Dominion Resources Services, Inc.
Innsbrook Technical Center Safeguards lnformation
_ 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060
- Attention: Document Control Desk Director, Division of Security Policy, April 24, 2017 Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 DOMINION NUCLEAR CONNECTICUT, INC.
VIRGINIA ELECTRIC AND POWER COMPANY MILLSTONE POWER STATION UNITS 1. 2, AND 3 NORTH ANNA POWER STATION UNITS 1 AND 2 SURRY POWER STATION UNITS 1AND2 AND ASSOCIATED ISFSls Serial No.:
NRNMLW:
Docket Nos.:
License Nos.:
10 CFR 50.54 10 CFR 72.186 17-0218 RO 50-245/336/423 50-338/339 50-280/281 72-2/16/47 /55/56 DPR-21/65 NPF-49 NPF-4/7 DPR-32/37_
SNM-2501/2507 SUBMITTAL OF SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, SAFEGUARDS CONTINGENCY PLAN, AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI) SECURITY PROGRAM - REVISION 25 Pursuant to 10 CFR 50. 54(p )(2) and 10 CFR 72.186(b ), Revision 25 of the Millstone, North Anna and Surry Power Stations' Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program is provided as Enclosure 1. This revision includes changes made as a result of a security equipmemt assessment at Surry Power Station. The plan became effective March 28, 2017. provides the evaluation that concluded the changes did not decrease the safeguards effectiveness of the plan.
Enclosures 1 and 2 contain Safeguards Information (SGI) as defined by 10 CFR 73.22.
Disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act.
of 1954, as amended.
If you have any questio'ns, please contact Michael Whitlock at 804-273-3123.
Classified By:
Name: Roger Minner Sinc~r~ly, r'\\ (
~-uf-
Title:
COORD NUCLEAR SECURITY PROGRAMS Organization: Nuc. Protection Services/ Dominion Effective Date: ~Ao=ri_l 1=0.=20~1~7 ____
Mark D. Sartain Vice President - N.uclear Engineering and Fleet Support inion Nuclear Connecticut, Inc.
Dom Virgin ia Electric and Power Company Unauthorized Disclosure Of Safeguards Information Will Be Subiect To Civil And Criminal Sanctions NOTE: THE ENCLOSURES TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURES, THIS LETTER IS "DECONTROLLED."
Safeguards_ Information Soo I (051 ((_ D ~
N/Vi ssz&
/JSl~ -
\\
--~ivt5S.
- Safeguards Information Serial No. 17-0218 Sec. Plan Submittal Rev. 25 Page 2 of 4 : Millstone, North Anna and Surry Power Stations' Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 25 (SGI) : Evaluation of PSP Revision 25 for the Security Equipment Assessment Surry Nuclear Power Station (SGI)
Commitments made by this letter: None
- cc:
U. S. Nuclear Regulatory Commission, Region I Attn.: Regional Administrator 2100 Renaissance Blvd.
Suite 100 King of Prussia, Pennsylvania 19406-2713 U. S. Nuclear Regulatory Commission, Region II Attn.: Regional Administrator Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 J. M. Goshen (Without Enclosures)
NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop EBB-E3 D2M 11555 Rockville Pike Rockville, MD 20852-2738 Y. Chen (Without Enclosures)
Senior Project Manager U. S.*Nuclear Regulatory Commission Two White Flint No'rth Mail Stop 4834 11545 Rockville Pike, Rockville, MD 20852-2738 NOTE: THE ENCLOSURES TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDiNGLY. UPON SEPARATION OF THE ENCLOSURES, THIS LETTER IS "DECONTROLLED."
Safeguards Information
Safeguards *Information T. H. Carter (Without Enc_losures)
NRC Senior Project Manager Millstone Unit 1 Two White Flint North Mail Stop T-8 F5 11545 Rockville Pike Rockville, MD 20852-2738 R. V. Guzman (Without Enclosures)
NRC Senior Project Manager Miiistone Units 2 & 3 U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pike Rockville, MD 20852-2738 K. R. Cotton Gross (Without Enclosures)
NRC Project Manager Surry U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A.
11555 Rockville Pike Rockville, MD 20852-2738 B. L. Mozafari (Without Enclosures)
NRC Project Manager North Anna
- U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 H-12 11555 Rockville Pike Rockville, MD 20852-2738 L.A. Kauffman (Without Enclosures)
NRC Inspector 2100 Renaissance Blvd.
Suite 100 King of Prussia, PA 19406-2713 Mr. J. E. Reasor, Jr. (Without Enclosures)
Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.
Suite 300 Glen Allen, VA 23060 Serial No.17-021 B Sec. Plan Submittal Rev. 25 Page 3 of 4 NOTE: THE ENCLOSURES TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURES, THIS LETTER IS "DECONTROLLED."
Safeguards Information
Safeguards Information NRC Senior Resident Inspector (Without Enclosures)
Millstone Power Station NRC Senior Resident Inspector (Without Enclosures)
North Anna Power Station NRC Senior Resident Inspector (Without Enclosures)
Surry Power Station Serial No. 17-0218 Sec. Plan Submittal Rev. 25 Page 4 of 4 NOTE: THE ENCLOSURES TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURES, THIS LETTER IS "DECONTROLLED."
- safeguards Information
Safeguards Information Serial No. 17-0218.
ENCLOSURE 1 Millstone, North Anna and Surry Power Stations' Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Se.curity Program, Revision 25 Clii!SSified By:
Name: Roger Minne(
Title:
COORD NUCLEAR SECURITY PROGRAMS Organization: Nuc: Protection Services/ Dominion Effective Date:._,Ap=r.,_il,_,1 O"-'. 2=0._,_17,___ ____
Unauthorized Disclosure Of Safeguards Information Will Be
,Subiect To Civil And Criminal Sanctions Dominion Nuclear Conne<?ticut, Inc.
Virginia Electric and Power Comp~ny NOTE: THIS ENCLOSURE CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURE, THIS PAGE IS "DECONTROLLED."
Safeguards Information
'Safeguards Information Serial No.17-021 B ENCLOSURE 2 Evaluation of PSP Revision 25 for the Security Equipment Assessment Surry Nuclear Power Station I*
Classified By:
Name: Roger Minner
Title:
COORD NUCLEAR SECURITY PROGRAMS Organization: Nuc. Protection Services/ Dominion*
Effective Date:,_,_Ap=r"-il 1...,,0~. 2=0'""'-17,__ ____
Unauthorized Disclosure Of Safeguards Information Will Be Subiect To Civil And Criminal Sanctions Surry Power Station - Units 1 and 2 Virginia Electric and Power Company NOTE: THIS ENCLOSURE CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURE, THIS PAGE IS "DECONTROLLED."
Safeguards Information.