-02-12012 February 1999 0 to EOP AP-TURB.1, Turbine Trip Without Rx Trip Required. ML17309A6481999-01-25025 January 1999 Revised Ginna Station Emergency Operating Procedures. with 990125 Ltr ML17265A5151999-01-14014 January 1999 Revised Emergency Operating Procedures,Including Rev 14 to AP-SW.1,rev 3 to ATT-5.2,rev 5 to ATT-8.0,rev 1 to ATT-14.6, Rev 17 to E-1,rev 16 to ECA-1.1,rev 26 to ES-1.3,rev 4 to FR-Z.2 & Index ML17265A5081999-01-0808 January 1999 Rev 7 to Technical Requirements Manual, for Ginna Station ML17265A4961998-12-18018 December 1998 Rev 6 to Technical Requirements Manual. ML20198C0581998-12-14014 December 1998 Rev 5 to FR-Z.1, Response to High Containment Pressure ML20198C0361998-12-14014 December 1998 Rev 11 to ECA-0.2, Loss of All AC Power Recovery with SI Required ML20198C0521998-12-14014 December 1998 Rev 13 to FR-S.1, Response to Reactor Restart/Atws ML20198C0411998-12-14014 December 1998 Rev 16 to FR-C.1, Response to Inadequate Core Cooling ML20198C0121998-12-14014 December 1998 Rev 10 to AP-RCS.2, Loss of Reactor Coolant Flow ML20155G0301998-10-30030 October 1998 Rev 13 to EOP AP-CCW.1, Leakage Into Component Cooling Loop ML17265A4091998-08-24024 August 1998 Rev 13 to AP-SW.1, Svc Water Leak. W/980824 Ltr ML17265A3721998-07-16016 July 1998 Rev 14 to EOP AP-CW.1, Loss of Circ Water Pump. W/980716 Ltr ML17265A2861998-05-0606 May 1998 Rev 19 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant Saturated Recovery Desired & Updated ECA Index.W/980506 Ltr ML17265A1821998-02-20020 February 1998 Rev 1 to EWR 5111, MOV Qualification Program Plan, Calculation Assumption Verification Criteria. ML17265A1491997-12-31031 December 1997 Rev 1 to Inservice Testing Program. ML17264B0731997-10-14014 October 1997 Rev 4 to Technical Requirements Manual (TRM) for Ginna Station. ML17265A1541997-09-16016 September 1997 Rev 1 to DA EE-92-089-21, Design Analysis Ginna Station Instrument Loop Performance Evaluation & Setpoint Verification. ML17264A9751997-08-0505 August 1997 Rev 14 to AP-ELEC.1, Loss of 12A & 12B Busses. ML17264A9771997-08-0505 August 1997 Rev 11 to AP-RCP.1, RCP Seal Malfunction. ML17264A9791997-08-0505 August 1997 Rev 7 to AP-RCS.3, High Reactor Coolant Activity. ML17264A9781997-08-0505 August 1997 Rev 12 to AP-RCS.1, Reactor Coolant Leak. ML17264A9851997-08-0404 August 1997 Rev 2 to Summary Description of Compliance w/10CFR73 Amend Protection Against Malevolent Use of Vehicles at Nuclear Power Plants. ML17264A9391997-07-0707 July 1997 Rev 3 to Technical Requirements Manual for Ginna Station, Inserting New Tabs Accordingly Per Previous Transmittal for Rev ML17264A9341997-07-0101 July 1997 to Technical Requirements Manual (TRM) & inter-office Correspondence Dtd 970624 ML17264A9461997-06-20020 June 1997 to Inservice Insp (ISI) Program. ML17311A0471997-05-22022 May 1997 Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr ML20140B8291997-03-24024 March 1997 Rev 3 to EOP ATT-12.0, Attachment N2 Porvs ML17264A8221997-02-0606 February 1997 Rev 15 to FR-P.1, Response to Imminent Pressurized Thermal Shock Condition. ML17264A8201997-02-0606 February 1997 Rev 7 to AP-RCC.2, Rcc/Rpi Malfunction. ML17264A8081997-01-23023 January 1997 Revised Emergency Operating Procedures,Including Rev 14 to E-1,Rev 19 to E-3,Rev 14 to ECA-2.1,Rev ECA-3.3,Rev 20 to ES-1.3,Rev 13 to FR-C.1,Rev 12 to FR-C.2 & Rev 14 to FR-P.1 ML20133N3351997-01-10010 January 1997 Rev 7 to FR-C.3, Response to Saturated Core Cooling ML17264A8881996-10-10010 October 1996 Rev 9 to ODCM for Ginna Station. ML20128N0681996-10-0303 October 1996 Revised Emergency Operating Procedures,Including Rev 5 to Att-10.0, Attachment Faulted S/G & Rev 6 to Att-16.0, Attachment Ruptured S/G ML17264A5311996-05-31031 May 1996 Revised Emergency Operating Procedures,Including Rev 10 to AP-RCP.1,Rev 12 to ECA-0.1,Rev 12 to ECA-2.1,Rev 3 to FR-H.2,Rev 3 to FR-H.4,Rev 7 to FR-I.1,Rev 12 to FR-P.1,Rev 10 to FR-S-1 & Rev 6 to FR-S.2 ML17264A5161996-05-22022 May 1996 Rev 2 to Technical Requirements Manual (TRM) ML17264A4581996-04-0808 April 1996 Rev 7 to ODCM for Ginna Station. ML17264A4371996-04-0101 April 1996 Rev 1 to Technical Requirements Manual (TRM) ML17264A4391996-04-0101 April 1996 Rev 1 to Updated Technical Requirements Manual (TRM) ML17264A4191996-02-24024 February 1996 Rev 0 to Technical Requirements Manual (Trm). ML17264A6901996-02-23023 February 1996 Rev 0 to Inservice Testing Program. 1999-05-12
[Table view] |
Text
I ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER PROCEDURE NO. PT-2.3.1M REV. NO. 3 POST ACCIDENT CHARCOAL FILTER DAMPERS - MONTHLY TECHNICAL REVIEW PORC REVIEW DATE (0 PLANT SUPERINTENDENT u-F-EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:
GINNA STATlON THIS PROCEDURE CONTAINS 6 PAGES START:
DATE TlME COMPLETED:
DATE TlME:
9510260339 951018 PDR ADOCK 05000244
. P.
PDR
PT-2.3.1M:1 PT-2.3 1M POST ACCIDENT CHARCOAL FILTER DAMPERS MONTHLY 1.0 PURPOSE To provide instructions for verifying operability of the dampers associated with the Containment Recirc-ulation Fan charcoal filter flow paths.
1.2 To provide instructions for performing the monthly inspection of the Containment Recirculation Units.
2.0 TEST RE UIREMIBFZS:
2.1 To exercise each damper through a complete stroking cycle.
2.2 To operate each Post Accident Charcoal Filter Unit in the Recirc Mode for at least fifteen minutes.
2.3 To inspect each Containment Recirculation Unit for signs of water within the filtration area.
2.4 To inspect each Containment Recirculation Unit Demister Unit for combustibility.
2.5 To verify operability and proper orientation and flow in the accident mode.
3.0 REFERENCES
3.1 33013-1863, Containment HVAC Systems.
3.2 Tech. Specs. Section 4.5.2.3.5.
3.3 S-23.5, Post Accident Charcoal Filter Operation.
3.4 ANSI N510-1989 [Applies only to Demister (Moisture Separators) Unit Combustibility visual inspections]
Section 5.5.1.6.
4.0 INITIAL CONDITIONS:
4.1 Damper surveillance may be performed during any plant operating mode.
PT-2.3.1M:2 4.2 Notify Shift Supervisor at start of test.
4.3 Notify Head Control Operator at start of test.
Any abnormality or erratic damper action observed during performance of procedure shall be noted. A Work Request/Trouble Report shall be submitted for the concerned damper.
4.5 Test personnel are qualified in accordance with A-1102.
4.6 A Health Physics Work Permit has been issued by HP Department, to permit Containment entry and/or Recirculation Unit inspection.
4.7 If this procedure is being performed as an unscheduled test or following maintenance, initial those sections being completed and mark the remainder N/A.
4.8 Notify Q.C. Dept. at start of test.
4.9 Prior to start of testing, notify Diagnostic Testing Group that required equipment monitoring associated with the CNMT Recirculation Fans shall be performed.
5 0
~ PRECAUTIONS:
5.1 Only one group of Containment Recirc dampers shall be tested at a time.
5.2 Observe all requirements of the Health Physics Work Permit for Containment entry.
5.3 The Shift Supervisor shall be notified immediately if any acceptance criteria is not met or any malfunction or abnormal conditions occur.
6.0 INSTRUCTIONS.
6.1 1A Recirculation Fan Dam ers 6.1.1 Verify or place the 1A Containment Recirc Fan in service.
PT-2.3.1M:3 6.1.2 Visually verify the following damper positions:
6.1.2.1 1F-LED (5873), Loop Entry Damper OPEN 6.1.2.2 1I-CID (5871), Charcoal Unit Inlet CLOSED 6.1.2.3 1K-COD (5872), Charcoal Unit Outlet CLOSED 6.1.3 At the MCB, verify the Green indicating light, "CHARCOAL FILTER 1A DAMPERS CLOSED" is ON.
NOTE: CF1A/L is a latch in relay, located in Relay Room, Rack RA2 Front 6.1.4 Press in CF1A/L relay armature button.
6.1.5 Visually verify the following damper positions:
6.1.5.1 1F-LED (5873), Loop Entry Damper CLOSED 6.1.5.2 1I-CID (5871), Charcoal Unit Inlet OPEN 6.1.5.3 1K-COD (5872), Charcoal Unit Outlet OPEN 6.1.6 At the MCB, verify the- Green indicating light, "CHARCOAL FILTER 1A DAMPERS CLOSED" is OFF.
6.1.7 Record time dampers switched to Recirc Mode.
hr.
NOTE: Fan must operate in Recirc Mode for at least fifteen minutes to satisfy Tech Spec requirements.
6.1.8 After at least fifteen minutes of Recirc Mode operation, press CFlA/L relay RESET button.
6.1.9 Visually verify the following damper positions:
6.1.9.1 1F-LED (5873), Loop Entry Damper OPEN 6.1.9.2 1I-CID (5871), Charcoal Unit Inlet CLOSED 6.1.9.3 1K-COD (5872), Charcoal Unit Outlet CLOSED 6.1.10 At the MCB, verify the Green indicating light.
"CHARCOAL FILTER 1A DAMPERS CLOSED" is ON.
PT-2.3.1M:4 6.1.11 Record time dampers switched to Normal Mode.
hr.
6.1.12 Record Post Accident Filter run time in S-23.5 located on back of MCB.
6.2 1C Recirculation Fan Dam ers 6.2.1 Verify or place the 1C Containment Recirc Fan in service.
6.2.2 Visually verify the following damper positions:
6.2.2.1 1H-LED (5875), Loop Entry Damper OPEN 6.2.2.2 1J-CID (5876), Charcoal Unit Inlet CLOSED 6.2.2.3 1L-COD (5874), Charcoal Unit Outlet CLOSED 6.2.3 At the MCB, verify the Green indicating light, "CHARCOAL FILTER 1C DAMPERS CLOSED" is ON.
NOTE: CF1C/L is a latch in relay, located in Relay Room, Rack RA3 Front 6.2.4 Press in CF1C/L relay armature button.
6.2.5 Visually verify the following damper positions:
6.2.5.1 1H-LED (5875), Loop Entry Damper CLOSED 6.2.5.2 1J-CID (5876), Charcoal Unit Inlet OPEN 6.2.5.3 1L-COD (5874), Charcoal Unit Outlet OPEN
'6.2.6 At the MCB, verify the Green indicating light, "CHARCOAL FILTER 1C DAMPERS CLOSED" is OFF.
6.2.7 Record time dampers switched to Recirc Mode.
hr.
NOTE: Fan must operate in Recirc Mode for at least fifteen minutes to satisfy Tech Spec requirements.
6.2,8 After at least fifteen minutes of Recirc Mode operation, press CF1C/L relay RESET button.
PT-2.3.1M:5 6.2.9 Visually verify the following damper positions:
6.2.9.1 1H-LED (5875), Loop Entry Damper OPEN 6.2.9.2 1J-CID (5876), Charcoal Unit Inlet CLOSED 6.2.9.3 1L-COD (5874),, Charcoal Unit Outlet CLOSED 6.2.10 At the MCB, verify the Green indicating light, "CHARCOAL FILTER 1C DAMPERS CLOSED" is ON.
6.2.11 Record time dampers switched to Normal Mode.
hr.
6.2.12 Record Post Accident Filter run time in S-23.5 located on back of MCB.
6.3 Monthl Xns ection of Containment Recirc Units 6.3.1 Xnspect each of the following as per Attachment 1, Containment Recirc Unit Monthly Xnspection Check List.
6.3.1.1 Recirc Unit A 6.3.1.2 Recirc Unit B 6.3.1.3 Recirc Unit C 6.3.1.4 Recirc Unit D COMMENTS:
COMPLETED BY:
DATE COMPLETED:
HEAD CONTROL OPERATOR:
SHIFT SUPERVISOR:
RESULTS 2 TEST REVIEW: DATE
PT-2.3.1M:6 ATTACHMENT 1 Containment Recirc Unit Monthl Ins ection Check List Unit D
- 1. Ensure Recirc Fan Unit is not in operation.
- 2. Ensure each drain free of foreign material.
- 3. Inspect fan chiller piping area for possible service water leaks.
- 4. Inspect HEPT filter section for evidence of water
~
about floor area and any water damage to HEPA filter units.
a)
- 5. Inspect Demister Unit for combustibility utilizing the following criteria:
a) No visual evidence of b) dirt or debris loading.
b) No visual evidence of oil or foreign materials susceptible to combustion.
- 6. Request start of fan unit and record HEPA Filter Delta P on Magnehelic (must be less than 3" H20)
- 7. Remove fan units from service which are not needed at this time.
- 8. Submit a Work Request/Trouble noted.
Report if any discrepancies are COMPLETED BY:
DATE COMPLETED: