Letter to D. Stoddard Surry Independent Spent Fuel Storage Installation - Temporary Modification of Implementation of U.S. Nuclear Regulatory Commission Order EA-02-104
ML18003B131
Person / Time
Site: 07200002
Issue date: 01/03/2018
From: Dapas M
Office of Nuclear Material Safety and Safeguards
To: Stoddard D
Virginia Electric & Power Co (VEPCO)
Chen Y
Shared Package
ML18003B129 List:
References
EA-02-104
Download: ML18003B131 (2)


Text

January 3, 2018 Mr. Daniel Stoddard Senior Vice President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Blvd.

Glen Allen, VA 23060-6711

SUBJECT:

SURRY INDEPENDENT SPENT FUEL STORAGE INSTALLATION -

TEMPORARY MODIFICATION OF IMPLEMENTATION OF U.S. NUCLEAR REGULATORY COMMISSION ORDER EA-02-104

Dear Mr. Stoddard:

By letter dated January 3, 2018, Virginia Electric and Power Company (Dominion) requested a one-time modification from specific interim compensatory measures (ICMs) listed in the U.S.

Nuclear Regulatory Commission (NRC) Order EA-02-104 for the Surry Independent Spent Fuel Storage Installation (ISFSI). Dominion indicated that due to the presently predicted weather conditions and the concern for security personnel safety, it might be necessary to modify implementation of several of the ICMs contained in the Order. Specifically, Dominion proposed a one-time temporary modification to the implementation of its response to ICMs C.1.b, C.3.a(1), and C.3.d of the Order.

The NRC concluded that Dominions proposed one-time modification to the ICMs contained in NRC Order EA-02-104 for the Surry ISFSI reflects good cause given the anticipated weather conditions, and is therefore acceptable. We understand, per Dominions commitment in its January 3, 2018, letter referenced above, that Dominion will report any suspension of security measures related to the Surry ISFSI in accordance with the provisions of Title 10 of the Code of Federal Regulations 73.71. The NRC also understands that the contingency plans proposed by Dominion will no longer be implemented once the severe weather condition has passed.

Sincerely,

/RA/

Marc L. Dapas, Director Office of Nuclear Material Safety and Safeguards Docket No. 72-2 cc: Listserve A. Boland, OE

D. Stoddard

SUBJECT:

SURRY INDEPENDENT SPENT FUEL STORAGE INSTALLATION -

TEMPORARY MODIFICATION OF IMPLEMENTATION OF U.S. NUCLEAR REGULATORY COMMISSION ORDER EA-02-104, DOCUMENT DATE: January 3, 2018 Distribution:

A. Masters, RGN-II S. Walker, RGN-II B. Desai, RGN-II K. Cotton, NRR PM Surry P. McKenna, SRI, Surry C. Jones, RI Surry Y. Chen, NMSS R. Wharton, NMSS J. Peralta, OE J. Andersen, NSIR D. Curtis, NSIR D. Garner, NSIR ADAMS Pkg. No.: ML18003B129 Ltr: ML18003B131 Incoming: ML18003B130 OFFICE NMSS/DSFM NMSS/DSFM NSIR/DSP NMSS/DSFM OGC (nlo)

CRoque-Cruz TMossman NAME YChen MRahimi JMaltese (email) for PSilva (email) (email)

DATE 1/3/2018 1/3/2018 1/3/2018 1/3/2018 1/3/2018 OFFICE NMSS/DSFM NMSS/DSFM NMSS NMSS NAME AHsia MLayton (email) WMoore (email) MDapas DATE 1/3/2018 1/3/2018 1/3/2018 1/3/2018 OFFICIAL RECORD COPY