From: Pickett, Douglas Sent: Thursday, September 01, 2011 1:50 PM To: 'Furio, Patricia S' Cc: Matharu, Gurcharan; McConnell, Matthew; Goel, Vijay; Mathew, Roy; Salgado, Nancy; Lingam, Siva; Boyle, Patrick

Subject:

Acceptance Review of Calvert Cliffs Amendment Application (TAC Nos.

ME6831-ME6832)

Ms. Furio:

By letter dated August 8, 2011 (TAC Nos. ME6831 & ME6832), Calvert Cliffs Nuclear Power Plant, LLC submitted a license amendment request for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2. The amendment would modify Technical Specification 3.8.1, AC Sources -

Operating, Surveillance Requirement 3.8.11.1, by revising the required power factor value to be achieved by the diesel generators during conduct of the surveillance test.

The purpose of this e-mail is to provide the results of the Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Please contact me if you have any questions. A copy of this email will be made publicly available in ADAMS.

Douglas V. Pickett, Senior Project Manager Calvert Cliffs, R.E. Ginna U.S. Nuclear Regulatory Commission 301-415-1364 Email: douglas.pickett@nrc.gov