Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARML16266A0862016-09-22022 September 2016 License Amendment Request - Control Room Emergency Ventilation System Project stage: Request ML16306A4712016-11-0202 November 2016 Acceptance Review License Amendment Request - Control Room Emergency Ventilation System Project stage: Acceptance Review ML16315A1122016-11-10010 November 2016 Supplement to License Amendment Request - Control Room Emergency Ventilation System Project stage: Supplement ML17075A0152017-03-16016 March 2017 E-mail from R. Guzman to E. Villar - Calvert Cliffs Unit Nos. 1 and 2 - Request for Additional Information License Amendment Request - Control Room Emergency Ventilation System Project stage: RAI ML17081A3032017-03-22022 March 2017 Response to Request for Additional Information to License Amendment Request - Control Room Emergency Ventilation System Project stage: Response to RAI ML17209A6202017-08-30030 August 2017 Issuance of Amendments Control Room Recirculation Signal and Control Room Emergency Ventilation System Technical Specifications Project stage: Approval 2016-09-22
[Table View] |
|
---|
Category:Acceptance Review Letter
MONTHYEARML21281A1402022-01-14014 January 2022 Acceptance for Review of Proposed Alternative ISI-05-018 for Examinations of Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles ML21152A1232021-06-0101 June 2021 Acceptance for Review of Proposed Alternative ISI-05-016 Involving Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (EPID L-2021-LLR-0037) (Email) ML21077A1772021-04-0808 April 2021 Withdrawal of Requested Exemption from Certain Requirement in 10 CFR 50.55a (Epids L-2021-LLE-0014, 0015, & 0016) ML20015A4992020-01-15015 January 2020 Acceptance of Requested Licensing Action Emergency Diesel Generator Surveillance Requirements for Frequency and Voltage Tolerances ML18304A1392018-10-30030 October 2018 Acceptance of Requested Licensing Action Risk-Informed Approach to Closure for Generic Safety Issue-191 (EPID L-2018-LLA-0222 and EPID L-2018-LLE-0013) ML18271A1372018-09-28028 September 2018 Acceptance of Requested Licensing Action Re Amendment to Relocate Emergency Operations Facility and Joint Information Center ML18124A3162018-05-0404 May 2018 Acceptance of Requested Licensing Action Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML17192A1752017-07-11011 July 2017 Plants, Units 1 and 2; Calvert Cliffs Independent Spent Fuel Storage Installation; Nine Mile Point Nuclear Station, Units 1 and 2; R. E. Ginna - Acceptance of License Amendment Request to Revise Emergency Action Level Schemes ML16326A2682016-11-21021 November 2016 2016/11/21 E-mail from R.Guzman to E.Villar - Acceptance Review Determination - Control Room Emergency Ventilation System LAR ML16306A4712016-11-0202 November 2016 Acceptance Review License Amendment Request - Control Room Emergency Ventilation System ML16091A4842016-03-30030 March 2016 2016/03/30 E-mail from R.Guzman to E.Villar - Acceptance Review Determination LAR to Revise TSs to Adopt Risk-Informed Completion Times TSTF-505, Rev 1 (MF7415, MF7416) ML14300A2202014-10-23023 October 2014 NRR E-mail Capture - Acceptance Review Results Regarding the Calvert Cliffs Containment Leakage Rate Testing Program License Amendment Request (MF4898-99) ML13101A1702013-04-0808 April 2013 MF0617 & MF0618 - Acceptance Review E-mail to Licensee - After Supplemental Information ML13031A3162013-01-31031 January 2013 E-mail - Acceptance Review Results Re Relief Request RR-ISI-04-08 Saltwater Piping Repair ML12320A3142012-11-14014 November 2012 Acceptance Review Results Regarding Enhancements to Diesel Generator Surveillance Requirements License Amendment Request (ME9832 and ME9833) ML1204500382012-02-14014 February 2012 Acceptance Review for Calvert Cliffs RR-ISI-04-06 and RR-ISI-04-07 ML1201100172012-01-10010 January 2012 Acceptance Review for Calvert Cliffs TAC Nos. ME7672 & ME7673 ML1124404592011-09-0101 September 2011 Acceptance Review of Calvert Cliffs Amendment Application (TAC Nos. ME6831-ME6832) ML1122800522011-08-16016 August 2011 Acceptance Review for Proposed Exemption (TAC Nos. ME6738/9) ML1114508612011-05-25025 May 2011 Acceptance Review for Calvert Cliffs TACs ME6250/ME6251 ML1105500872011-02-24024 February 2011 Acceptance Review for Calvert Cliffs TAC Nos. ME5424/ME5425 ML1105500792011-02-24024 February 2011 Acceptance Review for Calvert Cliffs TAC No. ME5423 ML1030900292010-11-0505 November 2010 Acceptance Review for Calvert Cliffs TAC Nos. ME4892 and ME4893 ML1029404192010-10-21021 October 2010 E-mail Acceptance Review for Calvert Cliffs Cilrt Extension Request ML1020900502010-07-28028 July 2010 Acceptance Review for Calvert Cliffs TAC Nos. ME4220 Through ME4223 ML1011604482010-04-26026 April 2010 Acceptance Review for Calvert Cliffs TAC Nos. ME3696/ME3697 ML1008100792010-03-22022 March 2010 Acceptance Review for Calvert Cliffs, License Amendment Request, Modify the Existing Note within Technical Specification 3.4.10, Pressurizer Safety Valves, TAC Nos. ME3348 & ME3349 ML1003409612010-02-23023 February 2010 Acceptance Review of Licensing Action Transition from Westinghouse to Areva Nuclear Fuel - Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 ML1003509372010-02-0404 February 2010 Acceptance Review for Calvert Cliffs TAC Nos. ME2967 and ME2968 ML1000800212010-01-11011 January 2010 Acceptance Review for License Amendment Request to Transition to Areva Fuel-Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2-(TAC Nos. ME2831 and ME2832) ML0915302092009-06-0202 June 2009 Acceptance Review for Calvert Cliffs Amendment Request (TAC Nos. ME1336/ME1337) ML0914706282009-05-27027 May 2009 Acceptance Review for Calvert Cliffs TSTF-479 and TSTF-497 Application ML0907100252009-03-11011 March 2009 Acceptance Review for Calvert Cliffs ISI-022 and ISI-023 (TAC Nos. ME0668 & ME0669) ML0905703152009-02-26026 February 2009 Acceptance Review Constellation and Edf Development - Application for Approval of License Transfers and Conforming License Amendment Request-Calvert Cliffs Nuclear Power Plant 1 and 2, Nine Mile Point Nuclear Station 1 and 2, and R.E. Ginna ML0829500742008-10-21021 October 2008 Acceptance Review for 10 CFR 50.61a Reporting Requirements ML0824608562008-09-0202 September 2008 Acceptance Review for TSTF-491 License Amendment Application 2022-01-14
[Table view] Category:Letter
MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 IR 05000318/20240072024-11-0606 November 2024 Assessment Follow-Up Letter for Calvert Cliffs Nuclear Power Plant, Unit 2 (Report 05000318/2024007) IR 05000317/20240032024-10-22022 October 2024 Integrated Inspection Report 05000317/2024003, 05000318/2024003, and Independent Spent Fuel Storage Installation Report 07200008/2024001 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24283A0012024-10-0909 October 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000317/20245012024-10-0707 October 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000317/2024501 and 05000318/2024501 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) ML24240A2462024-08-27027 August 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report ML24240A1112024-08-27027 August 2024 Registration of Use of Casks to Store Spent Fuel ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240022024-08-0606 August 2024 Integrated Inspection Report 05000317/2024002 and 05000318/2024002 IR 05000317/20240102024-07-31031 July 2024 Age-Related Degradation Inspection Report 05000317/2024010 and 05000318/2024010 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24198A0442024-07-16016 July 2024 Inservice Inspection Report IR 05000317/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000317/2024401 and 05000318/2024401 ML24177A1832024-06-25025 June 2024 Inservice Inspection Report RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24161A0012024-06-0909 June 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML24150A0522024-05-29029 May 2024 Operator Licensing Examination Approval ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24136A1962024-05-15015 May 2024 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report IR 05000317/20240012024-05-0707 May 2024 Integrated Inspection Report 05000317/2024001 and 05000318/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 05000317/LER-2024-002, Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus2024-04-29029 April 2024 Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus 05000318/LER-2024-001, Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip2024-04-24024 April 2024 Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip ML24101A1942024-04-22022 April 2024 Closeout Letter for GL 2004-02 ML24114A0182024-04-18018 April 2024 Electronic Reporting of Occupational Exposure Reporting 05000318/LER-2023-004-01, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-04-12012 April 2024 Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240402024-04-11011 April 2024 95001 Supplemental Inspection Report 05000317/2024040 and Follow-Up Assessment Letter RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24082A0082024-03-22022 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML24078A1152024-03-18018 March 2024 10 CFR 50.46 Annual Report ML24059A0632024-03-15015 March 2024 Authorization and Safety Evaluation for Alternative Request ISI-05-021 (EPID L-2023-LLR-0006) - Non-Proprietary IR 05000317/20230062024-02-28028 February 2024 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, (Reports 05000317/2023006 and 05000318/2023006 ML24052A0072024-02-14014 February 2024 Core Operating Limits Report for Unit 1, Cycle 27, Revision 0 ML24040A1492024-02-0909 February 2024 Response to NRC Request for Additional Information Regarding Final Response to Generic Letter 2004-02 ML24040A0962024-02-0909 February 2024 Notification of Readiness for NRC 95001 Inspection IR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 2024-09-06
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 2, 2016 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2 -
ACCEPTANCE REVIEW OF REQUESTED LICENSING ACTION RE:
CONTROL ROOM EMERGENCY VENTILATION SYSTEM (CAC NOS. MF8406 AND MF8407)
Dear Mr. Hanson:
By letter dated September 22, 2016, Exelon Generation Company, LLC (Exelon) submitted a license amendment request (LAR) for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (CCNPP 1 and 2). The proposed amendment would revise the CCNPP 1 and 2 Technical Specification (TS) Section 3.8.3, "Control Room Recirculation Signal (CRRS)," and TS 3.7.8, "Control Room Emergency Ventilation System (CREV)," to eliminate certain CREV system components that no longer serve the purpose of establishing and isolating the control room boundary. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 10 CFR 50.34 addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that the information delineated in the enclosure to this letter is necessary to enable the staff to make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment.
In order to make the application complete, the NRC staff requests that Exelon supplement the application to address the information requested in the enclosure by November 18, 2016. This will enable the NRC staff to begin its detailed technical review. If the information responsive to the NRC staff's request is not received by the above date, the application will not be accepted for review pursuant to 10 CFR 2.101, and the NRC will cease its review activities associated with the application. If the application is subsequently accepted for review, you will be advised of any further information needed to support the staff's detailed technical review by separate correspondence.
B. Hanson The information requested and associated time frame in this letter were discussed with Mr. Enrique Villar of your staff on November 1, 2016.
If you have any questions, please contact me at (301) 415-1030.
Sincerely, Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318
Enclosures:
As stated cc w/encl: Distribution via Listserv
NRC STAFF ACCEPTANCE REVIEW COMMENTS REQUESTED LICENSING ACTION RE:
CONTROL ROOM EMERGENCY VENTILATION SYSTEM RENEWED FACILITY OPERATING LICENSE NOS. DPR-53 AND DPR-69 EXELON NUCLEAR GENERATION, LLC CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 DOCKET NOS. 50-317 AND 50-318 By letter dated September 22, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16266A086), Exelon Nuclear Generation, LLC (Exelon) submitted a license amendment request (LAR) for Calvert Cliffs Nuclear Power Plant, Units 1 and 2. The Nuclear Regulatory Commission (NRC) staff has reviewed Exelon's application and concluded that the information delineated below is necessary to enable the staff to make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment.
Title 10 of the Code of Federal Regulations (10 CFR) Section 50.36{b) states in part that. .. "The technical specifications will be derived from the analyses and evaluation included in the safety analysis report, and amendments thereto, submitted pursuant to § 50.34." The NRC staff has determined the application lacks depth of technical information in the discussion regarding the modification of the Control Room Emergency Ventilation System (GREV) including the design change control process used, analyses, evaluations and criteria used to assess acceptability of the modification.
The licensee is requested to supplement their application by providing a detailed explanation of the design change which should include the process used to control the design change, the evaluation criteria used to assess the acceptability of the design change as well as any analyses and evaluations used to justify the design change. The staff notes that the modification discussed in the LAR was performed in 1999; the licensee is requested to provide a detailed explanation of its rationale for leaving the technical specifications unaltered and the reasons for the subsequent determination years later to submit a license amendment request proposing the TS changes.
ML16306A471
- C oncurrence an d Inpu t prov1"d e d b1y e-ma1.
- 1 No su bstan f ta I c hanges ma d e.
OFFICE DORL/LPL 1-1 /PM DORL/LPL 1-1 /LA DSS/STSB/BC NAME RGuzman KGoldstein Klein*
DATE 11/01/16 11/02/16 11/02/16 OFFICE DSS/SBPB/BC DORL/LPL 1-1/BC(A)
. *.n ""
NAME GCasto* BMozafari ,, ',::: '/~ :'.
DATE 11/02/16 11/02/16 )<.:<::