Forwards Endorsements 10 to Nelia Certificates N-59,N-25, N-26,MAELU Certificates M-59,M-25,M-26,respectively & Endorsements 8 to Nelia Certificate N-89 & Maelu Certificate M-89,respectivelyML17345A475 |
Person / Time |
---|
Site: |
Saint Lucie, Turkey Point, 05000000 |
---|
Issue date: |
10/24/1988 |
---|
From: |
Rozier Carter MARSH & MCLENNAN, INC. |
---|
To: |
Dinitz I NRC |
---|
References |
---|
NUDOCS 8811020108 |
Download: ML17345A475 (33) |
|
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML20209F1541999-07-0606 July 1999 Informs That NRC in Process of Conducting Operational Safeguards Response Evaluations at Nuclear Power Reactors. Plant Chosen for Such Review Scheduled for Wk of 990823-26 ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 ML20195F3871999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. 1999-09-09
[Table view] Category:LEGAL/LAW FIRM TO NRC
MONTHYEARML17348A2771990-06-0505 June 1990 Forwards Listed Endorsements,Including 80-86,15-16,13-14, 104-109 & 112 to Nelia Policies NF-227,N-59,N-89 & NF-185, Respectively & 67-73 & 15-16 to Maelu Policies MF-88,M-25 & M-26,respectively ML17348A2321990-05-0707 May 1990 Forwards Endorsements 97 & 98 to Maelu Policy MF-55 & Endorsements 110 & 111 to Nelia Policy NF-185 ML19354E4191990-01-25025 January 1990 Comments Re Issuance of OL Amends & Proposed NSHC Determination Re Transfer of Operational Mgt Control of Plants & Views on anti-trust Issues Re Application for Amend for Plants ML20006A6241990-01-16016 January 1990 Forwards Draft Qualified Master Trust Agreement for Decommissioning of Nuclear Plants,For Review.Licensee Will Make Contributions to Qualified & Nonqualified Trust as Appropriate ML19332D8511989-11-30030 November 1989 Forwards Antitrust Comments W/Exhibits & One Copy of Comments Sans Exhibits of Cities of Benton,Conway,North Little Rock,Osceola,Prescott & West Memphis,Ak & Farmers Electric Cooperative Corp ML17347B4291989-11-22022 November 1989 Forwards Endorsements 102 & 89 to Nelia Policy NF-185 & Maelu Policy MF-55,respectively ML19325E3711989-10-30030 October 1989 Forwards 891027 Ltr to Counsel for NRC for Filing on Appropriate Dockets & Legal Issues Re Antitrust Aspect of NRC Review of Consolidation of License Amend Application ML19325E3741989-10-27027 October 1989 Lists Three Legal Issues Re Antitrust Aspects of NRC Review of Consolidation of License Amend Application for Facilities.Licensee Supplemental Info Filed W/Nrr ML18094A6521989-08-24024 August 1989 Forwards Endorsements 140 & 141 to Nelia Policy NF-164, Endorsements 117 & 118 to Maelu Policy MF-44,Endorsements 115 & 116 to Nelia Policy NF-208 & Endorsements 102 & 103 to Maelu Policy MF-77 ML17223A2431989-07-31031 July 1989 Forwards Endorsements 4 to Nelia Certificate NW-131 & Maelu Certificate MW-60 ML20245C9081989-04-11011 April 1989 Forwards Endorsements 63 & 64 to Maelu Policy MF-102, Endorsements 71 & 72 to Nelia Policy NF-247.Endorsements 106 & 107 to Nelia Policy NF-198,Endorsement 11 to Nelia Certificates N-38,N-39 & N-40 & Endorsement 10 to MF-75 ML20244D9001989-04-0606 April 1989 Forwards Endorsements 94 & 18 to Maelu Policies MF-78 & MF-129,respectively & Endorsements 112 & 24 to Nelia Policies NF-215 & NF-302,respectively ML17347B0961989-03-29029 March 1989 Forwards Endorsements 77 & 100 to Nelia Policies NF-227 & NF-185 & Endorsements 64 & 87 to Maelu Policies MF-88 & MF-55,respectively ML20244E0431989-03-28028 March 1989 Forwards Endorsements 92 & 78 to Nelia Policy NF-174 & Maelu Policy MF-51,respectively & Endorsements 78 & 67 to Nelia Policy NF-197 & Maelu Policy MF-68,respectively ML20245D6071989-03-27027 March 1989 Forwards Endorsements 113 & 114 to Nelia Policy NF-220, Endorsements 133 & 134 to Nelia Policy NF-164,Endorsement 143 to Nelia Policy NF-1 & Endorsement 86 to Nelia Policy NF-195 ML20245D3421989-03-20020 March 1989 Forwards Listed Endorsements,Including Endorsements 14,163, 144,94,75,39 & 31 to Nelia Policies NF-295,NF-100,MAELU Policy MF-29,NELIA Policy NF-182,MAELU Policy MF-61,NELIA Policy NF-281 & Maelu Policy MF-112,respectively ML20235T8911989-01-18018 January 1989 Forwards Endorsements 130 & 131 to Nelia Policy NF-164, Endorsements 107 & 108 to Maelu Policy MF-44,Endorsements 94 & 95 to Nelia Policy NF-107,Endorsements 110 & 111 to Nelia Policy NF-220 & Endorsements 97 & 98 to Maelu Policy MF-73 ML17347A9071989-01-12012 January 1989 Forwards Endorsements 5,11,9,63,62,4,11,11,86 & 85 to Maelu Certificates MW-60,M-56,M-89,MF-88,MF-88,MW-29,M-26,M-25, MF-55 & MF-55,respectively & Listed Endorsements to Listed Nelia Policies ML17347A9041988-12-12012 December 1988 Forwards Endorsements 97 & 84 to Nelia Policy NF-185 & Maelu Policy MF-55,respectively ML20205Q3381988-11-0404 November 1988 Forwards Requests for Renewal or Extension of Exemption from Requirements of 10CFR50.54(w)(i) Re Property Insurance.Fee Paid ML17345A4751988-10-24024 October 1988 Forwards Endorsements 10 to Nelia Certificates N-59,N-25, N-26,MAELU Certificates M-59,M-25,M-26,respectively & Endorsements 8 to Nelia Certificate N-89 & Maelu Certificate M-89,respectively ML17345A4051988-09-16016 September 1988 Forwards Endorsements 73 & 74 & 95 & 96 to Nelia Policies NF-227 & NF-185,respectively & Endorsements 60 & 61 & 82 & 83 to Maelu Policies MF-88 & MF-55,respectively ML17345A3101988-08-0505 August 1988 Forwards Endorsements 93 & 94 to Nelia Policy NF-185 & Endorsements 80 & 81 to Maelu Policy MF-55 ML20155F7771988-08-0505 August 1988 FOIA Request for Documents Re Low Level Radwaste Facilities to Be Built at Plants ML20151D8121988-07-15015 July 1988 Forwards Opposition of City of Clyde,Oh to Util Application to Suspend Antitrust Conditions at Facilities,Per 880616 53FR22589 & 53FR22590 ML20155A2501988-06-0303 June 1988 Forwards Endorsements 4 & 4 to Nelia Certificate NW-78 & Maelu Certificate MW-18 & Endorsements 3 & 3 to Nelia Certificate NW-125 & Maelu Certificate MW-46,respectively ML17345A1861988-05-26026 May 1988 Forwards Endorsement 92 to Nelia Policy NF-185 & Endorsement 79 to Maelu Policy MF-55 ML20154P0371988-05-26026 May 1988 Forwards Policy Endorsments,Including Endorsments 51,36,91 & 77 to Nelia Policies NF-252,NF-281,NF-182 & NF-238, Respectively & Endorsements 32,28,72 & 65 to Maelu Policies MF-108,MF-112,MF-61 & MF-93,respectively ML20154K8561988-05-18018 May 1988 Forwards Endorsements 93 & 94 to Maelu Policy MF-73 & Endorsements 106 & 107 to Nelia Policy NF-220 ML17345A1271988-05-0505 May 1988 Forwards Insurance Policy Endorsements for Listed Utils, Including Endorsements 72,91,32 & 31 to Nelia Policies NF-277,NF-185,NF-264 & NF-270,respectively & Endorsements 59 & 78 to Maelu Policies MF-88 & MF-55,respectively ML18093A8111988-04-28028 April 1988 Forwards Endorsements 102 & 103 to Nelia Policy NF-208, Endorsements 89 & 90 to Maelu Policy MF-77,Endorsements 100 & 101 to Nelia Policy NF-230 & Endorsements 84 & 85 to Maelu Policy MF-90 ML17342B3071988-04-12012 April 1988 Forwards Endorsements 89 & 90 for Nelia Policy NF-185 & Endorsements 76 & 77 for Maelu Policy MF-55 ML20151A6361988-03-28028 March 1988 Forwards Endorsements 1 & 2 to Nelia Certificates NW-96, NW-103 & NW-34 Respectively,Endorsements 1 & 2 to Maelu Certificates MW-32,MW-62 & MW-8 Respectively & Endorsement 140 to Nelia Policy NW-1 & Endorsement 43 to Policy MF-95 ML20148K1111988-03-22022 March 1988 Forwards Listed Endorsements to Listed Policies,Including Endorsement 102 to Maelu Policy MF-26,Endorsement 123 to Nelia Policy NF-76,Endorsement 71 to Maelu Policy MF-56 & Endorsement 89 to Nelia Policy NF-189 ML17342B2321988-03-21021 March 1988 Forwards Endorsements 1,2 & 3 to Maelu Policy MW-29 & Nelia Policy NW-93 ML17347A6951988-03-17017 March 1988 Forwards Endorsement 71 to Nelia Policy NF-227,Endorsement 58 to Maelu Policy MF-88,Endorsement 88 to Nelia Policy NF-185 & Endorsement 75 to Maelu Policy MF-55 ML20150D4821988-02-23023 February 1988 FOIA Request for All Plans (Subsequent to Util 870807 Commitment to Excellence Action Plan) by Util to Commission Re Restart of Facility ML20147F8231988-02-18018 February 1988 FOIA Request for Documents Re Purchase,Shipment, Distribution,Installation & Removal of Asbestos & asbestos- Containing Products at Various Nuclear Power Stations in State of CT for Jan 1966 - Dec 1975 ML20148H0821988-01-12012 January 1988 Forwards Endorsements 105 & 16 to Nelia Policies NF-215 & NF-302 & Endorsements 87 & 10 to Maelu Policies MF-78 & MF-129 ML17342B0731988-01-0707 January 1988 Forwards Endorsements 69 & 70 to Nelia Policy NF-227, Endorsements 86 & 87 to Nelia Policy NF-185,Endorsements 56 & 57 to Maelu Policy MF-88 & Endorsements 73 & 74 to Maelu Policy MF-55 ML20236T1261987-11-20020 November 1987 Memorializes Agreement Reached Among Parties & Approved by Judge Lazo in 871120 Telcon.New Extended Filing Dates Agreed to Listed.Nrc Should Notify Board & Parties If Dates Cannot Be Met.Certificate of Svc Encl ML20236U2571987-11-0505 November 1987 FOIA Request for Documents Re Ball Type Main Steam Isolation Valves Used at Facilities ML20236F7221987-10-0202 October 1987 Forwards,On Behalf of Util,Request for Exemption Per 10CFR50.12(a)(2)(v).Fee Paid ML20235J0031987-09-21021 September 1987 Forwards Endorsements 122 & 123 to Nelia Policy NF-164, Endorsements 99 & 100 to Maelu Policy MF-44,Endorsements 100 & 101 to Nelia Policy NF-220 & Endorsements 87 & 88 to Maelu Policy MF-73 ML20237L7661987-08-21021 August 1987 Forwards Florida Light & Power Co to NRC Describing Results of Blackness Testing Conducted on Boraflex in Spent Fuel Racks for Facility in Early Aug 1987. Certificate of Svc Encl.Related Correspondence ML20235Y8721987-07-15015 July 1987 Forwards Util 870710 Responses to NRC Questions Re Continued Use of Boraflex in Spent Fuel Pool Storage Racks at Facility.Boraflex Will Remain Acceptable for Use.Certificate of Svc Encl.Related Correspondence ML20214E3101987-05-11011 May 1987 Forwards Endorsements 120 & 97 to Nelia Policies NF-164 & NF-220 & Endorsements 97 & 84 to Maelu Policies MF-44 & MF-73,respectively ML18093A1291987-05-11011 May 1987 Forwards Endorsement 94 to Nelia Policy NF-230 & Endorsement 78 to Maelu Policy MF-90 ML17347A4841987-05-0707 May 1987 Forwards Endorsements 72,104,46,67,83,96 & 59 to Nelia Policies NF-238,NF-215,NF-252,NF-227,NF-185,NF-198 & NF-247 & Endorsements 60,86,27,54,70,82 & 51 to Maelu Policies MF-93,MF-78,MF-108,MF-88,MF-55,MF-66 & MF-102,respectively ML20235G2321987-04-0101 April 1987 FOIA Request for Documents Re Forged NDE Inspectors Certification Supplied by Barclay Intl for Use at Quad Cities Nuclear Station & Stated Investigations at Plants 1990-06-05
[Table view] |
Text
AClEI.ARRAYED DIST IBUTION DEMONSTRA J10N SYSTEM ACCESSION NBR: FACIL:50-000 50-250 50-251 50-335 50-389 AUTH.NAME CARTER,R.J.
RECIP.NAME DINITZ,I.REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)8811020108 DOC.DATE: 88/10/24 NOTARIZED:
NO Generic Docket Turkey Point Plant, Unit 3, Florida Power and Light.C Turkey Point Plant, Unit 4, Florida Power and Light C St.Lucie Plant, Unit 1, Florida Power 6 Light Co.St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTHOR AFFILIATION Marsh 6 McLennan, Inc.RECIPIENT AFFILIATION NRC-No Detailed Affiliation Given
SUBJECT:
Forwards Endorsements 10 6 8 to NELIA Certificates N-59, N-89,N-25 6 N-26.DISTRIBUTION CODE: MOO ID COPIES RECEIVED: LTR 1 ENCL 2 SIZE: TITLE: Insurance:
Indemnity/Endorsement Agreements v'I I, NOTES I l1 l DOCKET g 05000000, 05000250,'5000251'e 05000335', 05000389 R I RECIPIENT ID CODE/NAME INTERNAL: NRR~~S/PTSB12 G FA 01 EXTERNAL: LPDR COPIES LTTR ENCL 1 1 1 1 2 2 RECIPIENT ID CODE/NAME NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 1 1 1 1 D D Sj NOTE TO ALLRIDS" RECIPIENIS'LEASE HELP US IO REDUCE WASTE!OONTACZ'LHE DOQ3MEPZ CONTROL DESK, KXM Pl-37 (EXT.20079)TO EZiIMINATE YOUR NAME FMH DISTRIBUTION LISTS K)R DOCtlMKÃIS YOU DONiT NEEDf P TOTAL NUMBER OF COPIEG REQUIRED: LTTR 6 ENCL 6 A 9 pl}C'o 1)I'
~arsh8 QcILenn M&M Nuclear Consultants 222 South Riverside Plaza Chicago, Illinois 60606 Telephone 31 2 648-6000 October 24, 1988 Mr.Ira Dinitz Insurance Liability Specialist U.S.Nuclear Regulatory Commission Mail Stop 12E4 Washington, D.C.20555 RE: FLORIDA POWER 6 LIGHT COMPANY NUCLEAR LIABILITY INSURANCE
Dear Ira:
On behalf of the captioned, enclosed please find two.certified copies of each of the following endorsements:
~Facii it St.Lucie Turkey Point Certificate No.N-59, M-59 N-89, M-89 N-25, M-25 N-26, M-26 Endorsement No.10 8 10 10,'lease call me if you should have any questions.
obert J.Carter Nuclear Consultant Marsh 6 McLennan Nuclear RJC/rg Enc.cc: Mr.S.Reynolds-Florida Power 6 Light Company Mr.W.A.Wegener-MSM Chicago IA, SS1102010S SS1024 PDR ADOCK 05000250 J PDC
Nuclear Energy Liability Insurance MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS ENDORSEMENT TO CERTIFICATE NO.N-89 Forming Part of Masher Policy No.l Nuclear Energy Liability Insurance (Secondary Financial Protection)
Effective Au ust 31 1988,it is agreed that 1.Item 4.of this certificate is amended to read as follows: Item 4.(a)Identification of grim f inane a rotection applicable to the nuclear reactor and limit(s)of liability thereof: (1)Facility Form Policies (i)Nuclear Energy Liability Insurance Association's Policy NF-227$155,000,000 (ii)Mutual Atomic Energy Liability Under-writers'olicy MF-88$45,000,000 (2)Master Worker Policies (Facility Worker Form)(i)Nuclear Energy Liability Insurance Association' Master Worker Policy NMWP-1$124 F 000 F 000 (ii)Mutual Atomic Energy Liability Underwriters'aster Worker Policy MMWP-1 36,000,000 (b)(c)The following endorsements attached to the Facility Form policies identified in subsection (a)(1)above also apply to the insurance afforded by this Master Policy through this certificate as though they were attached hereto: (1)Waiver o f De f enses Endorsement (Extraordinary Nuclear Occurrence) and (2)Supplementary Endorsement
-Waiver of Defenses-Reactor Construction at the Facility.Sharing of limit(s)of liability provided under the rima financial rotection.
(1)The limit of liability provided under each Facility Form policy identified in subsection (a)(1)above is shared among all nuclear reactors on the location described in Item 3 of the Declarations of such policy Jf 4 l
()The limit of liability provided under each Master Worker Policy (Facility Worker Form)identified in subsection (a)(2)above is shared among all insureds under all Certificates of Insurance issued to be a part of the Master Worker Policies.C C5 o iU Z-0 Z CD u~-5z c'o ui Ua O w XK+O lU Z LQ ,oo Q OC)<<C O (g o" O W Pg co Q~sf ZG I-~W ti.C)<uiiii>O co fo X: o fh D fr o g Z Ill Z~ui D 0 fn ZO I K m ui-n CO i i-Z C9 iii ff.-$LU<<d.tt.fr fo~ccw u OuiOZ~-COfr D<D+O Regardless of the number of policies or contracts of~riser inancia otectio applicable to a nuclear'cident, the limit of (a)all Facility Form Policies identified in Item 4 (a)(i)of endorsement similar to this endorsement attached to it shall be deemed to be exhausted when the sums paid under said policies are equal to the lesser of (i)th'e sum of the limit of liability under all such policies, or (ii)two hundred million dollars;(2)a certificate, other than this certificate.
or a certificate which has a provision identical to (a)(I)above, shall be deemed to be exhausted when the sums paid under said policies are equal to the lesser of.(i)the sum of the limit of liability under said policies, or (ii)one hundred sixty million dollars;'~O fc P)OC 2.Only with.respect to such insurance as is afforded under this FINANCIAL PROTECTION of the Master Policy-Nuclear Energy Liability Insurance (Secondary Financial Protection), is amended to read as follows: (b)all Master Worker Policies (Facility Worker Form)identified in Item 4(a)(2)of a certificate shall be deemed to be exhausted when the sums paid under said policies are equal" to the lesser of (1)the sum of the limit of liability available under all such Master Worker Policies, or Effective Date of this Endorsement Issued to (2)one hundred sixty million dollars plus the amount of all automatic reinstatements of the Policy Aggregate Limit under such policies.o orm a part o Au ust 31 1988 of Certificate No.M-89 12:01 A.N.Standard Time F1orlda Power 8 Li ht Com any Date of Issue October ll, 1988 For the Subscribing Companies MUTUAL ATOMIC ENERGY LIABILITY ERMRITERS By Endorsement No.Countersigned by Authorized Representative
/P~C V Nuclear Energy Llabllity Insurance~
NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ENDORSEMENT TO'CERTIFICATE NO.8-89 Forming Part of Master Policy No.1 Nuclear Energy Liability Insurance (Secondary Financial Protection)
Effective Au u 88 , it is agreed that 1.Item 4.of this certificate is amended to read as follows: Item 4.(a)Ident:ification of prima financial rotection=applicable to the nuclear reactor and limit(s)of liability thereof: (1)Facilii y Form Policies (i)Nuclear Energy Liability Insurance Association's Policy NF-(27$155,000,000 (ii)Mutual Atomic Energy Liability Under-writers'olicy MF-88$45,000,000 (2)Master Worker Policies (Facility Worker Form)(i)Nuclear Energy Liability Insurance Association's Master Worker Policy NMWP-1$124FOOOF000 (ii)Mutual Atomic Energy Liability Underwriters
'aster Worker Policy MMWP-1$36F 000F 000 (b)The following endorsements attached to the Facility Form policies identified in subsection (a)(1)above also apply to the insurance afforded by this Master Policy through this certificate as though they were attached hereto: (1)Waiver of Defenses Endorsement (Extraordinary Nuclear Occurrence) and (2)Supplementary Endorsement
-Waiver of Defenses-Reactor Construction at the Facility.(c)Sharing of limit(s)of liability provided under t: he rimar financial rotection.
(1)The limit: of liability provided under each Facility Form policy identified-in subsection (a)(l)above is shared among all nuclear react:ors on the location described in Item 3 of the Declarations of'such policy.
~~~via~I k (2)The limit of liability provided under each Master Worker Policy (Facility Worker Form)identified in subsection (a)(2)above is shared among all insureds under all Certificates of Insurance issued to be a part of the Master Worker Policies.2.Only with respect to such insurance as is afforded under this FINANCIAL PROTECTION of the Master Policy-Nuclear Energy Liability Insurance (Secondary Financial Protection), is amended to read as follows: Regardless of the number of policies or contracts of err'~ary fina cial rotectio applicable to a nuclear i cident, the limit of (a)all Facility Form Policies identified in Item 4 (a)(i)of (1)this certificate or any other cert'ficate having an endorsement similar to this endorsement attached to it shall be deemed to be exhausted when the sums paid under said policies are equal to the lesser of (i)the sum of the limit of liability under all such policies, or (ii)two hundred million dollars;(2)a certificate, other than this certificate or a certificate which has a provision identical to (a)(1)above, shall be deemed to be exhausted when the sums paid under said policies are equal to the lesser of (i)the sum of the limit of liability under said policies, or (ii)one hundred sixty million dollars;(b)all Master Worker Policies (Facility Worker Form)identified in Item 4(a)(2)of a certificate shall be deemed to be exhausted when the sums paid under said policies are equal to the lesser of (1)the sum of the limit of liability available under all such Master Worker Policies, or (2)one hundred sixty million dollars plus the amount of all automatic reinstatements of the Policy Aggregate.Limit under such policies.To form a part of of Certificate No.N-89 Countersigned by Effective Date of this Endorsement Au ust 31 1988 12:Ol A.tl.Standard mme Issued to Florida Power&l.i n E E I TED HEREON, FOR THIS IS TO CE Y NUCLEAR ENERgY, For the Su cribing Companies INSURANCE Cu LIABILITY INSURANCE (SECONDARY FIN CIAL PROTECTION).
NO INSUR NCE IS AFFORDE BY THIS COP.'y JOHN.A OC General Manager VICE P IDENT;UNDERWRITING AMERICAN NUCLEAR INSURERS Endorsement No.8 V l H~w,'e 4~~1~'"~'t Nuclear Energy Liability Insurance MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS ENDORSEMENT TO CERTIFICATE NO.-~g Forming Part of Master Policy No.1 Nuclear Energy Liability Insurance (Secondary Financial Protection)
Effective Au ust 31 1988, it is agreed that l.Item 4.of this certificate is amended to read as follows: Item 4.(a)Identification of rima financial rotection applicable to the nuclear reactor and limit(s)of liability thereof: Facility Form Policies (i)Nuclear Energy Liability Insurance Association's Policy NF-227$155,000,000 (ii)Mutual Atomic Energy Liability Under-writers'olicy MF-88$45,000,000 (2)Master Worker Policies (Facility Worker Form)(i)Nuclear Energy Liability Insurance Association' Master Worker Policy NMWP-1$124,000,000 (ii)Mutual Atomic Energy Liability Underwriters'aster Worker Policy MMWP-1$36 g 000 g 000 (b)The following endorsements attached to the Facility Form policies identified in subsection (a)(1)above also apply to the insurance afforded by this Master Policy through this certificate as though they were attached hereto: (1)Waiver of Defenses Endorsement (Extraordinary Nuclear Occurrence) and (2)Supplement:ary Endorsement
-Waiver of Defenses-Reactor Construction at the Facility.(c)Sharing of limit(s)of liability provided under the rimar financial rotection.
(1)The limit of liability provided under each Facility Form policy identified in subsection (a)(1)above is shared among all nuclear reactors on the location described in Item 3 of the Declarations of such policy.
P f'iw 4~+~
~~~~~0 I~~~~~~~~~~~~0~~~~~~I~~~~e~~~~~~~~~~~I~~~~~aI~~~~4~I~~~~~e 0~+~~~~~~~~~~~~~~I~~~~~~~~~~0~~0 0~~~~~~~~~~~~~~~I.-~~~~~~~~~~~~~~~~g~~~I~~I~~~~I I~~~~~~~~~~~~Wr gaia~~~~~~
~~P f~j gf;/')J t Nuclear Energy Liability lnsuranc NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ENDORSEMENT TO'CERTIFICATE NO.~N-5 Forming Part of Master Policy No.1 Nuclear Energy Liability Insurance (Secondary Financial Protection)
Effective Au tj t it is agreed that 1.Item 4.of this certificate is amended to read as follows: Item 4.(a)Identification of prima financial rotectio applicable to the nuclear reactor and limit(s)of liability thereof: Facility Form Policies (i)Nuclear Energy Liability Insurance Association's Policy NF-pp7$155,000,000 (ii)Mutual Atomic Energy Liability Under-writers'olicy MF-88$45,000,000 (2)Master Worker Policies (Facility Worker Form)(i)Nuclear Energy Liability, Insurance Association's Master Worker Policy NMWP-1$124 g 000 g 000 (ii)Mutual Atomic Energy Liability Underwriters'aster Worker Policy MMWP-1 36,000,000 (b)The following endorsements attached to the Facility Form policies identified in subsection (a)(1)above also apply to the insurance afforded by this'Master Policy through this certificate as though they were attached hereto: (1)Waiver of Defenses Endorsement (Extraordinary Nuclear Occurrence) and (2)Supplementary Endorsement
-Waiver of Defenses-Reactor Construction at the Facility.(c)Sharing of limit(s)of liability provided under the rimar financial rotection.
(1)The limit of liability provided under each Facility Form policy identified in subsection (a)(1)above is shared among all nuclear reactors on the location described in Item 3 of the Declarations of such policy.
(2}The limit of liability provided under each Master Worker Policy (Facility Worker Form)identified in subsection (a)(2)above is shared among all insureds under all Certificates of Insurance issued to be a part of the Master Worker Policies.2.Only with respect to su'ch insurance as is afforded under this'ertif'cate, the first paragraph of Condition 6, PRIMARY FINANCIAL PROTECTION of the Master Policy-Nuclear Energy Liability Insurance (Secondary Financial Protection),'s amended to read as follows: Regardless of the need>er of policies or contracts oi'rimar financial rotectio applicable to a nuclear incident, the limit of (a)all Facility Form Policies identified in Item 4 (a)(i)of endorsement similar to this endorsement attached to it shall be deemed to be exhausted when the sums paid under said policies are equal to the lesser of (i)the sum of the limit of liability under all such policies, or (ii)two hundred million dollars;(2)a certificate, other than this certificate or a certificate which has a provision identical to (a)(1)above, shall be deemed to be exhausted when the sums paid under said policies are equal to the lesser of (i)the sum of the limit of liability under said policies, or (ii}one hundred sixty million dollars;(b)all Master Worker Policies (Facility Worker Form)identified in Item 4(a)(2)of a certificate shall be deemed to be exhausted when the sums paid under said policies are equal to the lesser of (1)the sum of the limit of liability available under all such Master Worker Policies, or (2)one hundred sixty million dollars plus the amount of all automatic reinstatements of the Policy Aggregate Limit under such policies.Effective Date of this Endorsement Au ust 31 1988 To form a part of of Certificate No.N-59 Issued to 12:01 A.th.Standard>me'da Power 8 Li ht Com an For the Su cribing Companies By General Hanager Countersigned by Tl P 9"cF TefCSMPP'balll A.SRUI1988'Y OF THE ORIGINAL CERTIFICATE, BEARING-THE NUMBER DESIGNATED HEREON, FOR INSURANCE COVERAGE UNDER THE MASTER POLICY-NUCLEAR ENERGY LIABILITY INSURANCE (SECONDARY FINANCIAL PROTECTION}.
NO INSURA ICE IS AFFORDED BY THIS COPY JOI.IN c ARTCC VIGE P IDENT-UNDE WRITING'ellSallUhLI IIRNBUee!~
1 P H J/
i W~Nuclear Energy Liability Insurance MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS ENDORSEMENT TO CERTIFICATE NO.g~Forming Part of Master Policy No.1 Nuclear Energy Liability Insurance (Secondary Financial Protection)
Effective Au ust 31 1988,it is agreed that 1.Item 4.of this certi icate is amended to read as follows: Item 4.(a)Identification of prima fi ancial rotection applicable to the nuclear reactor and limit(s)of liability thereof: (1)Facility Form Policies (i)Nuclear Energy Liability Insurance Association's Policy NF-185$155,000,000 (ii)Mutual Atomic Energy Liability Under-writers'olicy MF-55 (2)$45,000,000 (Facility Worker Master Worker Policies Form)(i)Nuclear Energy Liability Insurance Association's Master Worker Policy NMWP-1$124 g 000 g 000 (ii)Mutual Atomic Energy Liability Underwriters'aster Worker Policy MMWP-1$36'00'00 (b)The following endorsements attached to the Facility Form policies identified in subsection (a)(1)above also apply to the insurance afforded by this Master Policy through this certificate as though they were attached hereto: (1)Waiver of Defenses Endorsement (Extraordinary Nuclear Occurrence) and (2)Supplementary Endorsement
-Waiver of Defenses-Reactor Construction at the Facility.(c)Sharing of limit(s)of liability provided under the rimar financial rotection.
(1)The limit of liability provided under each Facility Form policy identified in subsection (a)(1)above is shared among all nuclear reactors on the location described in Item 3 of the Declarations of such policy.
,m'a flag, 4,'llr I I Cat'
~~'e (2)The limit of liability provided under each Master Worker Policy (Facility Worker Form)identified in subsection (a)(2)above is shared among al'nsureds under all Certificates of Insurance issued to be a part of the Master Worker Policies.C9 IX UJ Z CI C5 U Qc~o ill Ill~I x'.acz o I UJ (UJ 0 G-cc UJ%i~a J oz~<O (g CC o Regardless of tne ncmner of policies or contracts of~rimar financial rotect'o applicable to a nuclear incident, the limit of (a)all Facility Form Policies identified in Item 4 (a)(i)of (1)this certificate or any other certificate having an endorsement.
similar to this endorsement attached to it shall be deemed to be exhausted when the sums paid under said policies are equal to the lesser of (i)the sum of the limit of liability under all such policies, or (ii)two hundred million dollars;UJ UJ CIJ I-W W Cf'X~sa.&%U Ul CO CII-t~I C0 W UJ z cc I-IIJ C=I IJ CC C Cl I O o I~UJCI CO~IJJ I-z 6 (2)a certificate, other than this certificate or a certificate which has a provision identical to (a)(I)above, shall be deemed to be exhausted when the sums paid under said policies are equal to the lesser of.(i)the sum of the limit of liability under said policies, or (ii)one hundred sixty million dollars;CU CC.n oo oz5 Z U,O~Q cr.g 8 cc CI clJ Z UJ+o o~UI CU-Z C-I L-a=5 I-tlat g cn 0 O UIO 0<o I-OZ CO U COI=S~LU-CC CO I-Oz 2.Only with respect to such insurance as is afforded under this certificate, the first paragraph of Condition 6, PRIMARY FINANCIAL PROTECT10N of the Master Policy-Nuclear Energy Liability Insurance (Secondary Financial Protection), is amended to read as follows: (b)all Master Worker Policies (Facility Worker Form)identified in Item 4(a)(2)of a certificate shall be deemed to be exhausted when the sums paid under said policies are equal to the lesser of (1)the sum of the limit of liability available under all such Master Worker Policies, or Effective Date of this Endorsement Issued to (2)one hundred sixty million dollars plus the amount of all automatic reinstatements of the Policy Aggregate Limit, under such policies.Au ust 31, 1988 of Certificate No.H-26-12:Ol A.M.Standard Time Power 8 Li ht Com an Date of Issue r 11 1988 For the Subscribing Companies MUTUAL ATONIC ENERGY LIABILITY ERWRITERS Endorsement No.By Countersigned by Authorized Representative
@,,+~at C('I il, i Nuclear Energy Liability Insurance NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ENDORSEMENT TO'CERTIFICATE NO.~~Forming Part of Master Policy No.l Nuclear Energy Liability Insurance (Secondary Financial Protection)
Effective.
AU Ust 31 1988, it is agreed that 1.Item 4.of this certificate is amended to read as follows: Item 4.(a)Identification of rima financia rotection applicable to the nuclear reactor and limit(s)of liability thereof: (1)Facility Form Policies (i)Nuclear Energy Liability Insurance Association's Policy NF-185$155,000,000 (ii)Mutual Atomic Energy Liability Under-writers'olicy MF-55$4s,ooo,ooo (2)Master Worker Policies (Facility Worker Form)(i)Nuclear Energy Liability Insurance Association's Master Worker Policy RS7P-1$124~000 J 000 (ii)Mutual Atomic Energy Liability Underwriters'aster Worker Policy MMWP-1$36 g 000 I 000 (b)(c)The following endorsements attached to the Facility Form policies identified in subsection (a)(1)above also apply to the insurance afforded by this'Master Policy through this certificate as though they were attached hereto: (1)Waiver of Defenses Endorsement (Extraordinary Nuclear Occurrence) and (2)Supplementary Endorsement
-Waiver of Defenses-Reactor Construction at the Facility.Sharing of limit(s)of liability-provided under the rima financial rotection.
(1)The limit of liability provided under each Facility Form policy identif ied in subsection (a)(1)above is shared among all nuclear reactors on the location described in Item 3 of the Declarations of such policy.
4'i h (2)The limit of liability provided under each Master Worker Policy (Facility Worker Form)identified in subsection (a}(2}above is shared among all insureds under all Certificates of Insurance issued to be a part of the Master Worker Policies.2.Only with respect to such insuxance as is afforded under this FINANCIAL PROTECTION of the Master Policy-Nuclear Energy Liability Insurance (Secondary Financial Protection), is amended to read as follows: Regardless of the number of policies or contxacts of primary f'na ci l rotectio applicable to a nuclear i cident, the limit of (a)all Facility Form Policies identified in Item 4 (a)(i)of (1)this certificate or any other certificate having an endorsement similar to this endorsement attached to it shall be deemed to be exhausted when the sums paid under said policies are equal to the lesser of (i)the sum of the limit of liability under all such policies, or (ii)two hundred million dollars;(2)a certificate, other than this certificate or a certificate which has a pxovision identical to (a)(1)above, shall be deemed to be exhausted when the sums paid under said policies are equal to the lesser of (i)the sum of the limit of liability under said policies, or (ii)one hundred sixty million dollars;(b)all Master Worker Policies (Facility Worker Form)identified in Item 4(a)(2)of a certificate shall be deemed to be exhausted when the sums paid under said policies are equal to the lesser of (1)the sum of the limit of liability available under all such Master Worker Policies, or (2)one hundred sixty million dollars plus the amount of all automatic reinstatements of the Policy Aggregate Limit under such policies.Ef fective Date of this Endorsement Au Ust 31, 1988 12;01 A.th.Standard mme Issued to F1orida Power 8 Li ht Com an To Eorm a part of.of Certificate No.N-26 Date of Issue C 0 8 8 E ORIGINAL THIS IS TO CERTIFY NUMBER DESIGNATFD HEREON, FOR CERTIFICATE, BEARING THE NU, E POLICY-NUCLEAR ENERGY INSURANCE COVFRAGE UNDER THE MAS ER P I.IABII>TY INSURANCE (SECONDARY FIN.ICIAL PROTECTION}.
NO INSUR.NCE IS AFFORD.B JOHN.'.Q A i OCC VICE Md'&hggEgBIPITING 10 AMERICAN NUCLEAR INSU For the Su cribing Companies By General Manager Countersigned by
'I l~As I+a.%J4 n Il'~.~, il*gl/~
Nuclear Energy Liability Insurance MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS ENDORSEMENT TO CERTIFICATE NO.~)~Forming Part of Master Policy No.l Nuclear Energy Liability Insurance (Secondary Financial Protection)
Effective Au ust 31 1988,it is agreed that 1.Item 4.of this certificate is amended to read as follows: applicable to the nuclear reactor and limit(s)of liability thereof: (1)Facility Form Policies (i)Nuclear Energy Liability Insurance Association's Policy NF-185$155,000,000 (ii)Mutual Atomic Energy Liability Under-writers'olicy MF-55$45,000,000 (2)Master Worker Policies (Facility Worker Form)(i)Nuclear Energy Liability Insurance Association's Master Worker Policy NMWP-1$124 g 000 g 000 (ii)Mutual Atomic Energy Liability Underwriters'aster Worker Policy MMWP-1$36 g 000'00 (b)The following endorsements attached to the Facility.Form policies identified in subsection (a)(1)above also apply to the insurance afforded by this Master Policy through this certificate as though they were attached hereto: (1)Waiver of Defenses Endorsement (Extraordinary Nuclear Occurrence) and (2)Supplementary Endorsement
-Waiver of Defenses-Reactor Construction at the Facility.(c)Sharing of limit(s)of liability provided under the rimar financial rotection.
(1)The limit of liability provided under each Facility Form.policy identified in subsection (a)(1)above is shared among all nuclear reactors on the location described in Item 3 of the Declarations of such'olicy.
(2)The limit of liability provided under each Master Worker Policy (Facility Worker Form)identified in subsection (a)(2)above is shared among all insureds under all Certificates of Insurance issued to be a part of the Master Worker Policies.C5 G$%So~Z ww~b w s oo oo~cc wo CL sCO O~~<OGKo X~~wQ G.O C~o K w w>-Cil 61&CC~I-sC CO W G+w oco W O LC w~u-t W)CteC G.Gl O~Co-0 co-ow w~w o<o t-urn/~Cnu.~-~B ct cd sC CD%we-Z Regardless of the number of policies or contracts of~rimar financial rotection applicable to a nuclear inc'dent, the limit of (a)all Facility Form Policies identified in Item 4 (a)(i)of ((endorsement similar to this endorsement attached to it shall be deemed to be exhausted when the sums paid under said policies are equal to the lesser of (i)the sum of the limit of liability under all such policies, or (ii)two hundred million dollars;(2)a certificate, other than this certificate or a certificate which has a provision identical to (a)(1)above, shall be deemed to be exhausted when the sums paid under said policies are equal to the lesser of (i)the sum of the limit of liability under said policies, or (ii)one hundred sixty million dollars;C3 w CK Out 2.Only with respect to such insurance as is afforded under this certificate, the first paragraph of Condition 6, PR1MARY FINANCIAL PROTECTION of the Master Policy-Nuclear Energy Liability Insurance (Secondary Financial Protection), is amended to read as follows: (b)all Master Worker Policies (Facility Worker Form)identified in Item 4(a)(2)of a certificate shall be deemed to be exhausted when the sums paid under said policies are equal to the lesser of, (1)the sum of the limit of liability available under all such Master Worker Policies, or (2)Effective Date of this Endorsement Issued to one hundred sixty million dollars plus the amount of all automatic reinstatements of the Policy Aggregate Limit under such policies.12:01 A.M.Standard Time r 5 Li ht Com an Date of Issue For the Subscribing Companies MUTUAL ATOMIC ENERGY LIABILITY ERWRITERS By Endorsement No.Countersigned by Authorized Representative
't~~)r~j p eg"/
Nuclear Energy Llabllity lnsuranc NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ENDORSEMENT TO'CERTIFICATE NO.N-25 Forming Part of Master Policy No.1 Nuclear Energy Liability Insurance (Secondary Financial Protection)
Effective]988 , it is agreed that 1.Item 4.of this certificate is amended to read as follows: Item 4.(a)Identification of rima financial~otection applicable to the nuclear reactor and limit(s)of liability thereof: (1)Facility Form Policies (i)Nuclear Energy Liability Insurance Association's Policy NF-]85$155,000,000 (ii)Mutual Atomic Energy Liability Under-writers'olicy MF-55$45,000,000 (2)Master Worker Policies (Facility Worker Form)(i)Nuclear Energy Liability Insurance Association's Master Worker Policy NMWP-1$124/000 g 000 (ii)Mutual Atomic Energy Liability Underwriters'aster Worker Poli'cy MMWP-1 ,$36,000,000 (b)The following endorsements attached to the Facility Form policies identified in subsection (a)(1)above also apply to the insurance afforded by this'Master Policy through this certificate as though they were attached hereto: (1)Waiver of Defenses Endorsement (Extraordinary Nuclear Occurrence) and (2)Supplementary Endorsement
-Waiver of Defenses-Reactor Construction at the Facility.(c)Sharing of limit(s)of liability provided under the rimar financial rotection.
(1)The limit of liability provided under each Facility Form policy identified in subsection (a)(1)above is shared among all nuclear reactors on the location described in Item 3 of the Declarations of such policy.
(2)The limit of liability provided under each Master Worker Policy (Facility Worker Form)identified in subsection (a)(2)above is shared among all insureds under all Certificates of Insurance issued to be a part of the Master Worker Policies.2.Only with respect to such insurance as is afforded under this FINANCIAL PROTECTION of the Master Policy-Nuclear Energy Liability Insurance (Secondary Financial Protection), is amended to read as follows: Regardless of the number of policies or contracts of primary.f a cial rotectio applicable to a nuclear i cident, the limit of (a)all Facility Form Policies identified in Item 4 (a)(i)of (1)this ce tificate or any other cert'ficate having an endorsement similar to this endorsement attached to it shall be deemed to be exhausted when the sums paid under said policies are equal to the lesser of (i)the sum of the limit of liability under all such policies, or (ii)two hundred million dollars;(2)a certificate, other than this certificate or a certificate which has a provision identical to (a)(1)above, shall be deemed to be exhausted when the sums paid under said policies are equal to the lesser of (i)the sum of the limit of liability under said poly.cles (or (ii)one hundred sixty million dollars;(b)all Master Worker Policies (Facility Worker Form)identified in Item 4(a)(2)of a certificate shall be deemed to be exhausted when the sums paid under said policies are equal to the lesser of (1)the sum of the limit of liability available under all such Master Worker Policies, or (2)one hundred sixty million dollars plus the amount of all automatic reinstatements of the Policy Aggregate Limit under such policies.Effective Date of this Endorsement Au ust 31, 1988 12:01 A.N.Standard Time Xssued.to F orida Power&Li ht Com an To form a part of of Certificate No.N-25 For the Su cribing Companies General Manager Countersigned by THID~85 I'(PAEkRI';Y bed,'184E E988'F THE ORIGINAL CFRTIFICATE, BEARING THE NUMBER DESlbN I 0 EREON, FOR INSURANCE COVERAGE UNDER THE MASTER POLICY-NUCLEAR ENERGY LIA ILITY!NSURAI'ICE
{SECONDARY F'NCIAL PROTECTION).
NO INSl'RANCE IS AFFOR ED"Y.JOl'.QU(>xi FiO VIC~<ESIDENT-UNQERWRITING AM~cCI$pggppQgQ c 10 4 Pp I hg P A,""'a>)'~