NRC Security Inspection Report 05000400/2011402
ML112070681
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/22/2011
From: Ernstes M
NRC/RGN-II/DRS/PSB2
To: Jefferson W
Carolina Power & Light Co
References
IR-11-402
Download: ML112070681 (4)


Text

uly 22, 2011

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - NRC SECURITY INSPECTION REPORT 05000400/2011402

Dear Mr. Jefferson:

On June 10, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a security

baseline inspection at your Shearon Harris Nuclear Power Plant, Unit 1. The inspection

covered one or more of the key attributes of the security cornerstone of the NRC's Reactor

Oversight Process. The enclosed report documents the inspection results which were

discussed with Mr. J. Warner and other members of your staff. A re-exit was conducted on

June 30, 2011, with Mr. J. Caves and another staff member. A final re-exit was conducted with

Mr. M. Wallace on July 14, 2011.

This inspection examined activities conducted under your license as they relate to security, and compliance with the Commission

=s rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified. However, two

licensee-identified violations which were determined to be of very low safety significance, are

listed in this report. The NRC is treating these violations as a non-cited violation (NCV)

consistent with Section 2.3.2, of the NRC Enfo rcement Policy because of the very low safety significance of the violation, and because they were entered into your corrective actions

program. If you contest these non-cited violations, you should provide a response within 30

days of the date of this inspection report, with the basis of your denial, to the Nuclear

Regulatory Commission, Administrator, Region II; the Director, Office of Enforcement, United

States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident

Inspector at the Shearon Harris Nuclear Station.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) co mponent of NRC's document system, ADAMS. - SECURIT Y-RELATED INFORMATION CP&L 2 ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns

contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter

=s enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensur e that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC

=s document system, ADAMS. If Safeguards Inform ation is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark

your entire response A Security Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).

Sincerely,

/RA/

Michael E. Ernstes, Chief Plant Support Branch 2

Division of Reactor Safety

Docket No.: 50-400 License No.: NPF-63

Enclosure:

Inspection Report 05000400/2011402

w/Attachment Supplemental Information (OUO)

cc w/encl: (See page 3)

ML112070681 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII: DRS RII: DRS RII: DRS RII: DRS RII: DRS RII: DRP SIGNATURE RA RA RA RA RA RA NAME A. True J. Wallo I. Hall R. Patterson M. Ernstes R. Musser DATE 06/20/2011 07/14/2011 07/14/2011 07/21/2011 07/21/2011 07/21/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO - SECURIT Y-RELATED INFORMATION CP&L 3 cc w/Encl:

Ernest J. Kapopoulos Jr.

Plant General Manager

Carolina Power and Light Company

Shearon Harris Nuclear Power Plant

5413 Shearon Harris Road

New Hill, NC 27562

Manager Support Services (Vacant)

Shearon Harris Nuclear Power Plant

Progress Energy

5413 Shearon Harris Road

New Hill, NC 27562

David H. Corlett

Supervisor

Licensing/Regulatory Programs

Progress Energy

P.O. Box 165, Mail Code: Zone 1

New Hill, NC 27562-0165

Joseph W. Donahue

Vice President

Nuclear Oversight

Progress Energy

TPP-15 100 E. Davie Street

Raleigh, NC 27601

Kelvin Henderson

General Manager

Nuclear Fleet Operations

Progress Energy

TPP-15 100 E. Davie Street

Raleigh, NC 27601

Edward T. O'Neil

Director Nuclear Protective Service and Emergency

Preparedness

Progress Energy

TPP-15 100 East Davie Street

Raleigh, NC 27601

Terrence E. Slake

Manager Nuclear Security

Shearon Harris Nuclear Power Plant

5413 Shearon Harris Road

New Hill, NC 27562