ML17328A248

From kanterella
Revision as of 06:09, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Spec Sections 2.I & 2.H Re Iodine Monitoring in Support of Extension of Expiration Dates of Licenses
ML17328A248
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/27/1989
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17328A247 List:
References
NUDOCS 9001050237
Download: ML17328A248 (4)


Text

ATTACHMENT 2 TO AEP:NRC:0930 PROPOSED REVISED LICENSE PAGES 9001050237 85'1227 PDR ADOCK 05000315 P PDC

Docket No. 315 Page 6 of 6

  • 2.I Iodine Monitorin Amendment The licensee shall implement a program which will ensure No. 49 the capability to accurately determine the airborne concentration in vital areas under accident conditions.

This program shall include the following:

1. Training of personnel,
2. Procedures for monitoring, and
3. Provisions for maintenance of sampling and analysis equipment.

Amendment 2.J In all places of this license, the reference to the No. Indiana and Michigan Electric Company is amended to read "Indiana Michigan Power Company."

3. This amended license is effective as of the date of issuance and shall expire October 25, 2014.
  • Amendment No. 70 superseded the following Amendments for numbering: Nos. 33, 45 and 49.

FOR THE NUCLEAR REGULATORY COMMISSION Roger S. Boyd, Director Division of Project Management Office of Nuclear Reactor Regulation

Enclosure:

Appendix A - Thchnical Specifications Date of Issuance:, March 30, 1976

~ I Docket No, 316 Page 8 of 11 H. Iodine Monitorin Amendment No. 34 The licensee sha 11 implement a program which will ensure the capability to accurately determine the airborne iodine concentration in vital areas under accident conditions.

This program shall include the following:

1. Training of personnel,
2. Procedures for monitoring, and
3. Provisions for maintenance of sampling and analysis equipment.

I, In all places of this license, the reference to the Indiana Amendment and Michigan Power Company is deleted and all references to No. 29 "the licensees" is amended to read "the licensee." The intent is to recognize the Indiana and Michigan Electric Company as the sole licensee of the Donald C. Cook Nuclear Plant.

J. In all places of this license, the reference to the Indiana Amendment and Michigan Electric Company is amended to read "Indiana No. 98 Michigan Power Company."

K. STEAM GENERATOR REPAIR PROGRAM Amendment No. 100 (1) The licensee is authorized to repair Unit 2 steam generators by replacement of major components. Repairs shall be conducted in accordance with the licensee's commitments identified in the Commission approved Donald C. Cook Nuclear Plant Unit No. 2 Steam Genera sr Repair Report dated November 7, 1986, as revised through Revision 6, and additional commitments identified in the staff's related Safety Evaluation dated March 8, 1988.

(2) The Technical Specifications identified in Table 3.2-2 of the Steam Generator Repair Report dated November 7, 1986, as revised through Revision 6 dated February 18, 1988, will not be applicable during the repair program.

For purposes of Technical Specification applicability, the Steam Generator Repair Project will begin when the last fuel assembly from the Unit 2 core is placed in the spent fuel pool and will end when the first fuel assembly is removed from the spent fuel pool to refuel the Unit 2 coze.

Amendment 3. This license is effective as of the date of issuance and No. shall expire at midnight, December 25, 2017.

~ Amendment 29 - Changed G to H, H to I, and added a new G; Amendment 34 - Changed H to 3, added a new H and K; Amendment 52

- Deleted G, Changed H to G, and K to H; Amendment 14 added H.