IR 05000280/2018410

From kanterella
Jump to navigation Jump to search
U.S. Nuclear Regulatory Commission Security Inspection Report 05000280/2018410, 05000281/2018410, 07200002/2018401, and 07200055/2018401
ML18123A367
Person / Time
Site: Surry, 07200002, 07200055  
Issue date: 05/03/2018
From: Binoy Desai
Division of Reactor Safety II
To: Stoddard D
Virginia Electric & Power Co (VEPCO)
References
IR 2018401, IR 2018410
Download: ML18123A367 (9)


Text

May 3, 2018

SUBJECT:

SURRY POWER STATION, UNITS 1 AND 2 - U.S. NUCLEAR

REGULATORY COMMISSION SECURITY INSPECTION REPORT

05000280/2018410, 05000281/2018410, 07200002/2018401, AND

07200055/2018401

Dear Mr. Stoddard:

On March 29, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Surry Power Station, Units 1 and 2. Portions of the inspection associated with Access Authorization, Protection of Safeguards Information, and Fitness for Duty were completed at the Dominion Corporate Office on February 1, 2018. On March 29, 2018, the NRC inspectors discussed the results of this inspection with Mr. F. Mladen and other members of your staff. The results of this inspection are documented in the enclosed report.

No NRC-Identified or self-revealing findings were identified during the inspections.

This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room, in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Binoy Desai, Chief Plant Support Branch

Division of Reactor Safety

Docket Nos. 50-280, 50-281, 72- 002 and 72-055 License Nos. DPR-32 and DPR-37

Enclosure:

NRC IR 05000280/2018410, 05000281/2018410, 07200002/2018401, and 07200055/2018401 w/Attachment:

Supplemental Information

Inspection Report

Docket Nos:

05000280, 05000281, 07200002, 07200055

License Nos:

DPR-32 and DPR-37

Report Nos:

05000280/2018410, 05000281/2018410, 07200002/2018401 and

07200055/2018401

Enterprise Identifier:

I-2018-410-0010

Licensee:

Virginia Electric and Power Company

Facility:

Surry Power Station, Units 1 and 2

Location:

Surry, VA

Dates:

March 26-29, 2018

Inspectors:

Jon Wallo, Sr. Physical Security Inspector

Randy Patterson, Physical Security Inspector

Approved by:

Binoy Desai, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security Inspection at North Anna Power Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below.

List of Findings and Violations

No findings were identified.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were evaluated from this IP dated January 1, 2017.

Tier I:

All requirements Tier II:

02.06 (c), 02.07(a), 02.08(b, c)

Tier III:

02.09, 02.10(a-c)

71130.02 - Access Control

The inspectors evaluated the access control program. The following elements were evaluated from this IP dated January 1, 2017.

Tier I:

All requirements Tier II:

7 Requirements 02.05 (a),

(c) 02.07 (a), (b), (c), (d),
(e) Tier III:

1 Requirement 02.09 (a)

71130.06 - Protection of Safeguards Information

The inspectors evaluated the safeguards information protection program. The following elements were evaluated from this IP dated January 1, 2017.

Tier I:

All requirements Tier II:

02.05(a, b)

Tier III:

02.09

71130.08 - Fitness for Duty

The inspectors evaluated the fitness for duty program. The following elements were evaluated from this IP dated January 1, 2017.

Tier I:

All requirements Tier II:

02.05(c), 02.06(c, d), 02.07(g), 02.08(a-e)

Tier III:

02.11, 02.12(a), 02.13(a), 02.14(b, d, e), 02.15(a, b, c)

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below for the period from March 2017 through March 2018.

(1) Protected Area Security Equipment Performance Index

81311 - Physical Security Requirements for Independent Spent Fuel Storage Installations (1 Sample)

The inspectors evaluated the physical security requirements for independent spent fuel storage installations program. All inspection requirements from this IP dated January 1, 2018, were completed.

EXIT MEETINGS AND DEBRIEFS

On March 29, 2018, the inspectors presented the Baseline Security Inspection results to Mr. F.

Mladen and other members of the licensee staff.

LIST OF

DOCUMENTS REVIEWED

PROCEDURES

Audit 15-01-Security and Fitness for Duty, dated 3/13/15

Audit 16-01-Security, Fitness for Duty and Unescorted Access Authorization, dated 3/10/16

Audit 17-10- Security, dated March 20, 2017

Audit 17-0064, Audited Contract Vendor, dated 7/13/17

Audit 18-01-Fitness for Duty/Unescorted Access Authorization/Cyber Security

FFDC-LP-Fitness for Duty Collection-Revision 6

General Order 103-Regulatory Assessment Performance Indicator Data Reporting-Revision 3

GO-SU-107, Personnel Searches, Revision 14

GO-SU-153, Visitor Processing, Revision 6

GO-SU-148, Material Search, Revision 9

LI-AA-500- NRC/INPO/WANO Performance Indicator Data Reporting-Revision 2

LI-AA-700- Fatigue Management and Work Hour Limits for Covered Workers-Revision 13

SPIP-006-Authorized Personnel Access Control - Revision 9

SPIP-011-Lock, Key, Core and Key Card Control - Revision 10

SPIP-014-Photo Identification, Badging, and Keycard System - Revision 13

SPIP-016-Personnel Searches - Revision 11

SPIP-026-Response to ISFSI - Revision 0

SY-AA-PLN-090- Vehicle Access Control - Revision 5

SY-AA-106-Control of SGI and Other Security-Related Information-Revision 15

SY-AA-115-Personnel Processing and Access to Station Facilities - Revision 0

SY-AA-201-Nuclear In-Processing X-Press-Revision 3

SY-AA-FFD-101-Fitness For Duty-Revision 10

SY-AA-FFD-102-Fitness for Duty Program Administration-Revision 8

SY-AA-FFD-103-Drug and Alcohol Collection-Revision 8

SY-AA-FFD-104-Drug and Alcohol Testing Program Administration-Revision 4

SY-AA-FFD-105-Fitness for Duty Onsite Testing-Revision 2

SY-AA-FFD-106-Fitness for Duty Testing Blind Proficiency Sample Processing-Revision 1

SY-AA-FFD-107-Fitness for Duty Program Review-Revision 13

SY-AA-PAD-101-Personnel Access System-Revision 1

SY-AA-UAA-101-Unescorted Access Authorization Program-Revision 3

SY-AA-UAA-102-PII Breach Incident Response Plan-Revision 1

UAA-2017-19-Audited Contract Vendor, dated 9/19/17

UAA-2017-6-Quest Diagnostic Audit, dated 10/11/17

CONDITION REPORTS

15-568881

15-571418

15-576127

15-576129

15-1019009

17-1057664

17-1058130

17-1060000

17-1075650

17-1077683

17-1080436

17-1085302

17-1078624

17-1088699

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

May 3, 2018

Mr. Daniel Stoddard

Senior Vice President and Chief Nuclear Officer

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA 23060-6711

SUBJECT:

SURRY POWER STATION, UNITS 1 AND 2 - U.S. NUCLEAR

REGULATORY COMMISSION SECURITY INSPECTION REPORT

05000280/2018410, 05000281/2018410, 07200002/2018401, AND

200055/2018401

Dear Mr. Stoddard:

On March 29, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security

inspection at your Surry Power Station, Units 1 and 2. Portions of the inspection associated

with Access Authorization, Protection of Safeguards Information, and Fitness for Duty were

completed at the Dominion Corporate Office on February 1, 2018. On March 29, 2018, the

NRC inspectors discussed the results of this inspection with Mr. F. Mladen and other members

of your staff. The results of this inspection are documented in the enclosed report.

No NRC-Identified or self-revealing findings were identified during the inspections.

This letter will be made available for public inspection and copying at

https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room,

D. Stoddard

in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Binoy Desai, Chief

Plant Support Branch

Division of Reactor Safety

Docket Nos. 50-280, 50-281, 72- 002

and 72-055

License Nos. DPR-32 and DPR-37

Enclosure:

NRC IR 05000280/2018410,

05000281/2018410, 07200002/2018401, and

200055/2018401 w/Attachment:

Supplemental Information

cc: (See page 3)

D. Stoddard

cc:

Roger Lee Jones

Surry Power Station

5570 Hog Island Road

Surry, VA 23883-0315

ML18123A367

SUNSI REVIEW COMPLETE

FORM 665 ATTACHED

OFFICE

RII/ DRS/PSB

RII/DRS/PSB

RII/DRS/PSB

RII/DRP

RII/DRS/PSB

SIGNATURE

RLP5

JHW2

BBD

SDR2

BBD

NAME

R. PATTERSON

J. WALLO

B. DESAI

S. ROSE

B. DESAI

DATE

5/ 2 /2018

5/ 2 /2018

5/ 2 /2018

5/ 3 /2018

5/ 3 /2018

E-MAIL COPY?

YES

NO

YES

NO

YES

NO

YES

NO

YES

NO

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Nos:

05000280, 05000281, 07200002, 07200055

License Nos:

DPR-32 and DPR-37

Report Nos:

05000280/2018410, 05000281/2018410, 07200002/2018401 and

200055/2018401

Enterprise Identifier:

I-2018-410-0010

Licensee:

Virginia Electric and Power Company

Facility:

Surry Power Station, Units 1 and 2

Location:

Surry, VA

Dates:

March 26-29, 2018

Inspectors:

Jon Wallo, Sr. Physical Security Inspector

Randy Patterson, Physical Security Inspector

Approved by:

Binoy Desai, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting a Baseline Security Inspection at North Anna Power Station, Units 1

and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is

the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and

self-revealed findings, violations, and additional items are summarized in the table below.

List of Findings and Violations

No findings were identified.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for

Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and

records, observed activities, and interviewed personnel to assess licensee performance and

compliance with Commission rules and regulations, license conditions, site procedures, and

standards.

SAFEGUARDS

71130.01 - Access Authorization (1 Sample)

The inspectors evaluated the access authorization program. The following elements were

evaluated from this IP dated January 1, 2017.

Tier I:

All requirements

Tier II:

2.06 (c), 02.07(a), 02.08(b, c)

Tier III:

2.09, 02.10(a-c)

71130.02 - Access Control (1 Sample)

The inspectors evaluated the access control program. The following elements were evaluated

from this IP dated January 1, 2017.

Tier I:

All requirements

Tier II:

Requirements 02.05 (a), (c) 02.07 (a), (b), (c), (d), (e)

Tier III:

Requirement 02.09 (a)

71130.06 - Protection of Safeguards Information (1 Sample)

The inspectors evaluated the safeguards information protection program. The following

elements were evaluated from this IP dated January 1, 2017.

Tier I:

All requirements

Tier II:

2.05(a, b)

Tier III:

2.09

71130.08 - Fitness for Duty (1 Sample)

The inspectors evaluated the fitness for duty program. The following elements were evaluated

from this IP dated January 1, 2017.

Tier I:

All requirements

Tier II:

2.05(c), 02.06(c, d), 02.07(g), 02.08(a-e)

Tier III:

2.11, 02.12(a), 02.13(a), 02.14(b, d, e), 02.15(a, b, c)

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification (1 Sample)

The inspectors verified licensee performance indicators submittals listed below for the period

from March 2017 through March 2018. (1) Protected Area Security Equipment Performance

Index

81311 - Physical Security Requirements for Independent Spent Fuel Storage Installations (1

Sample)

The inspectors evaluated the physical security requirements for independent spent fuel storage

installations program. All inspection requirements from this IP dated January 1, 2018, were

completed.

EXIT MEETINGS AND DEBRIEFS

On March 29, 2018, the inspectors presented the Baseline Security Inspection results to Mr. F.

Mladen and other members of the licensee staff.

LIST OF DOCUMENTS REVIEWED

PROCEDURES

Audit 15-01-Security and Fitness for Duty, dated 3/13/15

Audit 16-01-Security, Fitness for Duty and Unescorted Access Authorization, dated 3/10/16

Audit 17-10- Security, dated March 20, 2017

Audit 17-0064, Audited Contract Vendor, dated 7/13/17

Audit 18-01-Fitness for Duty/Unescorted Access Authorization/Cyber Security

FFDC-LP-Fitness for Duty Collection-Revision 6

General Order 103-Regulatory Assessment Performance Indicator Data Reporting-Revision 3

GO-SU-107, Personnel Searches, Revision 14

GO-SU-153, Visitor Processing, Revision 6

GO-SU-148, Material Search, Revision 9

LI-AA-500- NRC/INPO/WANO Performance Indicator Data Reporting-Revision 2

LI-AA-700- Fatigue Management and Work Hour Limits for Covered Workers-Revision 13

SPIP-006-Authorized Personnel Access Control - Revision 9

SPIP-011-Lock, Key, Core and Key Card Control - Revision 10

SPIP-014-Photo Identification, Badging, and Keycard System - Revision 13

SPIP-016-Personnel Searches - Revision 11

SPIP-026-Response to ISFSI - Revision 0

SY-AA-PLN-090- Vehicle Access Control - Revision 5

SY-AA-106-Control of SGI and Other Security-Related Information-Revision 15

SY-AA-115-Personnel Processing and Access to Station Facilities - Revision 0

SY-AA-201-Nuclear In-Processing X-Press-Revision 3

SY-AA-FFD-101-Fitness For Duty-Revision 10

SY-AA-FFD-102-Fitness for Duty Program Administration-Revision 8

SY-AA-FFD-103-Drug and Alcohol Collection-Revision 8

SY-AA-FFD-104-Drug and Alcohol Testing Program Administration-Revision 4

SY-AA-FFD-105-Fitness for Duty Onsite Testing-Revision 2

SY-AA-FFD-106-Fitness for Duty Testing Blind Proficiency Sample Processing-Revision 1

SY-AA-FFD-107-Fitness for Duty Program Review-Revision 13

SY-AA-PAD-101-Personnel Access System-Revision 1

SY-AA-UAA-101-Unescorted Access Authorization Program-Revision 3

SY-AA-UAA-102-PII Breach Incident Response Plan-Revision 1

UAA-2017-19-Audited Contract Vendor, dated 9/19/17

UAA-2017-6-Quest Diagnostic Audit, dated 10/11/17

CONDITION REPORTS

15-568881

15-571418

15-576127

15-576129

15-1019009

17-1057664

17-1058130

17-1060000

17-1075650

17-1077683

17-1080436

17-1085302

17-1078624

17-1088699