MONTHYEARML17310B2322017-11-0707 November 2017 Presentation Slides - NextEra Energy/Fpl - GSI-191 Issue Resolution, Pre-submittal Meeting, September 20, 2017 Project stage: Meeting ML17310B2062017-11-20020 November 2017 Summary of September 20, 2017, Meeting with Florida Power & Light Company and NextEra Energy Regarding Closure of NRC Generic Safety Issue 191/NRC Generic Letter 2004-02 Project stage: Meeting ML18136A9052018-05-31031 May 2018 Summary of April 25, 2017, Meeting with Florida Power & Light Company/Nextera Energy Regarding Planned Submittal of Exemption Requests to Support Closure of NRC Generic Safety Issue 191/NRC Generic Letter 2004-02 Project stage: Meeting L-20-162, Supplemental Response to NRC Generic Letter 2004-022020-11-30030 November 2020 Supplemental Response to NRC Generic Letter 2004-02 Project stage: Request 0CAN122001, Final Response to NRC Generic Letter 2004-022020-12-10010 December 2020 Final Response to NRC Generic Letter 2004-02 Project stage: Request ML21062A0642021-03-0202 March 2021 NRR E-mail Capture - Request for Additional Information for Diablo Canyon Generic Letter 2004-02 Submittal (L-2017-LRC-0000) Project stage: RAI NL-21-0020, Final Supplemental Response to NRC Generic Letter 2004-022021-03-23023 March 2021 Final Supplemental Response to NRC Generic Letter 2004-02 Project stage: Request DCL-21-034, Response to Request for Additional Information on Final Supplemental Response to Generic Letter 20042021-04-15015 April 2021 Response to Request for Additional Information on Final Supplemental Response to Generic Letter 2004 Project stage: Supplement ML21118A0072021-04-28028 April 2021 Final Response and Close-out to Generic Letter 2004-02 Project stage: Request PMNS20210610, Public Meeting Regarding Path Forward for Generic Letter 2004-02 Closure for Point Beach Nuclear Plant Units 1 and 22021-05-17017 May 2021 Public Meeting Regarding Path Forward for Generic Letter 2004-02 Closure for Point Beach Nuclear Plant Units 1 and 2 Project stage: Request ML21134A0232021-05-18018 May 2021 GL 2004-02 Resolution Update - NextEra Energy Point Beach, LLC (NextEra) Project stage: Request ML21147A1462021-05-27027 May 2021 Response to Request for Additional Information Regarding Generic Letter 2004-02 Project stage: Response to RAI ML21168A2612021-06-17017 June 2021 (Vcsns), Unit 1 - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-water Reactors - Final Supplemental Response Project stage: Request ML21161A2992021-06-17017 June 2021 Summary of May 18, 2021 Public Webinar with Nextera Energy Point Beach, LLC Regarding Path Forward for Generic Letter 2004-02 Closure Project stage: Other ML21197A0372021-07-16016 July 2021 NRR E-mail Capture - ANO-1 and 2 - Final RAI Final Response to GL 2004-02 Project stage: RAI ML21203A3142021-07-29029 July 2021 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML21252A3212021-08-20020 August 2021, 30 August 2021, 14 September 2021 ANO Meeting Summary for September 1, 2020 Public Meeting/Teleconference Project stage: Request ML21232A0402021-08-20020 August 2021 Notice of Teleconference with Entergy Operations, Inc. Concerning Final Response to Generic Letter 2004-02 at Arkansas Nuclear One, Units 1 and 2 Project stage: Meeting ML21242A2792021-08-30030 August 2021 ANO Slides Presentation for 9-1-21 Public Meeting Project stage: Meeting ML21252A2662021-09-14014 September 2021 Summary of September 1, 2021, Teleconference Meeting with Entergy Operations, Inc. Concerning the Final Response to Generic Letter 2004-02 for Arkansas Nuclear One, Units 1 and 2 Project stage: Meeting ML21211A0822021-09-24024 September 2021 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML21260A1612021-09-24024 September 2021 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other RA-21-0230, Duke Energy - Final Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2021-09-30030 September 2021 Duke Energy - Final Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request 0CAN102101, Final Request for Additional Information Concerning Generic Letter 2004-022021-10-0404 October 2021 Final Request for Additional Information Concerning Generic Letter 2004-02 Project stage: Request ML21214A1782021-10-0808 October 2021 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Other PMNS20211455, Pre-Submittal Public Meeting Regarding License Amendment and Exemption Request for Generic Letter 2004-02 Closure for Point Beach Nuclear Plant Units 1 and 22021-12-0303 December 2021 Pre-Submittal Public Meeting Regarding License Amendment and Exemption Request for Generic Letter 2004-02 Closure for Point Beach Nuclear Plant Units 1 and 2 Project stage: Meeting ML21336A7972021-12-0909 December 2021 GL 2004-02 Resolution Update - NextEra Energy Point Beach, LLC - December 9, 2021 (Slides) Project stage: Request ML22019A2792022-01-20020 January 2022 Summary of Public Webinar with NextEra Energy Point Beach, LLC Regarding Future License Amendment and Exemption Request for Generic Letter 2004-02 Closure for Point Beach Nuclear Plant Project stage: Other ML22019A2652022-01-27027 January 2022 Us NRC Staff Review of Documentation Provided by Firstenergy Nuclear Operating Co. for Beaver Valley, Units 1&2 Concerning Resolution of Generic Letter 2004-02 - Potential Impact of Debris Blockage on Emergency Recirculation During Design B Project stage: Approval ML22013A3722022-01-27027 January 2022, 31 January 2022 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML22013A3392022-01-31031 January 2022 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML22053A2402022-02-22022 February 2022 Final Supplemental Response to NRC Generic Letter 2004-02 Project stage: Request ML22061A0562022-03-29029 March 2022 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML22112A1482022-04-22022 April 2022 Correction_H. B. Robinson Steam Electric Plant, Unit 2 - Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02 Project stage: RAI ML22109A1752022-04-27027 April 2022 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other RA-22-0144, Response to NRC Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-022022-05-19019 May 2022 Response to NRC Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02 Project stage: Supplement ML22164A8612022-06-24024 June 2022 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML22167A1702022-07-14014 July 2022 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) Project stage: Draft RAI ML22251A1292022-09-0909 September 2022 Request for Additional Information Related to Response to Generic Letter 2004-04 Project stage: RAI ML22312A4432022-11-0707 November 2022 NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to RAI Project stage: Request ML22335A4142022-12-21021 December 2022 Request for Withholding Information from Public Disclosure for Dominion Fleet Response to Request for Additional Information Regarding NRC Generic Letter 2004-02 Project stage: RAI L-04-002, Stations - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to Request for Additional Information2023-05-0808 May 2023 Stations - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to Request for Additional Information Project stage: Response to RAI L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-022023-06-0909 June 2023 Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 Project stage: Response to RAI ML23193A9382023-07-18018 July 2023 – Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML23188A0202023-07-26026 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML23200A1832023-08-0303 August 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML23243A9102023-09-0606 September 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML23290A0092023-10-17017 October 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML24012A0492024-01-11011 January 2024 Request for Additional Information Regarding Final Response to Generic Letter 2004-02 Project stage: RAI 2021-09-24
[Table View] |
Text
From:
Michael Marshall To:
Wendi Para (wendi.para@constellation.com)
Subject:
Calvert Cliffs Nuclear Power Plant, Units 1 and 2 - Request for Additional Information Regarding Final Response to Generic Letter 2004-02 (EPID L-2017-LRC-0000)
Date:
Thursday, January 11, 2024 1:09:00 PM Hello Wendi,
By letter dated November12, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20317A112), Constellation Generation Company, LLC (Constellation) submitted its final response to Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, dated September 13, 2004 (ML042360586), for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Calvert Cliffs).
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information provided in Constellations final response to GL 2004-02 for Calvert Cliffs and has determined that additional information is needed to complete the NRC staffs review. The request for additional information (RAI) was discussed with you on January 10, 2024, and it was agreed that Constellations response would be provided within 90 days of the date of this email.
RAIs
GL 2004-02 requested that licensees provide information confirming that their plants are in compliance with Section 50.46 of Title 10 of the Code of Federal Regulations (10 CFR) that requires plants to be able maintain adequate long-term core cooling to ensure that the fuel in the core can be cooled and maintained in a safe and stable configuration following a postulated accident. In accordance with 10 CFR 50.54(f), addressees for GL 2004-02 are required to submit written responses to the generic letter.
- 1. On page 17 of 141 of Attachment 1 to the letter dated November12, 2020, the licensee states that banded calcium silicate (cal-sil) insulation uses a zone of influence (ZOI) of 5.45D (D is equal to the diameter of the postulated break and determines the volume of the ZOI) and 100 percent fines is assumed for all cal-sil material within the ZOI. Table 2a on page 18 of 141 states that a 6.4D ZOI is used for cal-sil and provides a three-category size distribution. The response states that there is no cal-sil within a 5.45D ZOI for any of the limiting Region I or II breaks.
Clarify which of the two debris generation models is used for the estimation of cal-sil debris generation at Calvert Cliffs.
- 2. Even if there is no deaeration at the mid-point of the strainer it may occur at higher strainer elevations due to lower submergence. Therefore, using the midpoint of the strainer may underestimate the amount of deaeration that occurs and the potential effects of this phenomenon. The strainer midpoint is identified as the reference location on page 41 of Attachment 1 and the phenomenon is discussed on page 71 of with respect to the maximum allowable head loss values provided in Table 11a. On page 71 it is stated that deaeration is the limiting failure mode for some
anticipated operational conditions for the strainer. Therefore, a realistic or conservative deaeration value is required for the analysis.
Provide justification for using the mid-point of the strainer as a reference point for the deaeration evaluation.
- 3. On pages 75 and 76 of 141 of Attachment 1 to the letter dated November12, 2020, the licensee states that the excessive particulate included in the Summer 2010 tests can be credited to make up for a lack of chemical precipitate added to those tests for the 12B cold-leg break and 12 hot-leg break at the steam generator. Theoretically this may be true, but the effect of chemicals on head loss is generally much greater than that of typical particulate coatings surrogates. In the Calvert Cliffs tests, precipitates had a much larger effect than coatings. The effect of precipitates and coatings on head loss depends on other factors in the test.
Provide additional information to justify that the tests bound the plant conditions for the Region II tests or provide justification that the testing justifies that the strainer will perform its function under realistic conditions as allowed by a Region II analysis.
- 4. On page 76 of 141 of Attachment 1 to the letter dated November12, 2020, the licensee states that the head loss from Test No. 3 is scaled down to 1150 gallons per minute (gpm) and that is below all applicable head loss limits in Table 11A.
Provide the head loss value calculated at 1150 gpm that was used in the evaluation.
- 5. On page 92 of 141 of Attachment 1 to the letter dated November12, 2020, the limiting net positive suction head (NPSH) margin value for the containment spray system pump is listed as 1.63 feet for maximum sump pool temperature cases. On page 71 the minimum NPSH margin value is listed as 2.07 feet for cases greater than 140 degree Fahrenheit.
Provide an explanation for the difference between these values.
- 6. If the flow rates are not controlled per the procedural changes that are stated to be in progress by the submittal, the NPSH margins in the submittal will be non-conservative.
The commitment to revise the EOP is listed in Attachment 2 of and discussed on Page 4 of 141 of Attachment 1 of the letter dated November12, 2020.
Confirm that the emergency operating procedures (EOPs) have been revised to ensure the maximum flow rate through the strainer is limited to 2365 gpm during recirculation and that the procedures are in place to ensure that post-recirculation actuation signal flow is limited to 600 gpm.
Best Regards, Michael L. Marshall, Jr.
Senior Project Manager
Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
301-415-2871
Docket No. 50-317 and 50-318