Independent Spent Fuel Storage Installation (Isfsi); North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Rev. 6.ML19249B764 |
Person / Time |
---|
Site: |
Millstone, Surry, North Anna, 07200002, 07200055 ![Dominion icon.png](/w/images/b/b0/Dominion_icon.png) |
---|
Issue date: |
08/29/2019 |
---|
From: |
Stoddard D Dominion Energy Nuclear Connecticut, Virginia Electric & Power Co (VEPCO) |
---|
To: |
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
---|
References |
---|
19-296 |
Download: ML19249B764 (5) |
|
|
---|
Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 ML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24030A7522024-01-30030 January 2024 Technical Specification Bases Pages IR 05000336/20234022024-01-30030 January 2024 Security Baseline Inspection Report 05000336/2023402 and 05000423/2023402 (Cover Letter Only) ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures IR 05000336/20234402024-01-11011 January 2024 Special Inspection Report 05000336/2023440 and 05000423/2023440 (Cover Letter Only) ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML24004A1052024-01-0404 January 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000336/2024010 & 05000423/2024010 ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23361A0942023-12-21021 December 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies and Core Operating Limits Report . ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23361A0312023-12-20020 December 2023 Intent to Pursue Subsequent License Renewal ML23352A0202023-12-18018 December 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information 2024-02-06
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 August 29, 2019 10 CFR 50.90 U. S. Nuclear Regulatory Commission Serial No.: 19-296 Attention: Document Control Desk NRA/DEA: R2' Washington, DC 20555-0001 Docket Nos.: 50-336/423 50-338/339 50-280/281 72-2/16/4 7/55/56 License Nos.: DPR-65 NPF-49 NPF-4/7 DPR-32/37 SNM-2501/2507 VIRGINIA ELECTRIC AND POWER COMPANY DOMINION ENERGY NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNITS 2 AND 3 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
NORTH ANNA POWER STATION UNITS 1 AND 2 AND ISFSI SURRY POWER STATION UNITS 1 AND 2 AND ISFSI LICENSE AMENDMENT REQUEST TO ADOPT EMERGENCY ACTION LEVEL (EAL) SCHEMES PURSUANT TO NEI 99-01, REV. 6 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION By letter dated January 4, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML19011A237), Dominion Energy Nuclear Connecticut, Inc. (DENG) and Virginia Electric and Power Company submitted a request for a change to the emergency action level schemes for Millstone Power Station (MPS) - Units 2 and 3, North Anna Power Station (NAPS) - Units 1 and 2, and Surry Power Station (SPS) - Units 1 and 2.
The NRC staff has reviewed the submittal and determined that additional information is needed to complete their review. In an email from Ed Miller (NRC) to Craig Sly (Dominion Energy) dated June 18, 2019, the NRC provided specific requests for additional information (RAls) to support their review of the change to the MPS, NAPS and SPS EAL schemes.
A draft version of these RAls (ADAMS Accession No. ML19162A005) was discussed with Mr. Ed Miller and other NRG staff during an RAI clarification call that was held on June 13, 2019. A date of July 30, 2019 was originally agreed upon for submittal of the response to the EAL Scheme Change RAls. However, an extension to August 29, 2019 was subsequently agreed upon between the NRG and Dominion Energy. A- x. £-J.£5 fVµ/~S7-~
- V/\R..
rJtvf~S
Serial No.19-296 Docket Nos.: 50-336/423/338/33 9/280/281 72-2/16/4 7 /55/56 Response to RAJ - EAL Scheme Change Page 2 of 4 Dominion's response to the NRC's RAls is provided in the following
Enclosures:
Enclosure 1: Response to EAL Scheme Change RAls Enclosure 2: SPS Fuel Clad Loss C.6 Deviation Enclosure 3: MPS EAL Technical Bases Documents - Final (Updated)
Enclosure 4: NAPS EAL Technical Bases Document - Final (Updated)
Enclosure 5: SPS EAL Technical Bases Document - Final (Updated)
Enclosure 6: MPS2 Comparison Matrix - RCS Pot. Loss A.1 Enclosure 7: Summary of Calculations - Updated The information provided in this letter does not affect the conclusions of the significant hazards consideration or the environmental assessment included in the April 30, 2018 LAR.
Should you have any questions or require additional information, please contact Ms. Diane E. Aitken at (804) 273-2694.
Sincerely, Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Dominion Energy Nuclear Connecticut, Inc.
Virginia Electric and Power Company CRAIG D SLY Notary Public Commonwealth of Virginia Reg. # 7518653 0 COMMONWEALTH OF VIRGINIA My Commission Expires December 31, 20!.
COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Daniel G Stoddard, who is Senior Vice President and Chief Nuclear Officer, of Dominion Nuclear Energy Connecticut, Inc. and Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of those companies, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this
. "q+h
.> J day of AtAjUSt , 2019.
My Commission Expires: 1;;/a1/?..o
Serial No.19-296 Docket Nos.: 50-336/423/338/339/280/281 72-2/16/4 7/55/56 Response to RAI - EAL Scheme Change Page 3 of 4 Commitments contained in this letter: None
Enclosures:
- 1. Response to EAL Scheme Change RAls
- 2. SPS Fuel Clad Loss C.6 Deviation
- 3. MPS EAL Technical Bases Documents - Final (Updated)
- 4. NAPS EAL Technical Bases Document - Final (Updated)
- 5. SPS EAL Technical Bases Document - Final (Updated)
- 6. MPS2 Comparison Matrix - RCS Pot. Loss A.1
- 7. Summary of Calculations - Updated cc: U. S. Nuclear Regulatory Commission, Region I Attn.: Regional Administrator 2100 Renaissance Blvd.
Suite 100 King of Prussia, Pennsylvania 19406-2713 U. S. Nuclear Regulatory Commission, Region II Attn.: Regional Administrator Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Ms. Yen-Ju Chen NRC Senior Project Manager U.S. Nuclear Regulatory Commission Two White Flint North Mail Stop 4B34 11545 Rockville Pike Rockville, MD 20852-2738 Mr. J. N. Nguyen NRC Senior Project Manager U. S. Nuclear Regulatory Commission Two White Flint North
Serial No.19-296 Docket Nos.: 50-336/423/338/339/280/281 72-2/16/4 7/55/56 Response to RAJ - EAL Scheme Change Page 4 of 4 Mail Stop 4B34 11545 Rockville Pike Rockville, MD 20852-2738 Mr. R. V. Guzman NRC Senior Project Manager Millstone Units 2 & 3 U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pike Rockville, MD 20852-2738 Mr. G. Edward Miller NRC Senior Project Manager North Anna and Surry U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 E-3 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Marcus Harris Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd. - Suite 300 Glen Allen, VA 23060 Director, Radiation Division Department of Energy and Environmental Protection 79 Elm Street Hartford, CT 06106-5127 State Coordinator of Emergency Management Virginia Department of Emergency Management 10501 Trade Court North Chesterfield, VA 23236 NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station
Serial No.19-296 Docket Nos.: 50-336/423/338/339/280/281 72-2/16/47/55/56 Response to RAI - EAL Scheme Change be Page 3 of 3 VERIFICATION OF ACCURACY (CONT'D.):
- 6. Engineering Calculations for Letdown Response: PA-0234, Rev. 1 "Post-Accident Letdown Radiation Monitor Response for North Anna"; PA-0236, Rev. 0, Add. A "Post-Accident Letdown Radiation Monitor Response for Surry."
- 7. NUREG-1228, pages 1-2, 1-6 and 1-8.
- 8. LA7660961, "Prepare an EAL change (i.e. performed under a 50.54(q)) to change the current EAL.
ACTION PLAN/COMMITMENTS (STATED OR IMPLIED):
None REQUIRED CHANGES TO FSAR, UFSAR, QA TOPICAL REPORT OR ISFSI FSAR:
None