Errata Letter for Shearon Harris Nuclear Plant - NRC Temporary Instruction 2515/186 Inspection Report 05000400-13-404
ML13339A514
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/05/2013
From: Eugene Guthrie
Division of Reactor Safety II
To: Hamrick G
Carolina Power & Light Co
References
IR-13-404
Download: ML13339A514 (4)


Text

ber 5, 2013

SUBJECT:

ERRATA LETTER FOR SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 251 5/186 INSPECTION REPORT 05000400/2013404

Dear Mr. Hamrick:

On October 31, 2013, the US Nuclear Regulatory Commission (NRC) issued the subject inspection report for the Shearon Harris Nuclear Plant using Temporary Instruction 2515/186 (ML13305B047). In reviewing this report, we identified an administrative error regarding the incorrect inspection report number. The correct report number should be 05000400/2013406 instead of 05000400/2013404. Please make the appropriate pen and ink change in the subject report to reflect the correction. We apologize for any inconvenience caused.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this letter, please contact me at (404) 997-4662.

Sincerely,

/RA: Malcolm T. Widmann for/

Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety

Docket No.: 50-400 License No.: NPF-63

cc: (See page 2)

_ML13339A514_______________ x SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME DLANYI EGUTHRIE DATE 12/4/2013 12/5/2013 12/ /2013 12/ /2013 12/ /2013 12/ /2013 12/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc: Lara S. Nichols Deputy General Counsel Duke Energy Corporation 550 S. Tyron Street

Mail Code DEC45A

Charlotte, NC 28202

Ernest J. Kapopoulos Jr.

Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant

5413 Shearon Harris Road

New Hill, NC 27562 R. Keith Holbrook

Manager, Support Services Shearon Harris Nuclear Power Plant

5413 Shearon Harris Road New Hill, NC 27562

Terrence E. Slake

Manager Nuclear Plant Security Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562

Progress Energy Carolinas, Inc.

ATTN: Mr. Donald L. Griffith Training Manager Harris Energy & Env. Center Shearon Harris Nuclear Power Plant P.O. Box 327, State Road 1127

New Hill, NC 27562-0165

Letter to George from Eugene F. Guthrie dated December 5, 2013.

SUBJECT: ERRATA LETTER FOR SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 251 5/186 INSPECTION REPORT 05000400/2013404 Distribution:

RidsNrrPMShearonHarris Resource C. Evans, RII EICS L. Douglas, RII EICS