Text

UFSAR Revision 31.0

FSAR FIG. 9.2 - 2 CVCS REACTOR COOLANT DEMINERALIZATION UNITS NO. 1 OR 2 VALVE POSITIONS ARE NOT GOVERNED BY THE UFSAR FIGURES BUT RATHER BY STATION PROCEDURES (EXCEPT VALVES WITH LOCKED OR SEALED, AND FAILURE POSITIONS AS INDICATED).

UFSAR Revision 31.0

fsar-fig-9.2-3_21-2.dgn 3/7/2008 10:30:02 AM UFSAR Revision 31.0

UFSAR Revision 31.0

VALVE POSITIONS ARE NOT GOVERNED BY THE UFSAR FIGURES BUT RATHER BY STATION PROCEDURES (EXCEPT VALVES WITH LOCKED OR SEALED, AND FAILURE POSITIONS AS INDICATED).

4.

FSAR FIG. 9.2 - 5 FLOW DIAGRAM CVCS-BORON RECOVERY UNITS NO. 1 & 2 Revised Per UCR 99-UFSAR-1343 16.6 16.6 UFSAR Revision 31.0

VALVE POSITIONS ARE NOT GOVERNED BY THE UFSAR FIGURES BUT RATHER BY STATION PROCEDURES (EXCEPT VALVES WITH LOCKED OR SEALED, AND FAILURE POSITIONS AS INDICATED).

17 Revised per UCR-1440 17 17 OP-12-5134 FROM OR TO MAIN CONDENSER DISCHARGE (VIA WASTE DISPOSAL SYSTEM)

SEE FIG. 11.1-2

REFERENCES:

17 FSAR FIG. 9.2-6 CVCS-MONITOR TANKS UNITS NO. 1 & 2 UFSAR Revision 31.0

Figure 6.2-1A & 9.3-1 serves as the figure for both Figure 6.2-1A and Figure 9.3-1.

Only one figure will be maintained to prevent having update issues with the figure.

Figure 6.2-1A will be maintained as the figure for both Figure 6.2-1A and Figure 9.3-1.

The bookmark for Figure 9.3-1 will point to the figure being maintained as Figure 6.2-1A and physically located in the Chapter 6 Figures subdirectory.

UFSAR Revision 31.0

FSAR FIG. 9.4 - 1 SPENT FUEL PIT COOLING & CLEAN-UP UNITS NO. 1 & 2 VALVE POSITIONS ARE NOT GOVERNED BY THE UFSAR FIGURES BUT RATHER BY STATION PROCEDURES (EXCEPT VALVES WITH LOCKED OR SEALED, AND FAILURE POSITIONS AS INDICATED).

3.

UFSAR Revision 31.0

fsar-fig-9.5-1_22.1.dgn 07/29/2009 10:58:13 AM UFSAR Revision 31.0

UFSAR Revision 31.0

FSAR FIG. 9.6 - 2 POST-ACCIDENT SAMPLING UNITS NO. 1 AND 2 NOTE:

VALVE POSITIONS ARE NOT GOVERNED BY THE UFSAR FIGURES BUT RATHER BY STATION PROCEDURES (EXCEPT VALVES WITH LOCKED OR SEALED, AND FAILURE POSITIONS AS INDICATED).

16.5 Revised Per UCR 98-UFSAR-0793 16.5 UFSAR Revision 31.0

UFSAR Revision 31.0

. I C :

c 01 12x14 03 12x14 82 12x14 F2 12x11 04 12x14 A2 13x14 13 x-Ui H

13x14-0x2 A3 13x14 c

13x12 E3 13x11 A4 13x14 c4 13x12 E4 13x11 Tvpfcal Rnctc-lafid dap: T TOM Stomge:

3616 cells (lrtclucte 3 triangufar c0fmr cefls)

F I GURE 9.7-2 : COOK SPENT FUEL POOL IAYOUT f>

r..

I f 7 I UFSAR Revision 31.0

  • The storage pattern for any of these individual modules may be as shown in this figure or Figure 9.7-4.

Title:

NORMAL STORAGE PATTERN (Mixed Three Zone)

Sheet 1 of 1 UFSAR Figure: 9.7-3 AMERICAN ELECTRIC POWER COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN Change

Description:

UCR-1961 Revision: 23 UNIT 1 UFSAR Revision 31.0

  • The storage pattern for any of these individual modules may be as shown in this figure or Figure 9.7-3.

Title:

INTERIM STORAGE PATTERN (Checkerboard)

Sheet 1 of 1 UFSAR Figure: 9.7-4 AMERICAN ELECTRIC POWER COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN Change

Description:

UCR-1961 Revision: 23 UNIT 1 UFSAR Revision 31.0

AJ u

I

% 2saaa I

I I

I I

1 I

l/l

(;f 2aoaa F,G& g.7-5: ACCEPTABLE BURNUP DOWN IN REGIONS 2 &,3 7

July 1994 UFSAR Revision 31.0

...\\fsar-fig-9-8-1_18.dgn 12/14/2017 12:59:20 PM UFSAR Revision 31.0

fsar-fig-9-8-2.dgn 08/02/2013 10:11:39 AM UFSAR Revision 31.0

COMPRESSED AIR SYSTEM UNITS NO. 1 & 2 FSAR FIG. 9.8 - 3 NOTE:

VALVE POSITIONS ARE NOT GOVERNED BY THE UFSAR FIGURES BUT RATHER BY STATION PROCEDURES (EXCEPT VALVES WITH LOCKED OR SEALED, AND FAILURE POSITIONS AS INDICATED).

BACKUP PLANT AIR COMPRESSOR 17 REVISED PER UCR-767.

17 FSAR FIG. 9.8 - 3 UFSAR Revision 31.0

1 2

+

3 4

5 6

7 8

A t-8'6'~1::J l:l'dS::J 'ON '!>MO

    • ~,.

CROSS-TI£ TO UNIT N0.2 SEE FID. 9. 8-5

  • 7

~

... 1 \\r I

~ 4 *...

} t TURBINE OIL COOLERS FROM MT/MFPT EHC CONTROL FLUID COOLERS r

B

. ~ * - r*~

r:c..

~..

  • c 9

Dl~CHARC:.E. TUl.JNEL

+

IGSOS94 A

B

... lfsar-fig-9.8-4_27.dgn 8/16/2017 8:49:45 AM c

c D

E F

G H

K L

M r

AFTER. COOLER l

~

j LNG. 'N"'TER. FROM CONDUC.TIV ITY ROOM.

+

~TO MT/MFPT EHC CONTROL FLUID v

D E

~ATER J~CKE.T VE.NT~

CONTRDL ll. IR COMPRE.S~OR J

~~

o.

2.ND 5TN3e JNTERCOOLER7 0

0

1
.ED PUMP TURBINE LU~E
OIL COOLERS.

F.C>

OIL C.OOl.ER -

\\ '

..~pt~_,~~~-~~--Mfll-~

.~

l I ST S 1' AGE.

I\\.' ' ' lt.ITERCOOLER PLf...NT ~IR C:.OMPRE.~50R FROM STEAM' GENERATOR SLOWDOWN HEAT EXCHANGER------....

FROM CONf AINHENT

\\IENTil..ATION UNITS SEE FIG.9.8-6

' I

' 7 l

t *,.

  • I

' I

  • r

~ f'\\FTER COOLE.R I

I

~R~SS-TIE UNIT N0.2 SEE FIG.9.6-5 FROM ICE MACHINE

~

A '

A >

~

CM 1 F.C

' :; i; Ca COOLIN(. ~A. TE.R TO J CONDUCTIVITY ROOM 4

5 6

7 G

316 INCH 4 H

  • I

- CROSS-Tlf TO UNIT NO. 2 SEE FIG. ':l. B-5 (7-) NOf-.1 -E.55E.NTIAL SERVICE. 'M.&.TEA P Ut.!P!:>

12 16 TENTHS TO ICE MACHINE 1 TO DEMINERALIZED WATER

/

SYS TE.M RE.TE.NTIOf\\I TA.l\\IK. _/A~'f:8>-

10 K

TO SPARE HEADERS TO STEAM GENERATOR BLOWDOWN FLASH TANKS AND HEAT EXCHANGERS SEE FIG. 11. 5-1 TO CONTAINMENT VENTILATION UNITS +*--it---lili>~l-.1.i--l~Moll----4-~t SEE FIG. 9. 6-6 20 DUPLEX STRAINER 30 001 t

FROM CONTAINMENT CHILLED WATER SUBSYSTEM L

7

. ~

'F L;

~

~ CYCLONE

( J ( J ; ~

SEPARTORSA 7, r L '

J TO CONTAINMENT CHILLER CONDENSERS INCHES 1

M N

~*****

~

. ~

  • j 2

3 N

NOTE:

REFERENCES:

OP-1-5114 OP-1-5114A 0

1. SYSTEM LINEUr SHOWN FOR NORMAL FULL PO~ER OPERATION.

VALVE POSITIONS ARE NOT GOVERNED BY THE UFSAR FIGURES BUT RATHER BY STATION PROCEDURES (EXCEPT VALVES WJ IH LOCKED OR SEALED, AND FAILURE POSITIONS AS INDICATED}.

7 41 REVISED PER UCR* 1168, REV. I DATE NO.

DESCRIPTION APPD.

REVISIONS REFER TO DRAWING MICROFILM OR MASTER INDEX FOR APPROVAL DATES AND SIGNATURES. CCADD-RASTER)

"THIS DRAWING IS THE PROPERTY OF THE AMERICAN ELECTRIC POWER SERVICE CORP. AND IS LOANED UPON CONDITION THAT IT IS NOT TO BE REPRODUCED OR COPIED, IN WHOLE OR IN PART, DR USED FOR FUR-NISHING INFORMATION TO ANY PERSON WITHOUT THE WRITTEN CONSENT OF THE AEP SERVICE CORP,, OR FOR ANY PURPOSE DETRIMENTAL TO THEIR INTEREST, AND IS TO BE RETURNED UPON REQUEST" INDIANA MICHIGAN POWER COMPANY DONALD C. COOK NUCLEAR PLANT BRIDGMAN MICHIGAN NON-ESSENTIAL SERVICE WATER UNIT NO. 1 DWG. NO. FSAR FIG. 9.8-4 ARCH ELEC MECH STR SCALE;*

DATE;*

0£SION ENGINEERING DIVISION:

REFER TO ORIGINAL ISSUE MICROFILM FOR SIGNATURES AEP SERVICE CORP.

1 RIVERSIDE PLAZA COLUMBUS, OH 43215 0

1 2

3 4

5 6

7 8

9 UFSAR Revision 31.0

A B

c D

E F

S-8'6'DI~ l::l'1S~ 'ON '!>Ma 1

2

+

3 4

5 6

7 8

9

+

IG$0694 A

... lfsar-fig-9.8-5_27.dgn 8/16/2017 9:21:31 AM 0

It--~--- --11-t-4rcooler

"-.I --'

v. -

) - ' '

.. ~

}" - - -

x 0

r 2ND '5TAGE.

INTERC..OOLE.R

~

\\!)

rOIL COOLE.R L1sT STAGE INTERCDOLE.R A

PLANT AIR C..OMPREO::,'?OR Ff/.OM STE AM (if.:M[;P. AT-:>!"<

3LOWD0W"I Hf.AT ElCC.l-IANCIER FROM CONTATNMEN~

VENTILATION UNITS SEE FIG. 9. 8-6

' --+

' ~

' ~

' r

~ ~ta-F.C..

>-f'Q

~

TO MT /MFPT

~

EHC CONTROL CROSS-TIE TO UNIT NO. 1 SEE FIG. 9.8-4 TO STEAM GENERATOR SLOWDOWN FLASH TANKS

& HEAT EXCHANGERS SEE FIG 11.5-1

(

J FLUID COOLERS TO AUX FEEDWATER.......

~~*>x<'I-~*

PUMP BEARINGS

~

'r

'~

  • .I~

~

' r
"'°___._;i:~- CY CLONE

()

SEPARATORS

~:

7

' 7 TO CONTAINMENT VENTILATION UNITS SEE FIG 9. 8-6 0 0 1...~.----- DUPLEX STRAINER FROM CONTAINMENT

  • @Pl
  • !lo-

.t

  • ~

CHILLER EVAPORATORS B

i~ ~ tWoS\\

TO CONTAINMENT j y--...c..--J

\\.-""-1 r---t\\--r--)---i CHILLER CONDENSERS

'-....,-/'

'--.,1 c

T

'1 D

C2. l ~ON.- E55ENT1o\\L SE.R\\llCE WATER PUMP CROSS-TIE TO UNIT NO. 1 SEE FIG. 9. 6-4 E

CM l 3

4 5

6 7

G 9

F.O.

G H

K L

M N

0 TURBIN!= OIL COOLERS I

i-----------ii--;

NOTE A:

Aftercooler j k

... ~

)

See Note2 I

I I I J I I I

1. SYSTEM LINEUP SHOWN FOR NORMAL FULL POWER OPERATION. VALVE POSITIONS ARE NOT GOVF.RNED BY THE UFSAR FIGURES BUT RATHER BY STATION PROCEDURES (EXCEPT VAVLES WITH LOCKED OR SEALED, AND FAILURE POSITIONS AS INDICATED).

A rr.Fx.\\

. \\

.J

' '7 A

I I

I I

I 1-----"--

Water Jacket Vent

2. Unit 2 only.

~

ll /' '

0 J~

I

_J CROSS-TIE TO UNIT NO. 1 CONTROL AIR COMPRESSOR SEE FIG. 9.8-4

\\

~

~---*---..-----------.... ________......

(WFx\\

\\

.J (4) FEED PUMP TURBINE LUBE OIL COOLERS lV' 'f

~ ~ F.C.

~..

'J J..

,J,

' ~

I A

~

~

"'-COOLING WATER TO CONDUCTIVITY ROOM

. ~

~

FROM MT /MFPT 1"""1<5-J EHC CONTROL

( J L'.J

' ~

7 FLUID COOLERS COOLING WATER FROM CONDUCTIVITY ROOM (z.) SSA,L OIL

<;OOL.!<.R5 INTAKE TUNNEL

,I x

v 1 *

~

~1\\

I I


+:---------------...

~---~/

~---~

\\

DISCHARGE. TUNNEL 316 INCH 4 H

12 16 TENTHS 10 K

20 30 L

INCHES 1

M 2

3 N

REFERENCES; OP-2-~114 (j'-2-SUU 7 41 REVISED PER UCR-2168, REV.!

DATE NO.

DESCRIPTION REVISIONS APPD.

REFER TO DRAWING MICROFILM OR MASTER INDEX FOR APPROVAL OATES AND SIGNATURES, (GADD-RASTER)

"THIS DRAWING IS THE PROPERTY OF THE AMERICAN ELECTRIC POWER SERVICE CORP. ANO IS LOANED UPON CONDITION THAT IT IS NOT TO BE REPRODUCED OR COPIED, IN WHOLE OR IN PART, OR USED FOR FUR-NISHING INF OR MA TION TO ANY PERSON WITHOUT THE WRITTEN CONSENT OF THE AEP SERVICE: CORP., OR FOR ANY PURPOSE DETRIMENT AL TO THEIR INTEREST, AND IS TO BE RETURNED UPON REQUEST" INDIANA MICHIGAN POWER COMPANY DONALD C. COOK BRIDGMAN NUCLEAR PLANT NON ESSENTIAL SERVICE WATER UNIT NO. 2 MICHIGAN DWG. NO. FSAR FIG. 9.8-5 ARCH ELEC SCALE1

  • DATE:*

DESIGN ENGINEERING DIVISION1 MECH STR AEP SERVICE CORP.

1 RIVERSIDE PLAZA COLUMBUS, OH 43215 0

1 2

3 4

5 6

7 8

9 UFSAR Revision 31.0

fsar-fig-9.8-6_23.dgn 08/28/2010 12:59:34 PM UFSAR Revision 31.0

fsar-fig-9.8-7_21-2.dgn 3/7/2008 10:52:05 AM UFSAR Revision 31.0

...\\UCR-2088\\FSAR-FIG-9-9-1.27 12/10/2015 10:04:14 AM UFSAR Revision 31.0

COMPONENT COOLING PUMP AREA SKETCH "D-9" COMPONENT COOLING PUMP AREA VENTILATION SYSTEM NOTE:

VALVE POSITIONS ARE NOT GOVERNED BY THE UFSAR FIGURES BUT RATHER BY STATION PROCEDURES (EXCEPT VALVES WITH LOCKED OR SEALED, AND FAILURE POSITIONS AS INDICATED).

FSAR FIG. 9.9 - 2 AUXILIARY BUILDING VENTILATION UNITS NO. 1 & 2 SHEET 2 OF 2 Revised per A) UCR-295 B) UCR-1482 17 F.C.

F.C.

17 A

B 17 OP-12-5148 F.O.

F.O.

1 OF 3 SETS F.C.

F.C.

17 B

B 17 UFSAR Revision 31.0

1 2

+

3 4

5 6

7 a

9

+

A l-OL'6 '~l::l !:1'1S::J *oN '9Ma IGS0694 A

HUMIDIFIER PACKAGE FSAR-FIG-9. 10-1_27.0GN 7/28/2015 9:10:53 AM 6

2 STAGE ELECTRIC BL/lo.ST COIL 6

c Rl:TIJRIJ 1'0 ESSC'.NTIAL SEP.VICI!"

w.o.re.it

\\AIR CONDITIONING UNIT

\\

D CHARGtNG BOTTLE CHILLED WATER f'uMp LIQUID CHILLER PACKAGE FROM ESSENTIAL SERVICE WATER HEADER TO CONTROL ROOM I

I I

~

AIR DISTR!BUT\\0111 SY5TEM

~\\_To COMPU1"ER RM.

c D

l

  • I
  • I.

I.

I

  • I
  • I i

l l

E F

NORTH VENT-

{

EXPANSION TANK

,----'--~,.._... Ji r-Sl C:.H T GLASS

~PRESS

/

REDUCING VALVE 1-ro CONTROL ROOM

...,.,-MA\\([ UP WATER.

SOUTH E

CM !

2 3

4 5

6 7

G G

'J>:

. r:>!i 4*t>

t> <:i
\\' C>

.. '[>

'ti t>.

2 FANS H

> 'v x

x x

x y

> ~

x >

x x

> ~

~

x x

COt-iTROL ROOM PRE5SURIZER UNIT FROM J CONTROL ROOM UNIT 1 316 INCH 4 H

12 16 K

I I

I v--

v-.

F.A.I.

Bubble Tight Butterfly Damper I (Typ.)

~RETURNAIR

~

~

FROM HVAC

... cs.t I EQUIPMENT Rb OM F.A.I.

F.A.I.

TENTHS I

__---~- REIURN AIR I

.._/'-

V' Q! I°'

UI ~

De'

[k: llll

~ <(

4' 111 l1l 1111~

_J (I)

({) l!!l

({) ~

~ ~

eliii

~...

-18 10 K

20 FR OM CONTROL ROOM.

30 L

M L

INCHES 1

M 2

3 N

SYMBOLS MAh!UA.l VOLUME DAMPER 0

(J NflRMAll Y OPEN DAMPER JI NORMALLY CLOSED DAMPER

_,...tL BACK DRAFT

~DAMPER

~

I

~

~

ROUGHING OR PRE.FILTER Aii1!.SOLUTE FILTER CHARCOAL FILTE~

CHILLED WATER COIL CON.TROL OFF Rl:FRlGERANT LINE' TEMPERATURE OR PRESSURE ELECTRIC BLAST COIL HEATER NOTE:

VALVE POSITIONS ARE NOT GOVERNED BY THE UFSAR FIGURES BUT RATHER BY STATION PROCEDURES (EXCEPT VALVES WITH LOCKED OR SEALED, AND FAILURE POSITIONS AS INDICATED).

N

REFERENCES:

OP-1 (2)-5149 7.o REVISED PER UCR-2057, REV.O DATE NO.

DESCRIPTION REVISIONS REFER TO DRAWING MICROFILM OR MASTER INDEX FOR APPROVAL OATES AND SIGNATURES. CCADD-RASTERl APPO.

"THIS DRAWING IS THE PROPERTY OF THE AMERICAN ELECTRIC POWER SERVICE CORP. AND IS LOANED UPON CONDITION THAT IT IS NOT TO BE REPRODUCED OR COPIED, IN WHOLE OR IN PART, OR USED FOR FUR~

NISHING INFORMATION TO ANY PERSON WITHOUT THE WRITTEN CONSENT OF THE AEP SERVICE CORP., OR FOR ANY PURPOSE DETRIMENTAL TO THEIR INTEREST, AND IS TO SE RETURNED UPON REQUEST" INDIANA MICHIGAN POWER COMPANY DONALD C. COOK BRIDGMAN NUCLEAR PLANT CONTROL ROOM VENTILATION UNIT N0.1 MICHIGAN DWG.NO. FSAR FIG. 9.10-1 ARCH ELEC SCALE*.

DATE;*

DESIGN EN6It£ERING OMSION:

MECH STR DR*.

AEP SERVICE CORP.

1 RIVERSIDE PLAZA COLUMBUS, OH 43215 0

1 2

3 4

5 6

a 9

UFSAR Revision 31.0

...\\FSAR-FIG-9.10-2.26 2/3/2015 4:20:27 PM UFSAR Revision 31.0