ML111290733
ML111290733 | |
Person / Time | |
---|---|
Site: | San Onofre |
Issue date: | 05/05/2011 |
From: | Mark Haire Operations Branch IV |
To: | Peter Dietrich Southern California Edison Co |
References | |
50-361/11-301, 50-362/11-301 | |
Download: ML111290733 (5) | |
See also: IR 05000361/2011301
Text
May 5, 2011
Mr. Peter Dietrich Senior Vice President and Chief Nuclear Officer
Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128
SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000361/2011301; 05000362/2011301
Dear Mr. Dietrich:
In a telephone conversation on April 19, 2011, between Messrs. Bill Arbour, Operations Training Manager, and Brian Larson, Chief Examiner, arrangements were made for the administration of licensing examinations at San Onofre Nuclear Generating Station during the week of October 31, 2011.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by July 25, 2011. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by August 29, 2011. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations, an authorized representative
of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of
September 12, 2011.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
Mr. Peter Dietrich - 2 -
your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public
Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Arbour has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Larson at 817-860-8172, or myself at 817-860-
8159. Sincerely,
/RA/
Mark Haire, Chief Operations Branch Division of Reactor Safety
Mr. Peter Dietrich - 3 -
Dockets: 50-361; 50-362 Licenses: NPF-10; NPF-15
cc: Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, CA 92101
Gary L. Nolff Assistant Director-Resources City of Riverside 3900 Main Street Riverside, CA 92522
Mark L. Parsons Deputy City Attorney City of Riverside 3900 Main Street Riverside, CA 92522
Gary H. Yamamoto, P.E., Chief Division of Drinking Water and Environmental Management 1616 Capitol Avenue, MS 7400
P.O. Box 997377 Sacramento, CA 95899-7377
Michael L. DeMarco San Onofre Liaison
San Diego Gas & Electric Company 8315 Century Park Ct. CP21C San Diego, CA 92123-1548
Director, Radiological Health Branch
State Department of Health Services P.O. Box 997414 (MS 7610) Sacramento, CA 95899-7414
The Mayor of the City of San Clemente 100 Avenida Presidio San Clemente, CA 92672
James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 34) Sacramento, CA 95814
Mr. Peter Dietrich - 4 -
Douglas K. Porter, Esquire Southern California Edison Company 2244 Walnut Grove Avenue
Rosemead, CA 91770
Doug Bauder Southern California Edison Company San Onofre Nuclear Generating Station
P.O. Box 128 San Clemente, CA 92674-0128
Steve Hsu Department of Health Services Radiologic Health Branch MS 7610, P.O. Box 997414
Sacramento, CA 95899-7414
R. St. Onge Southern California Edison Company San Onofre Nuclear Generating Station
P.O. Box 128 San Clemente, CA 92674-0128
Chief, Technological Hazards Branch FEMA Region IX
1111 Broadway, Suite 1200 Oakland, CA 94607-4052
Institute of Nuclear Power Operations (INPO) Records Center
700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339
Mr. Peter Dietrich - 5 -
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Vacant) Senior Resident Inspector (Greg.Warnick@nrc.gov) Resident Inspector (John.Reynoso@nrc.gov)
Branch Chief, DRP/D (Ryan.Lantz@nrc.gov) Acting Senior Project Engineer, DRP/D (Gerond.George@nrc.gov) SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov) Project Engineer, DRP/D (Peter.Jayroe@nrc.gov) Project Engineer, DRP/D (Zachary.Hollcraft@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Randy.Hall@nrc.gov) Branch Chief, DRS/TSB (Michael.Hay@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource RIV/ETA:OEDO (Stephanie.Bush-Goddard@nrc.gov) DRS/TSB STA (Dale.Powers@nrc.gov)
SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials BTL Publicly Avail Yes No Sensitive Yes No Sens. Type Initials BTL SOE:OB C:OB BTLarson MHaire /RA/ /RA/ 5/5/11 5/5/11 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax