MONTHYEARML24100A8062024-04-0909 April 2024 Duke Energy Sites Annual Assessment Meeting Presentation Slides April 23, 2024 ML23341A1522023-12-0707 December 2023 December 11, 2023 Public Meeting - RIPE Exemption Request - Licensee Slides ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22153A3842022-06-0606 June 2022 Duke Energy Presentation Material for June 6, 2022 Public Meeting on GSI-191 Closeout ML22091A1332022-04-0101 April 2022 Bru Har Combined 2021 Assessment Meeting Slides ML20100G6342020-04-0909 April 2020 Revised- Bru 2019 Annual Assessment Meeting Slides ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML19077A3672019-03-14014 March 2019 March 14, 2019 Pre-submittal Meeting TS DNBR Safety Limit Change LAR Meeting Slides ML18351A1342018-12-20020 December 2018 December 20, 2018 Pre-submittal Meeting Slides for Escw Risk-Informed LAR ML18333A1822018-11-0808 November 2018 Pre-Submittal Meeting - November 8, 2018 - License Amendment Request for Shearon Harris Nuclear Power Plant Emergency Plan Revision ML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 ML17250B2382017-08-30030 August 2017 TMRE Presubmittal NRC ML17044A0892017-03-0202 March 2017 EDG SR Presubmittal Meeting March 2, 2017 ML16267A0292016-09-29029 September 2016 SFP Pre-Submittal Meeting Slides - BWR Storage Rack Inserts, Updated NCS Analysis at Harris Nuclear Plant ML16112A2932016-05-0202 May 2016 05/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444) RA-15-0041, Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted)2015-09-18018 September 2015 Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted) ML14129A3352014-05-0909 May 2014 Summary of Category 1 Public Meeting - Annual Assessment of Shearon Harris Nuclear Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13212A3372013-07-31031 July 2013 NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting NEI 01-01, NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting2013-07-31031 July 2013 NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting NEI 01-01, 7/31/2013 NRC Public Meeting Presentation on NEI 01-012013-07-30030 July 2013 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 ML13218B3372013-07-30030 July 2013 Handout for 7/30/13 Conference Call Re. Harris Emergency Response Facility Activation Timeliness and Criteria ML13211A3782013-07-30030 July 2013 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 ML13204A2562013-07-0909 July 2013 Handout - LOOP Voltage Setpoint Change Presubmittal Conference Call - July 9, 2013 ML13170A3352013-06-13013 June 2013 Presentation - NRC Special Inspection Meeting - Harris Reactor Pressure Vessel ML12277A0272012-10-0202 October 2012 Slides - Summary of Meeting with Duke Energy Carolinas to Discuss Noncenservative Technical Specifications License Amendment Requests ML12242A4322012-08-28028 August 2012 Summary of Category 1 Public Meeting - Regulatory Conference and Predecisional Enforcement Conference ML12206A3252012-08-0707 August 2012 G20120513/EDATS: OEDO-2012-0436 - Briefing Book for Meeting with Duke Energy on August 7, 2012 ML12188A0712012-07-11011 July 2012 G20120473/ EDATS: OEDO-2012-0404 - Briefing Book - Briefing Package for Meeting with Duke Energy on July 11, 2012 ML12107A0012012-04-16016 April 2012 Meeting Summary - Category 1 Public Meeting - Annual Assessment of Shearon Harris Nuclear Plant ML11354A3782012-02-0808 February 2012 Meeting Handout - Meeting with Carolina Power and Light Suggested Discussion Items Regarding Realistic Large Break Loss-of-Coolant Accident HNP-12-028, Realistic LBLOCA Question Response Meeting Handout, Enclosure 3 to HNP-12-0282012-01-11011 January 2012 Realistic LBLOCA Question Response Meeting Handout, Enclosure 3 to HNP-12-028 ML12076A1652012-01-11011 January 2012 Meeting Slides - Harris Realistic LBLOCA Question Response Meeting ML1118011132011-06-29029 June 2011 NRC Staff Response to NFPA 805 Transition FAQ 10-0059, Revision 1 ML1113704082011-05-0909 May 2011 Meeting Slides Regarding Human Performance Improvement ML1107301382011-04-21021 April 2011 February 22, 2011, Summary of Pre-application Meeting with Carolina Power & Light and Representatives Regarding Upcoming BWR Boraflew License Amendment Request W/ Public Meeting Slides ML1111000242011-04-20020 April 2011 Meeting Summary - Shearon Harris - List of Attendees ML1014102712010-05-18018 May 2010 Shearon Harris Nuclear Plant Annual Assessment Meeting Slides ML0922900342009-08-17017 August 2009 08/19/09-Meeting Slides for 11th International Seminar on Fire Safety in Nuclear Power Plants and Installations, Risk-Informed, Performance-Based Fire Protection: a U.S. Regulatory Perspective ML0916605042009-06-24024 June 2009 04/21-22/2009 Summary of Category 2 Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition Shearon, Unit 1 and Oconee to NFPA 805 ML0904906122009-02-18018 February 2009 NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, February, 2009 ML0829601532008-11-17017 November 2008 Summary of Meeting with Progress Energy Carolinas, Inc., to Discuss Shearon Harris Unit 1 National Fire Protection Association Standard 805 License Amendment Request ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit ML0820703912008-07-17017 July 2008 Meeting Handouts from 7/17/08 Public Meeting on the Harris and Oconee LARs to Transition to NFPA-805 M080717, M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection2008-07-17017 July 2008 M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection ML0818407352008-06-20020 June 2008 NFPA-805 Workshop Handouts - Harris Fire PRA Lessons Learned ML0818407312008-06-20020 June 2008 NFPA-805 Workshop Handouts - Harris NFPA-805 Results and Lessons Learned ML0812003342008-04-17017 April 2008 NFPA 805 Transition Pilot Plant FAQ Log - April 2008 2024-04-09
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24100A8062024-04-0909 April 2024 Duke Energy Sites Annual Assessment Meeting Presentation Slides April 23, 2024 ML23341A1522023-12-0707 December 2023 December 11, 2023 Public Meeting - RIPE Exemption Request - Licensee Slides ML23114A0672023-04-26026 April 2023 April 26 2023 Public Meeting - RIPE LAR - Licensee Slides ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22153A3842022-06-0606 June 2022 Duke Energy Presentation Material for June 6, 2022 Public Meeting on GSI-191 Closeout ML22109A2122022-04-20020 April 2022 Duke Energy Pre-Submittal Public April 20, 2022, Meeting Presentation ML22091A1332022-04-0101 April 2022 Bru Har Combined 2021 Assessment Meeting Slides ML21322A3262021-11-29029 November 2021 Duke Energy November 29, 2021 Pre-Submittal Public Meeting Slides for EOF Relocation Licensing Amendment Request ML20100G6342020-04-0909 April 2020 Revised- Bru 2019 Annual Assessment Meeting Slides ML20099D1282020-04-0808 April 2020 Bru 2019 Mtg Slides ML20099C9992020-04-0808 April 2020 Har 2019 Mtg Slides ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19233A0462019-08-21021 August 2019 Presentation: Harris/Nrc Pre-submittal Meeting: Risk-Informed Completion Times, August 22, 2019 ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML19123A3522019-05-0202 May 2019 Public Meeting Summary - Shearon Harris Nuclear Plant, Docket No. 50-400 ML18351A1342018-12-20020 December 2018 December 20, 2018 Pre-submittal Meeting Slides for Escw Risk-Informed LAR ML18333A1822018-11-0808 November 2018 Pre-Submittal Meeting - November 8, 2018 - License Amendment Request for Shearon Harris Nuclear Power Plant Emergency Plan Revision ML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 ML17318A1592017-11-0808 November 2017 Meeting Slides - November 8, 2017 Teleconference with NEI Concerning Feedback on Tornado Missile Risk Evaluator Methodology -Final ML17200C7802017-07-19019 July 2017 Duke Energy Pre-submittal Meeting Presentation, August 3, 2017, Harris and Robinson License Amendment Request to Support the Transition to Duke Non-LOCA Analysis Methods, MF9824, MF9825 ML16267A0292016-09-29029 September 2016 SFP Pre-Submittal Meeting Slides - BWR Storage Rack Inserts, Updated NCS Analysis at Harris Nuclear Plant ML16112A2932016-05-0202 May 2016 05/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444) ML14129A3352014-05-0909 May 2014 Summary of Category 1 Public Meeting - Annual Assessment of Shearon Harris Nuclear Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. NEI 01-01, NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting2013-07-31031 July 2013 NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting ML13212A3372013-07-31031 July 2013 NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting NEI 01-01, 7/31/2013 NRC Public Meeting Presentation on NEI 01-012013-07-30030 July 2013 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 ML13211A3782013-07-30030 July 2013 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 ML13204A2562013-07-0909 July 2013 Handout - LOOP Voltage Setpoint Change Presubmittal Conference Call - July 9, 2013 ML13170A3352013-06-13013 June 2013 Presentation - NRC Special Inspection Meeting - Harris Reactor Pressure Vessel ML12277A0272012-10-0202 October 2012 Slides - Summary of Meeting with Duke Energy Carolinas to Discuss Noncenservative Technical Specifications License Amendment Requests ML12242A4322012-08-28028 August 2012 Summary of Category 1 Public Meeting - Regulatory Conference and Predecisional Enforcement Conference ML12076A1652012-01-11011 January 2012 Meeting Slides - Harris Realistic LBLOCA Question Response Meeting HNP-12-028, Realistic LBLOCA Question Response Meeting Handout, Enclosure 3 to HNP-12-0282012-01-11011 January 2012 Realistic LBLOCA Question Response Meeting Handout, Enclosure 3 to HNP-12-028 ML11354A2912011-12-13013 December 2011 Meeting Slides - Meeting with Carolina Power and Light Discussion of ANP-3011 ML1113704082011-05-0909 May 2011 Meeting Slides Regarding Human Performance Improvement ML1107301382011-04-21021 April 2011 February 22, 2011, Summary of Pre-application Meeting with Carolina Power & Light and Representatives Regarding Upcoming BWR Boraflew License Amendment Request W/ Public Meeting Slides ML1111000262011-04-20020 April 2011 Meeting Summary - Shearon Harris - Slide Presentation ML1014102712010-05-18018 May 2010 Shearon Harris Nuclear Plant Annual Assessment Meeting Slides ML0922900342009-08-17017 August 2009 08/19/09-Meeting Slides for 11th International Seminar on Fire Safety in Nuclear Power Plants and Installations, Risk-Informed, Performance-Based Fire Protection: a U.S. Regulatory Perspective ML0916605042009-06-24024 June 2009 04/21-22/2009 Summary of Category 2 Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition Shearon, Unit 1 and Oconee to NFPA 805 ML0915905552009-06-0505 June 2009 Summary of Category 1 Public Meeting to Discuss Annual Assessment of Shearon Harris Nuclear Plant, Unit 1 ML0829601532008-11-17017 November 2008 Summary of Meeting with Progress Energy Carolinas, Inc., to Discuss Shearon Harris Unit 1 National Fire Protection Association Standard 805 License Amendment Request ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit ML0820703912008-07-17017 July 2008 Meeting Handouts from 7/17/08 Public Meeting on the Harris and Oconee LARs to Transition to NFPA-805 M080717, M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection2008-07-17017 July 2008 M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection ML0818407312008-06-20020 June 2008 NFPA-805 Workshop Handouts - Harris NFPA-805 Results and Lessons Learned ML0818407352008-06-20020 June 2008 NFPA-805 Workshop Handouts - Harris Fire PRA Lessons Learned ML0815502662008-05-20020 May 2008 Harris Slides, NRC Annual Assessment Meeting 2024-04-09
[Table view] |
Text
Harris Nuclear Plant Pre-Submittal Meeting - December 20, 2018 License Amendment Request for Extension of the Essential Services Chilled Water System Allowed Outage Time 2
Duke Energy Participants Sarah McDaniel, HNP Regulatory Affairs Russ Andrews, HNP Engineering Paul Farish, Corporate PRA Richard Howard, HNP Operations 3
Agenda Essential Services Chilled Water System (ESCWS) Allowed Outage Time (AOT)
Extension from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 7 days I. Description
- System Design and Operation
- Description of Change II. Technical Evaluation III. Conclusion 4
System Design and Operation ESCWS Chiller Package Condenser Service Water Recirculating Pump (oil lubricated)
Hot Gas Bypass Valve Chilled Water Pump 5
System Design and Operation 6
System Design and Operation Condenser Evaporator 7
System Design and Operation ESCWS provides chilled water to the cooling coils of air handling units for:
- Control Room Air Conditioning System
- Reactor Auxiliary Building ESF Equipment Cooling System
- Reactor Auxiliary Building Switchgear Rooms Ventilation System 8
System Design and Operation ESCWS also provides chilled water to the cooling coils of air handling units for:
- Reactor Auxiliary Building Electrical Equipment Protection Rooms Ventilation System
- Reactor Auxiliary Building Non-Nuclear Safety-Ventilation System
- Fuel Handling Building Spent Fuel Pool Pump Room Ventilation System 9
Reason for Change Refrigerant replacement for the following:
Unisolable compressor oil system leakage Excessive refrigerant leakage Excessive hot gas bypass valve leakby Evaporator/condenser tube leaks Certain compressor issues Other activities, such as opening and cleaning the ESCWS condenser tubes due to service water fouling, replacement of the ESCWS compressor motor due to electrical fault, and refurbishment of an air handling unit supported by the ESCWS, may necessitate a 7-day AOT.
Installation of planned ESCWS modification activities 10
Description of Change The proposed license amendment revises:
TS 3.7.13, Essential Services Chilled Water System - replace 72-hour AOT with 7-day AOT for an inoperable train and adds the note below to TS Action Statements for:
TS 3.1.2.4, Charging Pumps - Operating TS 3.5.2, ECCS Subsystems - Tavg Greater Than or Equal To 350°F TS 3.6.2.1, Containment Spray System TS 3.6.2.3, Containment Cooling System TS 3.7.4, "Emergency Service Water System," that would apply to the B train only Note: One Train of [Applicable TS or TS System] is allowed to be inoperable for a total of 7 days to allow for maintenance on the Essential Services Chilled Water System and air handlers supported by the Essential Services Chilled Water System. Prior to exceeding 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, the compensatory measures described in TS Bases 3.7.13 shall be implemented.
11
Technical Evaluation General Design Criteria:
GDC-2: Design Basis for Protection Against Natural Phenomena GDC-5: Sharing of structures, systems, and components GDC-44: Cooling Water GDC-45: Inspection of cooling water system GDC-46: Testing of cooling water system RG 1.174, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis" RG 1.177, "An Approach for Plant Specific, Risk Informed Decisionmaking: Technical Specifications" 12
Technical Evaluation Regulatory Guide 1.174 provides guidelines on delta CDF and delta LERF values.
The 7-day AOT entry has a delta CDF that is less than 1.0x10-6 per year.
The 7-day AOT entry has a delta LERF that is less than 1.0x10-7 per year.
Regulatory Guide 1.177, Section 2.4: An ICCDP of less than 1.0x10-6 and an ICLERP of less than 1.0x10-7 are considered small for a single TS condition entry.
PRA analysis results conclude that anytime the 7-day AOT is entered, the ICCDP is 2.0x10-8 and the ICLERP is 3.0x10-10.
13
Technical Evaluation Compensatory Measures:
Air handlers that support the operable Charging Safety Injection Pump (CSIP) Rooms and Switchgear Rooms and the operable ESCWS chiller will be posted protected.
The Fire Protection tracking log will be reviewed for fire hazards and fire impairments.
Transient combustibles and hot work in fire risk-sensitive areas will be limited.
Restrictions on work activities will be in place that involve components that if lost or failed could result in a plant trip or transient.
Operator actions for the CSIP area cooling, Switchgear Room cooling, and Auxiliary Relay Panel Room cooling, if needed following a loss of HVAC, will be briefed with Operations.
The fan used for the CSIP area cooling will be pre-staged and verified to be functional.
Outages of equipment will be limited or avoided on the operable ESCWS train, Motor-Driven and Turbine-Driven Auxiliary Feedwater Pumps, Service Water System, Emergency Diesel Generators, Alternate Seal Injection System, & Dedicated Shutdown Diesel Generator System.
14
Technical Evaluation Evaluation of Safety Margins Design Operation Safety Analysis Configuration Risk Management Maintenance Rule Program Work Management and Execution Procedure Guidance Computer Risk Tool 15
Precedents The following two LARs are examples of plants that have extended allowed outage times for TS systems from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 7 days:
Crystal River Unit 3, 2008 -Extension of Allowed Outage Time to 7 Days for an inoperable Low Pressure Injection Train, Reactor Building Spray Train, Decay Heat Closed Cycle Cooling Water Train, and Decay Heat Seawater Train Oconee, 2003 -Extension of Allowed Outage Time for an Inoperable Low Pressure Injection Train from 72 Hours to 7 Days 16
Conclusion The proposed change will allow plant personnel to complete more types of maintenance activities on the ESCWS and its supported air handlers for equipment reliability.
The proposed change follows the risk guidelines of Regulatory Guides 1.174 and 1.177 and represents an insignificant impact on average annual plant risk.
The proposed change continues to provide adequate protection to public health and safety.