Category:Drawing
MONTHYEARML22340A1522022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 5, Figures (Redacted) ML22340A1342022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 10, Figures ML22340A1912022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 8, Figures ML22340A2152022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 1, Figures (Redacted) ML22340A1692022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.4-1 to 14.3.4-158 (Unit 2) ML22340A1942022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 4, Figures ML22340A1442022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.4, Figures 14.4.2-1 to 14.4.9-2 (Unit 2) ML22340A1422022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Figures (Unit 1) ML22340A1842022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.3, Figure 14.3.7-1 (Unit 2) ML22340A1382022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 11, Figure ML22340A1872022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.A-G, Figures 14.G-1 and 14.G-2 (Unit 1) ML22340A1892022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 9, Figures ML22340A1292022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 6, Figures ML21125A4882021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 14.1, Figures 14.1.0-1 to 14.1.12-2 (Unit 2) ML21125A5832021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.4-76 to 14.3.9-25 (Unit 1) ML21125A5672021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 9, Figures ML21125A5462021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 14.2, Figures 14.2.5-1 to 14.2.8-8 (Unit 2) ML21125A5792021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 3, Figures (Unit 2) ML21125A5032021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 14.4, Figures 14.4.2-1 to 14.4.9-2 (Unit 2) ML21125A5182021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 2, Figures ML21125A5352021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 1, Figures (Redacted) ML21125A4822021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 6, Figures ML21125A5252021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 14.2, Figures 14.2.5-1 to 14.2.7-6 (Unit 1) ML21125A5702021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.1-1A to 14.3.4-75 (Unit 1) ML21125A5432021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 14, Figures 14.1-1 to 14.1.13-6 (Unit 1) ML21125A5942021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 14.A-G, Figures 14.G-1 and 14.G-2 (Unit 1) ML21125A5332021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 14.3, Figure 14.3.7-1 (Unit 2) ML21125A4562021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 3, Figures (Unit 1) ML21125A5242021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 10, Figures ML21125A5692021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.4-1 to 14.3.4-158 (Unit 2) ML21125A5642021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 4, Figures ML21125A4752021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 5, Figures (Redacted) ML21125A5092021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 11, Figures ML18220A6192018-08-0808 August 2018 Figure 8.3-4, Amendment 5, Existing Soil Profiles Section D-D, Boring Location Plan, Looking East ML18220A6292018-08-0808 August 2018 Figure 3.2.3-6, Upper Core Support Assembly. ML18220A6282018-08-0808 August 2018 Figure 3.2.3-9, Fuel Assembly Outline. ML18220A6212018-08-0808 August 2018 Figure 8.3-1, Amendment 5, Existing Soil Profiles Section A-A, Boring Location Plan, Looking East ML18220A6222018-08-0808 August 2018 Figure 8.3-2, Amendment 5, Existing Soil Profiles Section B-B, Boring Location Plan, Looking East ML18220A6182018-08-0808 August 2018 Figure 8.3-5, Amendment 5, Existing Soil Profiles, Section E-F, Boring Location Plan, Looking North ML18220A6202018-08-0808 August 2018 Figure 8.3-3, Amendment 5, Existing Soil Profiles Section C-C, Boring Location Plan, Looking East ML18219D3302018-08-0707 August 2018 Figure 4.2-2, Reactor Vessel Schematic. ML18219D3292018-08-0707 August 2018 Figure 3.2.3-5, Lower Core Support Structure. ML16341C6252016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.8-3, Compressed Air System ML16343A0522016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 11, Figure 11.5-1, Steam Generator Blow-Down System, Unit No. 1 & 2 ML16336A6502016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Grid to Thimble Attachment Joints, Figure 3.2-5A ML16336A6532016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Typical Core Barrel Assembly, Figure 3.2-8 ML16336A6492016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Top Grid to Thimble Attachment, Figure 3.2-5 ML16341B0142016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.3.5.1-1, Floor Structure ML16341B5732016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-1, Vital Instrument Bus Distribution System ML16343A0482016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 11, Figure 11.1-2B, Wds Liquids & Solids, Units No. 1 & 2, Sheet 3 of 3 2022-11-30
[Table view] Category:Letter
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08
[Table view] |