ML101720607
Letter Sequence Acceptance Review | |
---|---|
Initiation Administration Results Other: ML110740501, ML110740509, NOC-AE-11002632, Revised Proposed Amendment to Technical Specification 6.8.3.I for Containment Post-Tensioning System Surveillance Program, NOC-AE-11002665, Proposed Amendment to Technical Specifications for Containment Post-Tensioning System Surveillance Program (Revision 2) (TAC ME3969/ME3970) | |
MONTHYEARML1017206072010-06-21021 June 2010
[Table View]Acceptance Review Email, License Amendment Request, Revise Technical Specification 6.8.3.1, Containment Post Tensioning System Surveillance Program, Consistent with Updated Edition of ASME Code, Section XI Project stage: Acceptance Review ML1102403852011-01-24024 January 2011 Request for Additional Information, License Amendment Request, Revise TS 6.8.3.I, Containment Post Tensioning System Surveillance Program, Consistent with Updated Edition of ASME Code Section XI Project stage: RAI NOC-AE-11002632, Revised Proposed Amendment to Technical Specification 6.8.3.I for Containment Post-Tensioning System Surveillance Program2011-03-0101 March 2011 Revised Proposed Amendment to Technical Specification 6.8.3.I for Containment Post-Tensioning System Surveillance Program Project stage: Other ML1107405092011-03-15015 March 2011 Individual Notice of Consideration of Issuance of Amendment, Revise Technical Specification 6.8.3.I, Containment Post Tensioning System Surveillance Program, Consistent with Updated Edition of ASME Code, Section XI Project stage: Other ML1107405012011-03-15015 March 2011 Letter, Individual Notice of Consideration of Issuance of Amendment, Revise Technical Specification 6.8.3.I, Containment Post Tensioning System Surveillance Program, Consistent with Updated Edition of ASME Code, Section XI Project stage: Other NRC-2011-0063, Individual Notice of Consideration of Issuance of Amendment, Revise Technical Specification 6.8.3.I, Containment Post Tensioning System Surveillance Program, Consistent with Updated Edition of ASME Code, Section Xi2011-03-15015 March 2011 Individual Notice of Consideration of Issuance of Amendment, Revise Technical Specification 6.8.3.I, Containment Post Tensioning System Surveillance Program, Consistent with Updated Edition of ASME Code, Section Xi Project stage: Approval NOC-AE-11002665, Proposed Amendment to Technical Specifications for Containment Post-Tensioning System Surveillance Program (Revision 2) (TAC ME3969/ME3970)2011-05-0202 May 2011 Proposed Amendment to Technical Specifications for Containment Post-Tensioning System Surveillance Program (Revision 2) (TAC ME3969/ME3970) Project stage: Other ML1113702772011-05-27027 May 2011 Issuance of Amendment Nos. 196 and 184, Revise Technical Specification 6.8.3.I, Containment Post Tensioning System Surveillance Program and Surveillance Requirement 4.6.1.6, Containment Prestressing System. Project stage: Approval 2011-03-01 |
ML101720607 | |
Person / Time | |
---|---|
Site: | South Texas |
Issue date: | 06/21/2010 |
From: | Thadani M C Plant Licensing Branch IV |
To: | Harrison A South Texas |
Thadani, M C, NRR/DORL/LP4, 415-1476 | |
References | |
TAC ME3969, TAC ME3970 | |
Download: ML101720607 (2) | |
Similar Documents at South Texas | |
---|---|
Category:Acceptance Review Letter
MONTHYEARML23061A1752023-03-0606 March 2023
[Table view]Supplemental Information Needed for Acceptance of Requested Licensing Action Proposed Alternative to the Requirements of the ASME Code (EPID L?2023?LLR?0004) ML16158A0622016-06-0606 June 2016 Acceptance of Requested Licensing Action Following Supplement, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML15191A0082015-07-17017 July 2015 Acceptance of Application Following Supplement, Revise Technical Specification 6.8.3.j, Containment Leakage Rate Testing Program, to Extend Integrated Leak Rate Test Interval from 10 to 15 Years (TAC MF6176-MF6177) ML12339A2672012-12-0404 December 2012 Acceptance Review Email, Relief Request RR-ENG-3-09, Request for Relief from ASME Code Requirements; Deferral of Code Repair of Essential Cooling Water System Piping Until April 2013 Refueling Outage ML12229A5662012-08-16016 August 2012 Acceptance Review Email, License Amendment Request to Revise Technical Specification 3.3.3.6, Accident Monitoring Instrumentation ML1128004752011-10-0707 October 2011 Acceptance Review Email, Relief Request RR-ENG-3-06 from ASME Code Requirements for Leak Testing Boundaries of Class 1 Pressure-Retaining Components, Third 10-Year Inservice Inspection Interval (TAC ME7053-ME7054) ML1126403682011-09-21021 September 2011 Acceptance Review Email, License Amendment Request, Revise Applicability of Risk-Managed Technical Specifications (TS) to TS 3.7.7, Control Room Makeup and Cleanup Filtration System ML1121404492011-08-0909 August 2011 License Amendment Request to Approve Revision to Fire Protection Program Related to Alternate Shutdown Capability - Acceptable for Review Following Supplement ML1102803632011-01-28028 January 2011 Acceptance Review Email, Amendment to Revise Technical Specifications 5.3.1 and 6.9.1.6. to Allow Fuel Assemblies with Optimized Zirlo Cladding; Associated Exemption from 10 CFR 50.46 and Appendix K (TAC ME5238-39, ME5365-66) ML1100500772011-01-0505 January 2011 Acceptance Review Email, License Amendment Request to Revise Application of Control Risk Management Program in Technical Specification 3.7.7, Control Room Makeup and Cleanup Filtration System ML1025904982010-09-13013 September 2010 Nonacceptance with Opportunity Supplement Email, Relief Request RR-ENG-2-55 from ASME Code Requirements for Weld Examinations, Second 10-Year Inservice Inspection ML1025203042010-09-0909 September 2010 E-mail South Texas Project, Units 1 and 2 - Acceptance Review Email, License Amendment Request to Revise License Condition and Approve Cyber Security Plan ML1021704702010-08-0505 August 2010 Acceptance Review E-mail, License Amendment Request, Revise Action Requirement in Technical Specification 3.7.7, Control Room Makeup and Cleanup Filtration Systems ML1017206072010-06-21021 June 2010 Acceptance Review Email, License Amendment Request, Revise Technical Specification 6.8.3.1, Containment Post Tensioning System Surveillance Program, Consistent with Updated Edition of ASME Code, Section XI ML1014600672010-05-28028 May 2010 License Amendment Request for Approval of the Cyber Security Plan ML1009605152010-04-0606 April 2010 Acceptance Review Email, Relief Request Nos. VRR-01, PRR-03, PRR-02, and PRR-01 for the Third 10-Year Inservice Testing Program Interval ML1003502172010-02-0404 February 2010 Acceptance Review for Application for Withdrawal of Funds from Nrg South Texas'S Nuclear Decommissioning Trust Subaccounts ML1001414922010-01-14014 January 2010 Acceptance Review Email, Request for Exemption from 10 CFR Part 73 Compliance with the New Physical Security Requirements ML0931401942009-11-10010 November 2009 Acceptance Review Following Supplement, Email, Request for Exemption from Certain Requirements of Revised Fitness for Duty Rule Regarding Managing Fatigue During Severe Weather Conditions ML0928004552009-10-0808 October 2009 Supplemental Information Needed for Acceptance Review of Requested Licensing Action Request for Exemption from Requirements of Revised 10 CFR 26.205 During Severe Weather Conditions ML0915507632009-06-0404 June 2009 Acceptance Review Email, License Amendment Request to Revise Operating Licenses, Deviation from Fire Protection Program Requirements ML0913308602009-05-13013 May 2009 Acceptance Review Email, Relief Request RR-ENG-2-52 ASME Code, Section XI Requirements, Essential Cooling Water Code Repair ML0908907692009-03-30030 March 2009 Acceptance Review Email, License Amendment Request, Revise Facility Operating Licenses, Deviation from Fire Protection Program Requirements for Fire Area 27 ML0908904582009-03-30030 March 2009 Acceptance Review Email Adoption of TSTF-511, Rev 0, Eliminate Working Hours Restriction from TS 5.2.2 in Support of Compliance with 10 CFR Part 26 ML0835902212008-12-24024 December 2008 Acceptance Review E-Mail, One-Time Exigent Change, Extension to Allowed Outage Time for Technical Specification 3.7.1.7, Main Feedwater System 2023-03-06 Category:E-Mail MONTHYEARML24086A4212024-06-26026 June 2024
[Table view]Email to Chris Warren Decision on the Exemption Request for South Texas Project ML24086A4252024-06-24024 June 2024 Email to Chris Warren Availability of Environmental Assessment for the South Texas Project Exemption ML24101A0082024-04-10010 April 2024 NRR E-mail Capture - South Texas Project - Relief Request - 50.55a(z)(2) - Rvh Penetration 75 ML24052A0152024-02-20020 February 2024 NRR E-mail Capture - South Texas Project - Request for Additional Information - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications (L-2023-LLE-0046) ML24052A0112024-02-16016 February 2024 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications (L-2023-LLE-0046) ML23334A0062023-11-29029 November 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23319A4442023-11-15015 November 2023 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23278A1532023-10-0505 October 2023 NRR E-mail Capture - South Texas Project Request for Additional Information - Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23264A0972023-09-21021 September 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23255A2862023-09-12012 September 2023 NRR E-mail Capture - South Texas Project Draft Request for Additional Information License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23191A0102023-07-0707 July 2023 NRR E-mail Capture - South Texas Project - Acceptance of Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23145A1872023-05-24024 May 2023 July 2023 Emergency Preparedness Program Inspection - Request for Information ML23124A3272023-05-0404 May 2023 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23115A0702023-04-24024 April 2023 NRR E-mail Capture - South Texas Project Units 1 and 2 - Audit Plan - Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ML23096A1592023-04-0606 April 2023 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code ML23065A0912023-03-0303 March 2023 NRR E-mail Capture - South Texas Project - Draft Supplemental Information Request - Proposed Alternative to the Requirements of the ASME Code ML23003A8082022-11-28028 November 2022 NRR E-mail Capture - Texas Commission on Environmental Quality (TCEQ) Review/Comment Regarding the Draft Environmental Assessment for the South Texas Project Alternate Disposal Request (L-2021-LLL-0022)) ML22249A0692022-09-0606 September 2022 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements (L-2002-LLA-0113) ML22206A0142022-07-20020 July 2022 NRR E-mail Capture - South Texas Project - Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0502022-07-0707 July 2022 NRR E-mail Capture - South Texas Project - Updated Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0492022-06-0808 June 2022 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22123A3272022-05-0303 May 2022 STP EP Exercise Inspection July 2022 RFI ML22115A2632022-04-19019 April 2022 Email Response to David Lochbaum Regarding Interim Configuration of Holtec HI-STORE FW Spent Fuel Multipurpose Canister at South Texas Project Energy Generating Station ML22105A5642022-04-0505 April 2022 Request for Information for Problem Identification and Resolution at STP Nuclear Operating Company ML21344A0072021-12-0909 December 2021 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Alternative Disposal Request ML21305B8022021-11-0101 November 2021 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Inservice Inspection Impracticality ML21257A2262021-09-14014 September 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (L-2021-LLA-0151) ML21160A1522021-06-0909 June 2021 Request for Information NRC Inspection 2021-003 Public Radiation Safety ML21133A2372021-05-0505 May 2021 Request for Additional Information: STP EP Exercise Inspection - July 2021 ML21117A3242021-04-22022 April 2021 NRR E-mail Capture - (External_Sender) STP Questions About Eplan Amendment SE ML21103A0072021-04-12012 April 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Add a Note to TS 3.6.3 and to Remove the TS Index (L-2021-LLA-0041) ML21058A0002021-02-26026 February 2021 NRR E-mail Capture - South Texas Units 1 and 2 - License Amendment Request to Revise Moderator Temperature Coefficient SRs - Audit Plan and Setup of Online Document Access (L-2021-LLA-0004) ML21049A2652021-02-16016 February 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Moderator Temperature Coefficient Surveillance Requirements (L-2021-LLA-0004) ML21039A8902021-02-0808 February 2021 NRR E-mail Capture - South Texas Project - Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML21029A3312021-01-29029 January 2021 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML20244A0222020-08-28028 August 2020 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil. (L-2020-LLA-0172) ML20135H1982020-05-14014 May 2020 NRR E-mail Capture - South Texas Unit 1 - License Amendment Request to Revise Safety Injection System Accumulator Pressure - Audit Plan and Setup of Online Reference Portal ML20125A3312020-05-0404 May 2020 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Emergency Plan (L-2020-LLA-0057) ML20111A0052020-04-17017 April 2020 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME OM Code 2012 Edition - Relief Request PRR-01 ML20050E1192020-02-19019 February 2020 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Actions - Proposed Alternatives to ASME OM Code Requirements (EPID: L 2020-LLR-0007 to L-2020-LLR-0010) ML19344A0092019-12-0909 December 2019 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping ML19309F1412019-11-0404 November 2019 Supplemental Information Request - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L 2019-LLR-0096) (Draft) ML19291A0332019-10-17017 October 2019 NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding Request to Delete E Bar Definition ML19165A1032019-06-14014 June 2019 NRR E-mail Capture - Draft RAI for STP TS 3.8.1.1 Sbdg SR Change ML19162A1162019-05-22022 May 2019 NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding TSTF-529 ML19095A6562019-04-0404 April 2019 NRR E-mail Capture - (External_Sender) Handout for 4/10/19 Meeting to Discuss a Proposed Request for South Texas Project, Units 1 and 2, Regarding Repair of Piping Using Carbon Fiber Repair Methods ML19081A1512019-03-21021 March 2019 NRR E-mail Capture - Draft Round 2 RAI - Sbdg Voltage and Frequency LAR (L-2018-LLA-0078) ML19078A3792019-03-19019 March 2019 NRR E-mail Capture - Acceptance Review Results: STP RR-ENG-3-23 (L-2018-LLR-0021) ML18292A7272018-10-19019 October 2018 NRR E-mail Capture - Acceptance Review Results: TSTF-522 (L-2018-LLA-0271) ML18283B9522018-10-10010 October 2018 NRR E-mail Capture - Final RAI - South Texas Standby DG TS Change (L-2018-LLA-0078) 2024-06-26 |
Text
From: Thadani, Mohan Sent: Monday, June 21, 2010 3:31 PM To: Harrison, Albon Cc: Lingam, Siva; Lent, Susan; Burkhardt, Janet; Khanna, Meena
Subject:
ACCEPTANCE REVIEW FOR AMENDMENT TO TS 6.8.3.1. "COTAINMENT POST-TENSSIONING SYSTEM SURVEILLANCE PROGRAM."
Mr. Edward D. Halpin Chief Nuclear Officer STP Nuclear Operating Company South Texas Project P. O. Box 289 Wadsworth, TX 77483
SUBJECT:
SOUTH TEXAS PROJECT, UNITS 1 AND 2 - RE: AMENDMENT TO TECHNICAL SPECIFICATION 6.8.3.1 "COTAINMENT POST-TENSSIONING SYSTEM SURVEILLANCE PROGRAM." (TAC NOS. ME3969 AND E3970)
Dear Mr. Halpin:
By letter dated May 18, 2010, (ADAMS Accession No. ML101450414), STP Nuclear Operating Company (the licensee) requested the U.S. Nuclear Regulatory Commission (NRC) staff approval of an amendment to Technical Specification 6.8.3.1, "Containment Post-Tensioning System Surveillance Program," for South Texas Project, Units 1 and 2.
The purpose of this letter is to provide the results of the NRC staff
=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1476.
Mohan C Thadani Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-1476 Mohan.Thadani@nrc.gov