Similar Documents at Cook |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML17335A5581999-10-12012 October 1999 Proposed Tech Specs Surveilllance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5611999-10-11011 October 1999 Proposed Tech Specs Pages,Correcting TS Pages Inadvertently Submitted in 990923 Submittal ML17335A5431999-10-0101 October 1999 Proposed Tech Specs Re Containment Recirculation Sump Water Inventory ML17326A1591999-09-23023 September 1999 Proposed Tech Specs Re Movement of SG Sections in Auxiliary Bldg for SG Replacement Project ML17326A1461999-09-17017 September 1999 Proposed Tech Specs Pages for Credit of Rod Cluster Control Assemblies for Cold Leg LBLOCA Subcriticality ML17326A1181999-09-10010 September 1999 Proposed Tech Specs Pages,Revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0941999-08-17017 August 1999 Proposed Tech Specs,Removing voltage-based Repair Criteria, F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarifying Bases Section ML17325B6061999-05-21021 May 1999 Proposed Tech Specs Revising Limitations on Positive Reactivity Additions ML17325B5551999-04-19019 April 1999 Proposed Tech Specs 3/4.8.1.2, Electrical Power Systems & Associated Bases,Providing one-time Extension of 18-month Surveillance Interval for Specific SRs ML17335A3681998-12-0303 December 1998 Proposed Tech Specs,Adding New TS Re Distributed Ignition Sys ML17335A3581998-12-0303 December 1998 Proposed Tech Specs 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases,Reflecting Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A3621998-12-0303 December 1998 Proposed Tech Specs Removing Obsolete Info to Provide Consistency Between Units 1 & 2 to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17335A3651998-12-0303 December 1998 Proposed Tech Specs 3/4.7.7, Sealed Source Contamination & Associated Bases Addressing Revised Testing Requirements for Fission Detectors ML17335A2651998-10-0808 October 1998 Proposed Tech Specs Changing Containment Sys TS Bases 3/4.6.1.4, Internal Pressure & 3/4.6.1.5, Air Temp. ML17335A2691998-10-0808 October 1998 Proposed Tech Specs 3.4.1.3 Re Reactor Coolant Loop Requirements in Modes 4 & 5 ML17335A2781998-10-0808 October 1998 Proposed Tech Specs Sections 3.3.3.8 & 3.3.3.6,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2341998-09-14014 September 1998 Proposed Tech Specs Page 3/4 5-6,revising Runout Limits for SI Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A1931998-08-28028 August 1998 Proposed Tech Specs Requesting Extension of SG Surveillance TS 4.4.5.3,which TSs Require to Be Performed on 990408,until End of Current Fuel Cycle Currently Scheduled for Mar 2000 ML17334B7031998-03-0303 March 1998 Proposed Tech Specs Pages,Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Unit 1 & 2 TS 3/4.6.4 Bases ML20212A7051997-10-21021 October 1997 Proposed Tech Specs 3/4.6.5 Re Ice Weight & Surveillance Requirement ML17333B0751997-10-0808 October 1997 Proposed Tech Specs 3/4.6.5 & 3/4.5.5 Re Ice Weight & SR ML17333B0451997-09-19019 September 1997 Proposed Tech Specs,Deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9851997-08-11011 August 1997 Proposed Tech Specs,Allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17333A9891997-08-11011 August 1997 Proposed Tech Specs,Reflecting Changes for Moderator Temp Coefficient Measurement in Response to RAI ML17335A2121997-08-0101 August 1997 Proposed Tech Specs 4.7.1.2.g Deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig. ML17333A8261997-03-26026 March 1997 Proposed Tech Specs Removing Administrative Controls Related to Quality Assurance Requirements IAW Guidance of Administrative Ltr 95-06 ML17333A8301997-03-26026 March 1997 Proposed Tech Specs Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8331997-03-26026 March 1997 Proposed Tech Specs Involving Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted in Prior Amend ML20135C3781997-02-24024 February 1997 Revised Proposed Tech Specs Page Re 3/4, Limiting Condition for Operation & Surveillance Requirements ML17333A7161996-12-20020 December 1996 Proposed Tech Specs Change to Allow for Repair of Hybrid Sleeved SG Tubes in Response to RAI ML17333A7151996-12-20020 December 1996 Proposed Tech Specs 3/4.4.10 Re Reactor Coolant Sys ML17333A5161996-07-22022 July 1996 Proposed Tech Specs,Informing Operations Superintendent Will Have to Hold SRO License,Have Held Senior Operator License or Been Certified to Have Senior Operator Knowledge ML17334B5951996-07-11011 July 1996 Proposed Tech Specs,Supporting Operation of Facility at Increased Core Rated Thermal Power of 3,588 Mwt ML17333A4771996-06-19019 June 1996 Proposed Tech Specs Re Voltage Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking,Per GL 95-05 ML17333A4651996-06-11011 June 1996 Proposed Tech Specs Re Administrative Controls Related to QA ML17333A4221996-04-0808 April 1996 Revised Proposed Ts,Moving TS 4.0.4 Exemption Statement for MSSVs Into Section 4.7.1.1 ML17333A3571996-03-12012 March 1996 Proposed Tech Specs,Removing TSs Re Shutdown & Control Rod Position Indication While in Modes 3,4 & 5 ML17333A3301996-02-29029 February 1996 Proposed Tech Specs Re Boric Acid Storage Sys Boron Concentration ML17333A3231996-02-26026 February 1996 Proposed TS 5.6.2 Re Increase in Max Nominal Fuel Assembly Enrichment Limit,Taking Credit for Use of Integral Fuel Burnable Absorber Matl ML17333A3221996-02-22022 February 1996 Proposed Tech Specs,Proposing to Remove Requirement That Operations Superintendent Must Hold or Have Held Sol at Plant or Similar Reactor ML17333A3171996-02-22022 February 1996 Proposed Tech Specs,Modifying Table 4.8-1,DG Test Schedule by Ref Rg 1.9,Rev 3 Rather than Rg 1.108,Rev 1 Criteria for Determination of Valid DG Test ML17333A3121996-02-16016 February 1996 Proposed Tech Specs Section 3.6.1.6,removing Words Structure & Steel Liner to Be Consistent W/Unit 2 Containment Sys Wording ML17333A2671996-01-12012 January 1996 Proposed Tech Specs,Modifying TS Section 4.4.11 to Eliminate SR Demonstrating Operability of Emergency Power Supply for Pressurizer PORVs & Block Valves ML17333A2411995-12-19019 December 1995 Proposed Tech Specs 3/4.6.1.2,3/4.6.1.3,3/4.6/1/6 & 3/4.6.1.7,replacing Option a Scheduling Requirements for Types A,B & C Tests (Overall Integrated & Local Containment Leakage Rate) W/Requirement Per 10CFR50 App J Option B ML17332B0131995-11-10010 November 1995 Proposed Tech Specs Modifying Surveillance Testing of EDG During Refueling & Normal Operations ML17332A9991995-10-20020 October 1995 Proposed Tech Specs Adding Exemption to TS 4.0.4 in SR for MSIV ML17332A9151995-08-0808 August 1995 Proposed Tech Specs Re Deletion of Component Cyclic or Transient Limit Table ML17332A8751995-08-0404 August 1995 Proposed Tech Specs for Repair of Hybrid Expansion Joint Sleeved SG Tubes ML17332A8291995-06-30030 June 1995 Proposed Tech Specs Re Fuel Reconstitution,Per GL 90-02 ML17332A8111995-06-20020 June 1995 Proposed Tech Specs Removing Fire Protection Systems from Licenses 1999-09-23
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17335A5581999-10-12012 October 1999 Proposed Tech Specs Surveilllance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5611999-10-11011 October 1999 Proposed Tech Specs Pages,Correcting TS Pages Inadvertently Submitted in 990923 Submittal ML17335A5431999-10-0101 October 1999 Proposed Tech Specs Re Containment Recirculation Sump Water Inventory ML17326A1591999-09-23023 September 1999 Proposed Tech Specs Re Movement of SG Sections in Auxiliary Bldg for SG Replacement Project ML17326A1461999-09-17017 September 1999 Proposed Tech Specs Pages for Credit of Rod Cluster Control Assemblies for Cold Leg LBLOCA Subcriticality ML17326A1181999-09-10010 September 1999 Proposed Tech Specs Pages,Revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0941999-08-17017 August 1999 Proposed Tech Specs,Removing voltage-based Repair Criteria, F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarifying Bases Section ML17326A1471999-05-28028 May 1999 Non-proprietary Version of Control Rod Insertion Following Cold Leg LBLOCA at DC Cook,Units 1 & 2. ML17325B6061999-05-21021 May 1999 Proposed Tech Specs Revising Limitations on Positive Reactivity Additions ML17325B5891999-05-0707 May 1999 Rev 5 to PMP 7200.RST.004, Expanded Sys Readiness Review Program. ML17325B5901999-05-0707 May 1999 Rev 1 to PMP 7200.RST.006, Expanded Sys Readiness Review Program for Level 2 Sys. ML17325B5551999-04-19019 April 1999 Proposed Tech Specs 3/4.8.1.2, Electrical Power Systems & Associated Bases,Providing one-time Extension of 18-month Surveillance Interval for Specific SRs ML17325B4671999-03-0303 March 1999 Rev 5 to Cook Nuclear Plant Restart Plan. ML17335A3581998-12-0303 December 1998 Proposed Tech Specs 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases,Reflecting Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A3681998-12-0303 December 1998 Proposed Tech Specs,Adding New TS Re Distributed Ignition Sys ML17335A3651998-12-0303 December 1998 Proposed Tech Specs 3/4.7.7, Sealed Source Contamination & Associated Bases Addressing Revised Testing Requirements for Fission Detectors ML17335A3621998-12-0303 December 1998 Proposed Tech Specs Removing Obsolete Info to Provide Consistency Between Units 1 & 2 to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17325B4431998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. with 981216 Ltr ML17335A4071998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. ML17335A2781998-10-0808 October 1998 Proposed Tech Specs Sections 3.3.3.8 & 3.3.3.6,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2691998-10-0808 October 1998 Proposed Tech Specs 3.4.1.3 Re Reactor Coolant Loop Requirements in Modes 4 & 5 ML17335A2651998-10-0808 October 1998 Proposed Tech Specs Changing Containment Sys TS Bases 3/4.6.1.4, Internal Pressure & 3/4.6.1.5, Air Temp. ML17335A2341998-09-14014 September 1998 Proposed Tech Specs Page 3/4 5-6,revising Runout Limits for SI Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A2301998-09-12012 September 1998 Rev 3 to Cook Nuclear Plant Restart Plan. ML17335A2721998-09-0404 September 1998 Rev 0 to PL-CNSI-98-007, Transportation & Emergency Response Plan for DC Cook Unit 2 SG Project. ML17335A2751998-09-0202 September 1998 Rev 1 to ER-98-012, Evaluation of Dose Rate from U-Tube End of DC Cook SG Lower Assembly. ML17335A1931998-08-28028 August 1998 Proposed Tech Specs Requesting Extension of SG Surveillance TS 4.4.5.3,which TSs Require to Be Performed on 990408,until End of Current Fuel Cycle Currently Scheduled for Mar 2000 ML17335A2731998-08-21021 August 1998 Rev 0 to ST-307, Structural Evaluation of DC Cook Unit 2 Sgla Package. ML17334A7301998-05-0606 May 1998 Rev 2 of Cook Nuclear Plant Restart Plan. ML17325B5271998-04-0707 April 1998 Rev 1 to Cook Nuclear Plant Restart Plan. ML17334B8041998-04-0303 April 1998 Rev 1 to Valve IST Program for DCP Third 10-Yr Interval. ML17325B5261998-03-0707 March 1998 Rev 0 to Cook Nuclear Plant Restart Plan. ML17334B7031998-03-0303 March 1998 Proposed Tech Specs Pages,Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Unit 1 & 2 TS 3/4.6.4 Bases ML20212A7051997-10-21021 October 1997 Proposed Tech Specs 3/4.6.5 Re Ice Weight & Surveillance Requirement ML17333B0751997-10-0808 October 1997 Proposed Tech Specs 3/4.6.5 & 3/4.5.5 Re Ice Weight & SR ML17333B0451997-09-19019 September 1997 Proposed Tech Specs,Deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9891997-08-11011 August 1997 Proposed Tech Specs,Reflecting Changes for Moderator Temp Coefficient Measurement in Response to RAI ML17333A9851997-08-11011 August 1997 Proposed Tech Specs,Allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17335A2121997-08-0101 August 1997 Proposed Tech Specs 4.7.1.2.g Deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig. ML17333A8301997-03-26026 March 1997 Proposed Tech Specs Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8331997-03-26026 March 1997 Proposed Tech Specs Involving Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted in Prior Amend ML17333A8261997-03-26026 March 1997 Proposed Tech Specs Removing Administrative Controls Related to Quality Assurance Requirements IAW Guidance of Administrative Ltr 95-06 ML20135C3781997-02-24024 February 1997 Revised Proposed Tech Specs Page Re 3/4, Limiting Condition for Operation & Surveillance Requirements ML17333A7161996-12-20020 December 1996 Proposed Tech Specs Change to Allow for Repair of Hybrid Sleeved SG Tubes in Response to RAI ML17333A7151996-12-20020 December 1996 Proposed Tech Specs 3/4.4.10 Re Reactor Coolant Sys ML17333A5161996-07-22022 July 1996 Proposed Tech Specs,Informing Operations Superintendent Will Have to Hold SRO License,Have Held Senior Operator License or Been Certified to Have Senior Operator Knowledge ML17334B5951996-07-11011 July 1996 Proposed Tech Specs,Supporting Operation of Facility at Increased Core Rated Thermal Power of 3,588 Mwt ML17333A4771996-06-19019 June 1996 Proposed Tech Specs Re Voltage Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking,Per GL 95-05 ML17333A4841996-06-11011 June 1996 ISI & Testing. ML17333A4651996-06-11011 June 1996 Proposed Tech Specs Re Administrative Controls Related to QA 1999-09-23
[Table view] |
Text
ATTACHMENT 2 TO AEP:NRC:0956G EXISTING TECHNICAL SPECIFICATIONS PAGES MARKED TO REFLECT PROPOSED CHANGES 93120100ib 931117 05000315 PDR ADOCK PDR
U Ninimum Channels gmMM Paste Cas Holdup S;.scam .'s=-m Explosive Gas Aonicor."..z
- a. H y d rouen Honitoro
~. ." ..'c gc I~ (1)
(2) 30 29
- b. Oxygsn Monitor QC-370)
- 2. Condenser Evacuacion Syscem a, Noble Cas Accivi=y 28 Monitor (SRA-1905) (1) 27
- b. Plow Race Monitor: SPR-'01)
(1) 27 (1-NR-054 and/or SRA-1910) (1) t:nit Vane. Auxiliary 3u'ding Vencilacion System
- a. Noble Gas Accivl=;. 28
.'Loni"or (VRS-l.505.
- b. iodine Sampler 32 Carer dge .or ".R~ ~
- c. Partcul,ace Sample= 32 "e for ':RS ~ '.=.'.
fluent Svsca. .= = Rata 27
'
R,-0 'nd/o= ".= =" - 101 Sa p'er "'- Rata .".easur'ng 27 "a Ice "..=S-1521) 150'.
V~ 4 4
- a. Aux d.".g Vent.."scam
'e Gas Accivi=y re*a Idol ;'cor (VRS-1505)
- b. Aux Suil.ding Vane. rscan 32 Par t'ula ca S amp l. e r fo r "RS -
- 5. 'Paste Gas Holdup Svs" "..
%*'4 'k 2
- a. Hob l.e Gas Ac t iv: 33 Aonitor Providing Alarm and Terminac'-=""
of Gas Decav .an< ."-.a" eases (VRS-'505)
O. Gland Seal Exhaust
- a. noble Gas Accivi=': 28
.'(oni"or (sRA-l.8051 i 1
)
27
- o. Floe Race lonitor S.=R- '01) (1) 27 (1-.'R-054 and/or SPA ;0) (1) i1 C CAAV . I1MTT 1 3/4 3-63 Amendment No I~ o
~
TABLE 3.3-1,3 (Conc.)
- ~ During vaste gas .o ~ -s-em up system operacion (treatment for primary system gases)
- Duringreleases via this path~ay.
For Purge PurPoses onlv, see Technical SPecifications 3.3.3.10, Table 3.3.l3 and Table 4.3-9 (Items 3.a, S.a 'n boch cables) for non-purging requirements associated vi ch this ins crumenc.
2 For gas decay tank releases only, see Item 3 (Unit Vent, Auxiliary Building Ventilacion System) for addicional requirements.
The waste gas holdup system explosive gas monitoring syscem may be inoperable l
oxygen are co be caicen and analyzed every l2 hours.
COOK NUCLEAR PLANT - UNIT -64 'N 3/4 3 AMENDMENT HO.
s
~ s TA3ZS 4. 3-9 CHANNEL C~K 'ia SOURCE C1QQtNEL FUNCTZONAL XQX paste Gas Ho1dup System Explosive Css HooloorioS Sys=oo Nh Q(3)
- s. HydroSoo Monitor %&BR ~-HQa Q(4)
- b. Oxygen-(4~M ope-Monicor
- c. Oxygen ~~
Monicor (hlc.',QC-370)
Q(4)
- 2. Condenser Evacuation System R(2) Q(l)
- a. Noble Cas Activity Monicor (SRA.-1905)
- b. System Effluent D*%'A Flow Race (SFR-401.
1-MR-054, SRA- 1910)
- 3. Auxiliary Building Ventilation System Q(l)
- a. Noble Gas Activ'; R(2)
Monitor (VRS-1505)
NA iNA
- b. Iodine Sampler (For VRS-1503) NA
- c. Particulate Sample"
.'..""or 'RS-'01)
- d. Svscem Ef=luenc ."-
ow Dx Race .".eas remenc "evice JFR-315. 'u&-054. RS-15 10)
- e. Sampler ."- ~
ow Race Measuremen" Device (VFS -1521)
Containment Purge System
- a. Aux. Buildi.ng Vent. S'stem R(2 Q(1)
Noble Cas Accivity Monk to r (VRS -1505 )
<<*X NA NA
- b. Aux. Building Venc. S'seem NA Particulate Sampler (For VRS-1501)
- 5. '<<aste Cas Holdup Svscem
- a. Noble Gas R(2) Q(5)
Providing Accivic'onitor
.
Alarm & Terminacion of Cas Decay Tank Releases (VRS-1505)
D. C. COOK - UNIT 1 3-66 A endmenc No. 9. >~9
TABLE 3.3-13 Minhaue Channels Qamhla Waste Cas Holdup System 3 Explosive Cas Monitoring System
- a. Hydr'ogen Monitor (g6-bk) Cgc; l~~ (1)
- b. Oxygen Mont.tor (g~, ~C,- f4-c~ (2) 29 QC-370)
- 2. Condenser Evacuation System
- a. Noble Cas Activity Monitor (SRA-2905) (1) 28
- b. Flov Rate Monitor (SFR-401) (1) 2?
(2-MR-054 and/or SRA-2910) (1) 2T
- 3. Unit Vent, Auxiliary Building Ventilation System
- a. Noble Cas Activity Monitor (VRS-2505)
- b. Iodine Sampler
'8 Cartridge for VRS-2503 32
- c. Particulate Sampler Filter for VRS-2501 32
- d. Ef'fluent System Flov Rate Measuring Device (VFR-315) 27 (2-MR-054 and/or VRS-2510) 27
- e. Sampler Flov Rate Measuring Devi.ce (VFS-2521) 27 Containment Purge System
- a. Aux. Building Vent. System Noble Gas Activity Monitor (VRS-2505) **~1 31
- b. Aux. But.lding Vent. System Particulate Sampler f'r VRS-2501 32
- 5. @as te Cas Holdup System
- a. Noble Cas Activity 33 ~
Monitor Providing Alarm and Termination of Gas Decay Tank Releases (VRS-2505)
- 6. Gland. Seal Exhaust
- a. Noble Cas Activity Monitor (SRA-2805)
- b. Flov Rate Monitor (SFR-201)
(1) *~ 28
'(1) **+4 27 (2-MR-054 and/or SRA 2810) (1) 27 D. C. COOK - UNIT 2 3/4 3-59 >'"
h nd nt No. dd
TABLE 3.3-13 (Cont.)
- At all times for primary system gases)
- During waste gas holduo svscemcern operation o (treatment
~*~During releases via this pacnway For F purge purposes onlv see Technical Specifications 3 3 3 10 Table 3.3-13 and rposes on ~ ~ ~
Table. 4, 3 9 (1 cems 3. a, 5. a in boch tables') for non- purging requirements !
associated with this instrument.
For gas decay tank releases only, see item 3 (Unit Vent, Auxiliary Building Ventilation System) for additional requirements.
The waste gas holdup system explosive gas monicori'ng syscem may be inoperable oxygen are to be taken and analyzed every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
COOK NUCLEAR PLANT - UNIT 2 3/4 3>>60 AMENDMENT NO. PP> 114
C CKeNEL CHANNEL SOURCE CHANNEL FUNCTIONAL CHKQ< X@X gasce Gas Holdup System Explosive Gas Monitoring System Q(3)
- a. Hydrogen~~
Nh Monitor (+6-3+) CvC- ~e Q(4)
- b. Oxygen~~ l~~
ÃA
~
'tonicor (~~) CzC - ~ ~
NA Q(4).
- c. Oxygen Monitor (hlc.. QC-3 0)
- 2. Condenser Evacuacion System R(2)"
- a. Noble Gas Activity ... No ~~
Q(l)
Nonitor (SRA-2905)
- b. System Effluenc Flow Race (SFR-401.
2-HR-054, SRA-2910) 3 ..Auxiliary Building Vencilacion System
- a. Noble Cas Accivi "v R(2) Q(l)
Aonitor (VRS-2505)
- b. Iodine Sampler NA iVA NA (For VRS ~ 2503)
- c. Particulace Sample: VA VA NA (cor VRS-250')
- d. S ""1 vs cern = enc: 'w NA Rate .".easure. enc Device (V.R-315. 2-.'cR,-054. ':RS- 2510)
- e. Sampler F'ow Rate 0* YA measurement Device (Vc 5 -252'.)
Conminment Purge System
- a. Aux. 'Building Vent. System R(2) Q(1)
Noble Gas Accivit.r
'tonitor (VRS-2505)
- b. Aux. Building Venc. 5'rs "em <<*'4 NA NA VA Par ticu1 a te S amp 1e.
(For VRS ~ 2501)
'<<asce Cas HoLdup Svs=em
- a. Noble Gas Activity o** R(2) Q(5)
Monitor Providing Alarm & Terminacion of 'Cas Decay Tank Releases (VRS ~ 2505)
D. C. COOK . UNIT 2 3r4 3-62 Amendment No. 8 114
ATTACHMENT 3 TO AEP:NRC:0956G PROPOSED REVISED TECHNICAL SPECIFICATION PAGES
~ ~
'l ~
TABLE 3 3-13 Radioactive Gaseous Effluent Monitorin Instrumentation Minimum Channels Instrument Instrument ~Oem able A licabilit CTION
- 1. Waste Gas Holdup System Explosive Gas Monitoring System~
- a. Hydrogen Monitor (QC-1400) (1) 30
- b. Oxygen Monitor (QC-1400, (2) 29 QC-370)
- 2. Condenser Evacuation System
- a. Noble Gas Activity Monitor (SRA-1905) (1) 28
- b. Flow Rate Moni.tor(SFR-401) (1) 27 (1-MR-054 and/or SRA-1910) (1) 27
- 3. Unit Vent. Auxiliary Building Ventilation System
- a. Noble Gas Activity 28 Monitor (VRS-1505)
- b. Iodine Sampler 32 Cartridge for VRS-1503
- c. Particulate 32 Sampler Filter for VRS-1501
- d. Effluent System Flow Rate Measuring Device (VFR-315) 27 (1-MR-054 and/or VRS-1510) 27
- e. Sampler Flow Rate Measuring Device (VFS-1521) 27
- 4. Containment Purge System
- a. Aux. Building Vent. System 31 Noble Gas Activity Monitor (VRS-1505)
- b. Aux. Building Vent. System 32 Particulate Sampler for VRS-1501
- 5. Waste Gas Holdup System
- a. Noble Gas Activity 33 Monitor Providing Alarm and Termination of Gas Decay Tank Releases (VRS-1505)
COOK NUCLEAR PLANT - UNIT 1 3/4 3-63 AMENDMENT NO. 84,
TABLE 3.3-13 (Cont)
Minimum Channels Instrument Instrument ~Oerable ACTION
- 6. Gland Seal Exhaust
- a. Noble Gas Activity 28 Monitor (SRA-1805)
- b. Flow Rate Monitor(SFR-201) 27 (1-MR-054 and/or SRA 1810) 27
- During'waste gas holdup system operation (treatment for primary system gases)
- During releases via this pathway 1
For purge purposes only. See Technical Specifications 3.3.3.10, Table 3.3-13 and Table 4.3-9 (Items 3.a, 5.a in both tables) for non-purging requirements associated with this instrument.
2 For gas decay tank releases only, see Item 3 (Unit Vent, Auxiliary Building Ventilation System) for additional requirements.
3 The waste gas holdup system explosive gas monitoring system may be inoperable for up to 160 days on a one-time basis for the purpose of replacing one oxygen monitor. During this time grab samples for oxygen are to be taken and analyzed every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
COOK NUCLEAR PLANT - UNIT 1 3/4 3-64 AMENDMENT NO.
TABLE 4.3-9 Radioactive Gaseous Effluent Monitorin Instrumentation Surveillance Re uirements CHANNEL CHANNEL SOURCE CHANNEL FUNCTIONAL Instrument Instrument CHECK CHECK CALIBRATION TEST
- 1. Waste Gas Holdup System Explosive Gas Monitoring System
- a. Hydrogen D*~ NA Q(3)
Monitor (QC-1400)
- b. Oxygen D*** NA Q(4)
Monitor (QC-1400)
Oxygen%'*** D*** NA Q(4)
Monitor(Alt.,QC-370)
- 2. Condenser Evacuation System
- a. Noble Gas Activity D** R(2) Q(1)
Monitor (SRA-1905)
- b. System Effluent D** NA Flow Rate (SFR-401, 1-MR-054, SRA-1910)
- 3. Auxiliary Building Ventilation System
- a. Noble Gas Activity R(2) Q(1)
Monitor (VRS-1505)
- b. Iodine Sampler NA NA (For VRS-1503) c.. Particulate Sampler NA NA NA (For VRS-1501)
- d. System Effluent Flow D* NA Rate Measurement Device (VFR-315, 1-MR-054, VRS-1510)
- e. Sampler Flow Rate D* NA Measurement Device (VFS-1521) 4, Containment Purge System
- a. Aux. Building Vent. D** R(2) Q(l)
System Noble Gas Activity Monitor (VRS-1505)
- b. Aux. Building Vent. NA NA NA System Particulate Sampler (For VRS-1501)
COOK NUCLEAR PLANT - UNIT 1 3/4 3-66 AMENDMENT NO.
TABLE 3.3-13 Radioactive Gaseous Effluent Monitorin Instrumentatio Minimum Channels Instrument Instrument ~Oerable A licabilit ACTION
- 1. Waste Gas Holdup System Explosive Gas Monitoring System
- a. Hydrogen Monitor (QC-1400) (1) 30 b, Oxygen Monitor (QC-1400, (2) 29 QC-370)
- 2. Condenser Evacuation System
- a. Noble Gas Activity Monitor (SRA-2905) (1) 28
- b. Flow Rate Monitor (SFR-401) (1) 27 (2-MR-054 and/or SRA-2910) (1) 27
- 3. Unit Vent, Auxiliary Building Ventilation System
- a. Noble Gas Activity Monitor (VRS-2505) 28
- b. Iodine Sampler Cartridge for VRS-2503 32
- c. Particulate Sampler Filter for VRS-2501 32
- d. Effluent System Flow Rate Measuring Device (VFR-315) 27 (2-MR-054 and/or VRS-2510) 27
- e. Sampler Flow Rate Measuring Device (VFS-2521) 27
- 4. Containment Purge System
- a. Aux. Building Vent System Noble Gas Activity Monitor (VRS-2505) 31
- b. Aux. Building Vent. System Particulate Sample for VRS-2501 32
- 5. Waste Gas Holdup System
- a. Noble Gas Activity Monitor Providing Alarm and Termination of Gas Decay Tank Releases (VRS-2505) 33 COOK NUCLEAR PLANT - UNIT 2 3/4 3-59 AMENDMENT NO. 80,
f~
~ e
,
~
I TABLE 3.3-13 (Cont)
Minimum Channels Instrument Instrument ~Oeaable A licabilit ACTION
- 6. Gland Seal Exhaust
- a. Noble Gas Activity Monitor (SRA-2805) (1) 28
- b. Flow Rate Monitor (SFR-201) (1) 27 (2-MR-054 and/or SRA 2810) (1) 27
- During waste gas holdup system operation (treatment for primary system gases)
- During releases via this pathway.
1 For purge purposes only, see Technical Specifications 3.3.3.10, Table 3.3-13 and Table 4.3-9 (Items 3.a, 5.a in both tables) for non-purging requirements associated with this instrument.
2 For gas decay tank releases only, see Item 3 (Unit Vent, Auxiliary Building Ventilation System) for additional requirements.
3 The waste gas holdup system explosive gas monitoring system may be inoperable for up to 160 days on a one-time basis for the purpose of replacing one oxygen monitor. During this time grab samples for oxygen are to be taken 'and analyzed every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
COOK NUCLEAR PLANT - UNIT 2 3/4 3-60 AMENDMENT NO. 80,
TABLE 4.3-9 Radioactive Gaseous Effluent Monitorin Instrumentation Surveillance Re uirements CHANNEL CHANNEL SOURCE CHANNEL FUNCTIONAL Instrument Instrument CHECK CHECK CALIBRATION TEST
- 1. Waste Gas Holdup System Explosive Gas Monitoring System
- a. Hydrogen NA Q(3)
Monitor (QC-1400)
- b. Oxygen NA Q(4)
Monitor (QC-1400)
- c. Oxygen+*** NA Q(4)
Monitor (Alt. QC-370)
- 2. Condenser Evacuation System
- a. Noble Gas Activity D** R(2) Q(1)
Monitor (SRA-2905)
- b. System Effluent NA Flow Rate (SFR-401, 2-MR-054, SRA-2910)
- 3. Auxiliary Building Ventilation System
- a. Noble Gas Activity D* R(2) Q(1)
Monitor (VRS-2505)
- b. Iodine Sampler NA NA NA (For VRS-2503)
- c. Particulate Sampler NA NA NA (For VRS-2501)
- d. System Effluent D* NA Flow Rate Measure-ment Device (VFR-315, 2-MR-054, VRS-2510)
- e. Sampler Flow Rate NA Measurement Device (VFS-2521)
- 4. Containment Purge System
- a. Aux. Building Vent. R(2) Q(1)
System Noble Gas Activity Monitor (VRS-2505)
- b. Aux. Building Vent NA NA NA System Particulate Sampler (For VRS-2501)
COOK NUCLEAR PLANT - UNIT 2 3/4 3-62 AMENDMENT NO. 80,