Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARML18256A0522018-09-24024 September 2018 Plants, Units 1 and 2 - Supplemental Information Needed for Acceptance of Requested Licensing Action Risk-Informed Approach to Closure for Generic Safety Issue-191 (EPID L-2018-LLA-0222)and Project stage: Acceptance Review ML18283A0342018-10-10010 October 2018 Supplement to Final Response to Generic Letter 2004-02, Dated August 13, 2018 Project stage: Request ML18304A1392018-10-30030 October 2018 Acceptance of Requested Licensing Action Risk-Informed Approach to Closure for Generic Safety Issue-191 (EPID L-2018-LLA-0222 and EPID L-2018-LLE-0013) Project stage: Acceptance Review ML18345A1942018-12-21021 December 2018 Plants, Units 1 and 2 - Regulatory Audit Risk-Informed Approach to License Amendment Request for Closure of Generic Safety Issue-191 Project stage: Other ML19070A0192019-03-11011 March 2019 Request for Additional Information Regarding Exemption Request from 10CFR50.46(A)(1) to Support Resolution of GSI-191 Project stage: RAI ML19158A0752019-06-0707 June 2019 Revised: Final Response to Generic Letter 2004-02 Project stage: Request ML19205A2872019-07-19019 July 2019 Notification of Change in Review Schedule (Epids L-2018-LLA-0222 and L-2018-LLE-0013) Project stage: Other ML19261B2202019-09-18018 September 2019 Request for Additional Information Regarding Final Response to Generic Letter 2004-02 Project stage: RAI ML19277D1032019-10-0303 October 2019 Response to Request for Additional Information Revised - Final Response to Generic Letter 2004-02 Project stage: Response to RAI ML19294A0562019-10-21021 October 2019 Withdrawal of License Amendment Request for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 - Final Response to Generic Letter 2004-02 Project stage: Withdrawal ML19295E7142019-10-28028 October 2019 L-2018-LLA-0222 and L-2018-LLE-0013 -Withdrawal FRN 2019-10-22 Project stage: Other ML19295E7122019-10-28028 October 2019 Withdrawal of Amendment and Exemption Requests (Epids L-2018-LLA-0222 and L-2018 LLE-0013) Project stage: Withdrawal 2019-10-28
[Table View] |
|
---|
Category:Acceptance Review Letter
MONTHYEARML21281A1402022-01-14014 January 2022 Acceptance for Review of Proposed Alternative ISI-05-018 for Examinations of Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles ML21152A1232021-06-0101 June 2021 Acceptance for Review of Proposed Alternative ISI-05-016 Involving Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (EPID L-2021-LLR-0037) (Email) ML21077A1772021-04-0808 April 2021 Withdrawal of Requested Exemption from Certain Requirement in 10 CFR 50.55a (Epids L-2021-LLE-0014, 0015, & 0016) ML20015A4992020-01-15015 January 2020 Acceptance of Requested Licensing Action Emergency Diesel Generator Surveillance Requirements for Frequency and Voltage Tolerances ML18304A1392018-10-30030 October 2018 Acceptance of Requested Licensing Action Risk-Informed Approach to Closure for Generic Safety Issue-191 (EPID L-2018-LLA-0222 and EPID L-2018-LLE-0013) ML18271A1372018-09-28028 September 2018 Acceptance of Requested Licensing Action Re Amendment to Relocate Emergency Operations Facility and Joint Information Center ML18124A3162018-05-0404 May 2018 Acceptance of Requested Licensing Action Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML17192A1752017-07-11011 July 2017 Plants, Units 1 and 2; Calvert Cliffs Independent Spent Fuel Storage Installation; Nine Mile Point Nuclear Station, Units 1 and 2; R. E. Ginna - Acceptance of License Amendment Request to Revise Emergency Action Level Schemes ML16326A2682016-11-21021 November 2016 2016/11/21 E-mail from R.Guzman to E.Villar - Acceptance Review Determination - Control Room Emergency Ventilation System LAR ML16306A4712016-11-0202 November 2016 Acceptance Review License Amendment Request - Control Room Emergency Ventilation System ML16091A4842016-03-30030 March 2016 2016/03/30 E-mail from R.Guzman to E.Villar - Acceptance Review Determination LAR to Revise TSs to Adopt Risk-Informed Completion Times TSTF-505, Rev 1 (MF7415, MF7416) ML14300A2202014-10-23023 October 2014 NRR E-mail Capture - Acceptance Review Results Regarding the Calvert Cliffs Containment Leakage Rate Testing Program License Amendment Request (MF4898-99) ML13101A1702013-04-0808 April 2013 MF0617 & MF0618 - Acceptance Review E-mail to Licensee - After Supplemental Information ML13031A3162013-01-31031 January 2013 E-mail - Acceptance Review Results Re Relief Request RR-ISI-04-08 Saltwater Piping Repair ML12320A3142012-11-14014 November 2012 Acceptance Review Results Regarding Enhancements to Diesel Generator Surveillance Requirements License Amendment Request (ME9832 and ME9833) ML1204500382012-02-14014 February 2012 Acceptance Review for Calvert Cliffs RR-ISI-04-06 and RR-ISI-04-07 ML1201100172012-01-10010 January 2012 Acceptance Review for Calvert Cliffs TAC Nos. ME7672 & ME7673 ML1124404592011-09-0101 September 2011 Acceptance Review of Calvert Cliffs Amendment Application (TAC Nos. ME6831-ME6832) ML1122800522011-08-16016 August 2011 Acceptance Review for Proposed Exemption (TAC Nos. ME6738/9) ML1114508612011-05-25025 May 2011 Acceptance Review for Calvert Cliffs TACs ME6250/ME6251 ML1105500872011-02-24024 February 2011 Acceptance Review for Calvert Cliffs TAC Nos. ME5424/ME5425 ML1105500792011-02-24024 February 2011 Acceptance Review for Calvert Cliffs TAC No. ME5423 ML1030900292010-11-0505 November 2010 Acceptance Review for Calvert Cliffs TAC Nos. ME4892 and ME4893 ML1029404192010-10-21021 October 2010 E-mail Acceptance Review for Calvert Cliffs Cilrt Extension Request ML1020900502010-07-28028 July 2010 Acceptance Review for Calvert Cliffs TAC Nos. ME4220 Through ME4223 ML1011604482010-04-26026 April 2010 Acceptance Review for Calvert Cliffs TAC Nos. ME3696/ME3697 ML1008100792010-03-22022 March 2010 Acceptance Review for Calvert Cliffs, License Amendment Request, Modify the Existing Note within Technical Specification 3.4.10, Pressurizer Safety Valves, TAC Nos. ME3348 & ME3349 ML1003409612010-02-23023 February 2010 Acceptance Review of Licensing Action Transition from Westinghouse to Areva Nuclear Fuel - Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 ML1003509372010-02-0404 February 2010 Acceptance Review for Calvert Cliffs TAC Nos. ME2967 and ME2968 ML1000800212010-01-11011 January 2010 Acceptance Review for License Amendment Request to Transition to Areva Fuel-Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2-(TAC Nos. ME2831 and ME2832) ML0915302092009-06-0202 June 2009 Acceptance Review for Calvert Cliffs Amendment Request (TAC Nos. ME1336/ME1337) ML0914706282009-05-27027 May 2009 Acceptance Review for Calvert Cliffs TSTF-479 and TSTF-497 Application ML0907100252009-03-11011 March 2009 Acceptance Review for Calvert Cliffs ISI-022 and ISI-023 (TAC Nos. ME0668 & ME0669) ML0905703152009-02-26026 February 2009 Acceptance Review Constellation and Edf Development - Application for Approval of License Transfers and Conforming License Amendment Request-Calvert Cliffs Nuclear Power Plant 1 and 2, Nine Mile Point Nuclear Station 1 and 2, and R.E. Ginna ML0829500742008-10-21021 October 2008 Acceptance Review for 10 CFR 50.61a Reporting Requirements ML0824608562008-09-0202 September 2008 Acceptance Review for TSTF-491 License Amendment Application 2022-01-14
[Table view] Category:E-Mail
MONTHYEARML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24108A1352024-05-20020 May 2024 Email to Christian Williams Re Decision on the Exemption Request for Calvert Cliffs ML24108A1312024-05-15015 May 2024 Email to Christian Williams Re Availability of Environmental Assessment for the Calvert Cliffs Exemption ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) NRC-2024-0085, Response from State of MD Regarding Review of EA for Calvert Cliffs Exemption Request2024-05-0909 May 2024 Response from State of MD Regarding Review of EA for Calvert Cliffs Exemption Request ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24131A1212024-04-29029 April 2024 Email to State of MD Requesting Review of the EA for Calvert Cliffs Exemption Request ML24012A0492024-01-11011 January 2024 Request for Additional Information Regarding Final Response to Generic Letter 2004-02 ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23304A0152023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Calvert Cliffs 1 & 2 - Exemption from Security Rule (L-2023-LLE-0033) ML23181A0732023-06-30030 June 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs TSTF-59A ML23160A0222023-06-0606 June 2023 NRR E-mail Capture - Calvert Cliffs - Long Term Coupon Surveillance Program RAI ML23156A0102023-06-0404 June 2023 NRR E-mail Capture - Calvert Cliffs - RAI License Amendment Request for Emergency Desiel Generator ML23080A0672023-03-21021 March 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs Unit 1 - LAR to Modify the Long-Term Coupon Surveillance Program ML23080A1002023-03-21021 March 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs Repair Replacement of Saltwater System Buried Piping ML23026A1332023-01-26026 January 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs Deletion of License Condition for Decommissioning Trust LAR ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22342B1462022-11-21021 November 2022 NRR E-mail Capture - Acceptance Review for TSTF 295A ML22325A0052022-11-18018 November 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-273-A, Revision 2 ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22091A2392022-04-0101 April 2022 NRR E-mail Capture - Calvert Cliffs - Formal RAI for Proposed Alternative for Examinations of Certain Pressurizer Welds ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22091A2402022-03-23023 March 2022 NRR E-mail Capture - (External_Sender) Salem Generating STATION-INCIDENTAL Take of Atlantic Sturgeon Collected on 03/22/2022 ML22075A1912022-03-16016 March 2022 NRR E-mail Capture - Acceptance for Review of Proposed Alternative Repair Method for Buried Class 3 Saltwater System Piping ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22059B0602022-02-28028 February 2022 Change to Review Schedule Regarding Proposed Alternative for Various Pressurizer Welds ML22060A0172022-02-23023 February 2022 NRR E-mail Capture - Calvert Cliffs Nuclear Power Plant, Units 1 and 2 - Withdraw of Draft RAI Regarding Proposed Alternative for Various Pressurizer Welds ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML21281A1402022-01-14014 January 2022 Acceptance for Review of Proposed Alternative ISI-05-018 for Examinations of Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21295A5712021-10-22022 October 2021 NRR E-mail Capture - Acceptance for Review of Proposed Alternative ISI-05-019 for Pressure Testing of Certain Portions of ASME Section XI Class 2 Auxiliary Feedwater Piping ML21287A0322021-10-13013 October 2021 Request for Additional Information Re Proposed Alternative for Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML21286A5902021-10-0505 October 2021 Acceptance for Review of Proposed Alternative ISI-05-017 for Examinations of Examination Category C-B Steam Generator ML21287A0932021-10-0505 October 2021 Request for Additional Information: Calvert Cliffs 1 & 2 LAR to Revise Spent Fuel Pool Cooling - Shutdown Cooling Systems Licensing Basis (EPID L-2021-LLA-0112) (Email) ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21214A0202021-08-0909 August 2021 License Amendment Request to Change Spent Fuel Pool Cooling Design Basis ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21201A0482021-07-19019 July 2021 Acceptance of Requested Licensing Action to Change Spent Fuel Pool Cooling Design Basis ML21180A1562021-06-28028 June 2021 Request for Additional Information Regarding License Amendment Request Concerning Containment Sump ML21152A1232021-06-0101 June 2021 Acceptance for Review of Proposed Alternative ISI-05-016 Involving Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (EPID L-2021-LLR-0037) (Email) ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting 2024-09-06
[Table view] |
Text
From: Marshall, Michael To: Villar, Enrique:(GenCo-Nuc)
Cc: James Danna (James.Danna@nrc.gov)
Subject:
Calvert Cliffs Nuclear Power Plant, Units 1 And 2 - Acceptance of Requested Licensing Action Re: Risk-Informed Approach To Closure For Generic Safety Issue-191 (EPID L-2018-LLA-0222 AND EPID L-2018-LLE-0013)
Date: Tuesday, October 30, 2018 1:38:00 PM Hello Rick, By letter dated August 13, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18226A189) as supplemented by letter dated October 10, 2018 (ADAMS Accession No. ML18283A034), Exelon Generation Company, LLC (Exelon) submitted a license amendment and exemption request for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Calvert Cliffs). The proposed amendments would change the Calvert Cliffs licensing bases, including the affected portions of the Technical Specifications and Updated Final Safety Analysis Report. Additionally, Exelon requested exemptions from certain requirements in Section 50.46(a)(1) of Title 10 of the Code of Federal Regulations (10 CFR). Specifically, the proposed amendments and exemptions would allow the use of a risk-informed approach to address safety issues discussed in Generic Safety Issue -191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance and close out generic letter (GL) 200402, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (ADAMS Accession No. ML042360586).
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment and exemption in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this license amendment request will take approximately 2160 hours90 days <br />12.857 weeks <br />2.959 months <br /> to complete and the exemption request will take approximately 320 hours13.333 days <br />1.905 weeks <br />0.438 months <br /> to complete. The NRC staff expects to complete both reviews by the end of October 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated to Exelon during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any questions, please contact me.
Michael L. Marshall, Jr.
Senior Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-2871 Docket No. 50-317 and 50-318