From:
Douglas Pickett Sent:
Tuesday, October 21, 2008 8:39 AM To:
'Furio, Patricia S' Cc:
Subject:
Acceptance Review for Proposed Reporting Requirements Re: Proposed 10 CFR 50.61a Ms. Furio:
By letter dated October 1, 2008, Calvert Cliffs Nuclear Power Plant, Inc. (the licensee) submitted a license amendment for the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2.
The proposed amendment would insert new license conditions that would require the submittal of the information and analyses requested in paragraph (e) of proposed 10 CFR 50.61a. This requirement relates to proposed Relief Request Nos. ISI-020 and ISI-021 provided in a separate submittal also dated October 1, 2008.
The purpose of this letter is to provide the results of the Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
Consistent with staff policy, a copy of this email will be placed in ADAMS as a publicly available document.
Douglas V. Pickett, Senior Project Manager Calvert Cliffs Nuclear Power Plant, R.E. Ginna Nuclear Power Plant U.S. Nuclear Regulatory Commission 301-415-1364 Email: douglas.pickett@nrc.gov E-mail Properties Mail Envelope Properties ()
Subject:
Acceptance Review for Proposed Reporting Requirements Re: Proposed 10 CFR 50.61a Sent Date: 10/21/2008 8:25:27 AM Received Date: 10/21/2008 8:39:00 AM From: Douglas Pickett Created By: Douglas.Pickett@nrc.gov Recipients:
Patricia.Furio@constellation.com ('Furio, Patricia S')
Tracking Status: None Mark.Kowal@nrc.gov (Mark Kowal)
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 10793 10/21/2008 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: