ML12320A314

From kanterella
Revision as of 13:25, 22 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Acceptance Review Results Regarding Enhancements to Diesel Generator Surveillance Requirements License Amendment Request (ME9832 and ME9833)
ML12320A314
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 11/14/2012
From: Nadiyah Morgan
Plant Licensing Branch 1
To: Furio P
Calvert Cliffs
Morgan N
References
TAC ME9832, TAC ME9833
Download: ML12320A314 (1)


Text

From:Morgan, Nadiyah To:Furio, Patricia S

Subject:

Acceptance Review Results Regarding Enhancements to Diesel Generator Surveillance Requirements LicenseAmendment Request (ME9832 and ME9833)

Date:Wednesday, November 14, 2012 3:07:00 PM

Pat,

By letter dated October 16, 2012, Calvert Cliffs Nuclear Power Plant, LLC submitted a license amendment request (LAR) for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and2. The purpose of this e-mail is to provide the results of the Nuclear Regulatory Commission (NRC) staff's acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment.

Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Thanks,

Nadiyah S. Morgan Calvert Cliffs Project Manager, NRR Nuclear Regulatory Commission (301) 415-1016 Nadiyah.Morgan@NRC.GOV