ML18016A057
| ML18016A057 | |
| Person / Time | |
|---|---|
| Site: | Millstone, Surry, North Anna, 07200002, 07200055 (DPR-021, DPR-032, DPR-037, DPR-065, NPF-004, NPF-007, NPF-049, SNM-2501, SNM-2507) |
| Issue date: | 01/10/2018 |
| From: | Gerald Bichof Dominion Energy Services |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Office of Nuclear Security and Incident Response |
| References | |
| 17-021F | |
| Download: ML18016A057 (3) | |
Text
SAFEGUARDS INFORMATION Dominion Energy Services, Inc.*
5000 Dqminion Boulevard, Glen Allen, VA 23060 Dominion Energy.com
.-_ Dominion
- .r-i? E January 10, 2018
- iii'1 nergy 10 CFR 50.54 10 CFR 72.186 Attention
- Document Control Desk Director, Division of Security Policy, Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 DOMINION NUCLEAR CONNECTICUT, INC.
VIRGINIA ELECTRIC AND POWER COMPANY MILLSTONE POWER S°TATION UNITS 1, 2, AND 3 NORTH ANNA POWER STATION UNITS 1 AND 2 SURRY POWER STATION,UNITS 1 AND 2 AND ASSOCIATED ISFSls Serial No.:
NRA/MLW:
Docket Nos.:
License Nos.:
17-021 F RO 50-245/336/423 50-338/339 50-280/281 72-2/16/4 7 /55/56 DPR-21/65 NPF-49 NPF-4/7 DPR-32/37 SNM-2501/2507 SUBMITTAL OF SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, SAFEGUARDS CONTINGENCY PLAN, AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI) SECURITY PROGRAM - REVISION 28 Pursuant to 10 CF 50.54(p)(2) and 10 CFR 72.186(b), Revision 28 of the Millstone/North Anna and Surry Power Stations' Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program (the Plan) is provided as Enclosure 1 to this letter. This revision includes changes niade as a result of a protective strategy assessment at Millstone Power Station* (MPS).
The plan became effective November 17, 2017. Enclosure 2 provides the evaluation that concluded the changes did not decrease the safeguards effectiveness of the plan.
Enclosures 1 and 2 contain Safeguards Information (SGI) as defined by 10 CFR 73.22.
Disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.
If you have any questions, please contact Michael Whitlock at 804-273-3123.
Sincerely, MJJfJrb Gerald T. Bischof Classified By:
Name: Roger Minner
Title:
COORD NUCLEAR SECURITY PROGRAMS Organization: Nuc. Protection Services/ Dominion Effective Date: Novemher 22 2017 Vice President - Nuclear Operations - Fieet Performance Unauthorized Disclosure of Safeguards Information Ii
- Will Be Subiect To Civil and Criminal Sanctions Dominion Energy Nuclear Connecticut, Inc.
, ) C O p_ l. _ --,
Virginia Electric and Power Company fJ 1 :-*p7 /(...{) 0, r NOTE: THE.ENCLOSURES TO THIS LETIER CONTAIN "SAFEGUARDS INFORMATION" N"' J L c...-, I. -
AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE 1'1...,J _:>t.-f..P ENCLOSURES, THIS LETTER IS "DECONTROLLED."
- J f( f2_
SAFEGUARDS INFORMATION
f'.,\\SS
Serial. No. 17-021F Sec. Plan Rev. 28 Submittal Page 2 of 3 : Millstone, North Anna and Surry
- Power Stations' Security Plan, Training and*
Qualification Plan, Safeguards* Contingency Plan, and lnde*pendent Spent Fuel Storage Installation Security Program, Revision 28 (SGI) : Protective Strategy Evaluation (SGI)
Commitments made by this letter: None cc:
U.S. Nuclear Regulatory Commission, Region I Attn.: Regional Administrator 2100 Renaissance Blvd.
Suite 100 King of Prussia, Pennsylvania 19406-2713 U. S. Nuclear Regulatory Commission, Region II Attn.: Regional Administrator Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 J. N. Nguyen (Without Enclosure)
Senior Project Manager U.S. Nuclear Regulatory Commission Two White Flint North Mail Stop 4834 11545 Rockville Pike Rockville, MD 20852-2738 Y. Chen (Without Enclosure)
Senior Project Manager
- U. S. Nuclear Regulatory Commission Two White Flint North Mail Stop 4834 11545 Rockville Pike*
Rockville, MD 20852-2738 T. H. Carter (Without Enclosure)
NRC Senior Project Manager Millstone Unit 1 Two White Flint North Mail Stop T-8 F5 11545 Rockville Pike Rockville, MD 20852-2738
R. V. Guzman (Without Enclosure)
NRC Senior Project Manager Millstone Units 2 & 3 U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pike Rockville, MD 20852-2738 K. R. Cotton Gross (Without Enclosure)
NRC Project Manager Surry U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Mr. James R. Hall (Without Enclosure)
NRC Senior Project Manager North Anna
- U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 B1-A 11555 Rockville Pike Rockville, MD 20852-2738 L.A. Kauffman (Without Enclosures)
NRC Inspector 2100 Renaissance Blvd.
Suite 100 King of Prussia, PA 19406'-2713 Mr. J. E. Reasor, Jr. (Without Enclosure)
Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.~
Suite 300 Glen Allen, VA 23060 NRC Senior Resident Inspector (Without Enclosure)
Millstone Power Station
- NRC Senior Resident Inspector (Without Enclosure)
North Anna Power Station NRC Senior Resident Inspector (Without Enclosure)
Surry Power Station Serial No.17-021F Sec. Plan Rev. 28 Submittal Page 3 of 3
,