Final Inservice Insp Rept Covering 790908-800528.Includes Data Submitted by Southwest Research Institute
ML18045A562
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/18/1980
From: ADAMS A, CHERBA R B, MARTIN S E
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18045A561 List:
References
NUDOCS 8009030627
Download: ML18045A562 (51)


Text

  • . ,. --........ ( '* 1980 INSERVICE INSPECTION' No 6 PALISADES lnJCLEAR PLANT Consumers Power Company Approval of Data Submitted by Examination Agencies .,.. A. System Protection and Laboratory Services (CPCo) B. Southvest Research Institute General Office Palisades Plant ' o'A-/rJ Date Da'.te t ISI Section Heed e!rlro Dat f/;r-/fo Date Dir, Oper Serv Dept Date Approval . r .

Plant 1'1anager r-o Date . * :SJ009030 b2-7

.*, " ,.** ....... ( *,. 1979 PALISADES NUCLEAR PLANT INSERVICE INSPECTION REPORT Submitted in accordance with ASME Boiler and Pressure Vessel Code,Section XI, Article IWA-6000, 1974 Edition with addenda through Summer, 1975. 1) Date: June 9, 1980 2) Corporate Headquarters:

Consumers Power Company 212 W Michigan Avenue Jackson, MI 49201 3) Plant: Palisades Nuclear Power Plant Route 1, Box 178 Covert, MI 49043 4) Unit No: 1 5) Commercial Service Date: December 31, 1971 6). Gross Generating Capacity:

720 Mw electric 2200 Mw thei-mal 7,8,9,10)

See attached table and the remainder of the Final Report 11) Completion Date for Inspections:

May 27, 1980 12) Code Inspector(s):

Christopher Ansorge Michael Walters Steven Rathburn William Vallance 13) Authorized Inspection Agency: The Hartford Steam Boiler* Inspection and Insurance Company Suite 200 14) 15) Abstract:

Signature 26600 Telegraph Road Southfield, MI 48076 See* Final Report *

  • of Inspector:

¥ Component or Appurtenance Reactor Vessel Reactor Vessel Closure Head Pressurizer Steam Generator A (or 1) Steam Generator B (or 2) Primary Coolant Pump # lA I ' *Primary Coolant Pump # lB Primary Coolant Pump #2A Primary Coolant Pump #2B -

... , Item 7, 8, 9, 10 MAJOR COMPONENTS INSPECTED TABLE 1979 PALISADES INSERVICE INSPECTION Manufacturer State Assigned Manufacturer Serial No No Combustion Eng CE-66uo M96725M Combustion Eng CE-66210 M96725M Combustion Eng CE-66601 M96728M Combustion Eng CE-66501 M96126M Combustion Eng CE-66502 M96727M Byron-Jackson 0764 Byron-Jackson 0765 \ Byron-Jackson 0766 Byron-Jackson 0767 National Board No NB 20a27 NB 20827 NB 20851 NB 20849 NB 20850

-,-. 1979 INSERVICE INSPECTION NO 6 PALISADES NUCLEAR PLANT The Inservice Inspection No 6 was conducted during the period 8, 1979 and May 28, 1980. . Inspections were conducted in accordance with the proposed inservice inspection and testing program submitted to the NRC pursuant to 10CFR50.55a(g), for which approval was granted on October 15, 1979 by the NRC, and in accordance with the Palisades Plant Technical Specifications, Sections 4.3 and 4.12. In the event of a conflict between the approved program and the Plant Technical Specifications, the more restrictive requirements were applied. The ASME Boiler and Pressure Vessel Code,Section XI Edition cited in the approved inspection program and the p'1ant Technical Specifications is as follows: ITEM Class 1, 2 and 3 . High Energy Piping EXAMINATION 74S75 74S75 ACCEPTANCE 74s75, 74S75 The NDT examinations were performed using manual and mechanized ultrasonic (UT), liquid penetrant (PT), magnetic particle (MT), visual (VT), and radiogra:phic (RT) techniques.

Indications were recorded following applicable procedures; reportable indications which were judged by the examination agencies to be relevant were documented and transmitted to CPCo :.personnel for evaluation.

CPCo evaluated all reportable indications and dispositioned each by either "accepting as is" or by performing the necessary cosmetic filing, grinding, repair or replacement.

Two main examination agencies were engaged in on-site NDT-ISI activities, Southwest Research Institute (SwRI) and CPCo System Protection and Laboratory Services (SP&LS). They were supplemented in repair activities by Conam Inspection, Trans-Eastern Inspection and UTEC/American X-Ray and Inspection.

Inservice tnspection No 4 was originally scheduled*

to begin in August, 1977. However, approval from the NRC allowed the.Palisades operating license to be amended to permit 18 months to elapse between refueling outages. Therefore, Inservice Inspection No 4 was postponed to January, 1978. Because of this postponenent, only two refueling outages, No 4 & 6 were available during the second third to conduct an ISI. Inservice Inspection No 4 was the first inspection conducted and Inservice Inspection No 6 was the last inspection conducted in the second interval third of the present ten year interval.

Frequency requirements for the second interval third of the present interval third have been met.

.----.. I i \. Approval Sheet Title Page Table of Contents NRC Report Tables 1&2 Data Certification NIS-1 Form Inspection Control Mechanisms Specification Plant Procedure Appendix I Examination Table Appendix II Examination Agency Control Appendix III Examination Procedures Appendix TV Reference Drawings Appendix V New Calibration Standards Appendix VI Personnel Certifications Appendix VII Material Certifications Appendix VIII . Equipment Certifications Data Data Data TABLE OF CONTENTS Volume I Volume II Volume III Volume TV Volume V Volume VI Volume VII

( '. . \, 2 Data Data I.E. Bulletin Data SwRI Calibration Sheets SP&LS Technique Sheets Appendix IX Inspection Resulutions DR's CNF's Appendix X Volume VIII , Volume IX Volume X Volume XI Volume XII I.E. Bul.letin Examination Table Volume XIII Pressure Test Data

-. Palisades Final Report ' !SI No. 6 " '* Table 1 Page 1 of 1 TABLE 1 ,.. RESOLUTION OF REPORTABLE INDICATIONS EXAMINATION CONDITION REPORTING COMPONEtl'l' METHOD(S)

REPORTED MECHANISM DISPOSITION RE INSPECTION DISPOSITION Closure Nute 14 MT. *ftiurtace Condition CNF 79-11-PAL Accept As-Ia Shallow Knick& DR ID-PAL 79-150 Closure Nute NB MT Surface Condition CNF 79-11-PAL Accept As-Is Shallow Knicks DR ID-PAL 79-150 Closure Nuts 110 MT Surface Condition CNF 79-11-PAL Accept As-Is e Shallow Knicks DR ID-PAL 79-150 Closure Nuts Ill MT Surface Condition CNF 79-11-PAL Accept As-Is Shallow Knicks DR ID-PAL 79-150 Closure Nuts il3 MT Surface Condition CNF 79-11-PAL Accept As-Is Shallow Knicka DR ND-PAL 79-150 Closure Nuts 115 MT Surtace Condition CNF 79:-11-PAL Accept As-Is Shallow Knicks DR ID-PAL 79-150 Closure Nuts 119 MT Surra.Ce Condition.

CNF 79-11-PAL Accept As-Ia Shallow Knicks .DR ID-PAL 79-150 Closure Nuts 120 MT Surface Condition CNF 79-11-PAL Accept As-Is Shallow Knick&* DR ID-PAL 79-150 Closure Nuts 121 MT Surface Condition CNF 79-29-PAL Accept As-Is Shallow Knicka DR ND-PAL Bo-Closure Washers (Old) VT Surface Condition CNF 79-10-PAL Accept As-Ia 11,2,27,29-39,41, Shallow Knicks DR ID-PAL 79-151 42,45,46 Closure Washers (Nev) VT Surface Condition CNF 79-10-PAL Accept As-Is 14-20 Shallow Knicka DR ID-PAL 79-151 Outlet Manvay Nuts VT Gouges in Nuts DR IRJK 102679-2 Accept As-Is (S/G A) Primary Hanway Outlet Ma.nvay Nute VT Gouges in Nuts DR IRJK 102679-1 Accept As-Is (S/G B) Primary Nanvay 11 CVC-2-LDL-2Bl-33PR-l VT Missing Nut CNF 79-024-PAL Replace Nut and Acceptable and Bolt DR ID-PAL-79-165 Bolt.Reinspect COMPONENT CVC-2-LDL-2U2-20PR CVC-2-LDL-2B2-21PR PCS-30-RCL-2B-l , VALVES MJ 3041 MO 3045 ESS-12-SlS-lLP-207 PS ESS-12-SlS-lLP-216 PR ESS-12-SlS-lLP-220

_PR E3S-10-SlS-Ll'A-222 PR FWS-18-F"WL-lSl-2113 FWS-18-FWL-181-2115 .Fl*IS-lU-FWL-lSl-258 PR-1 F'i/S-18-FWL-lSl-253 PR-2 FWS-lo-FWL-251-259 EXAl.JINATION METHOD(S)

VT VT UT VT VT PT VT VT V'r RT RT VT VT u*r TABLE l* l'u.lisades Final Report ISI No. 6 Table 1 Page 2 of 1 RESOLUTION OF REPORTABLE INDICATIONS CONDITION REPORTED Loose Nuts and Bolts Loose Nuts and Bolts Slag Crystalline Deposit on Pu.eking Gland Crystc.lline Deposit on Packing Oland Porosity and Slag. Missing Nut c;.nd Bolt Luose and .. 1-\issing Nuts Loose N\lt and Bolt. Missing Nut, Slag Linear ::nci.ication Insuf. Er.gagement

  • :ns*..:f.

Engagement Crack-like Indications in Held REPORTIHG MECHANISM CNF 79-0211-PAL DR #D-PAL-79-164 CNF 79-024-PAL DR #D-PAL-79-164 CNF 79-022-PAL DR #D-PAL-79-167 CNF 79-023-PAL DR #D-PAL-79.:168 CNF 79-023-PAL DR #D-PAL-79-168 CNF 79-008-PAL DR P.D-PAL-79-159.

CUF 79-003-PAL DR /ID-PAL-79-155 CNF 79-002-PAL DR #D-PA!.-79-154 CHF 79-001-PAL DR #D-PAL-79-153 DR UROP 0928-79-2 DR GROP 1010-79-1 DR #HRS 012360-1 DR tt:rns 012380-1 CNF 79-004-l:'AL DR #D-PA!..-79-158 DISPOSITION Tighten Nuts and Bolts and Reinspect Tighten Nuts and Bolts and Reinspect Accept As-Is Clean, Reinspect Clean, Reinspect Reinspect Replace and Reinspect Tightened and Rerilaced Nuts, Reinspect Repair and Reinspect Accept As-Is Accept As-Is Accept As-Is Q,A-19 Initi:ited ER PAL 79-49. Replace Piping RE INSPECTION Acceptable_

Acceptable Acceptable Leakage. Acceptable Acceptable Cocked Anchor . Bol't Acceptable DISPOSITION Valve Packing Adjusted Acceptable Replaced Anchor Bolt by Bechtel IE Bulletin 79-02, 79-14 COMPO NEil'!' EXAMINA'l'ION ME."THOD( S) FWS-18-FWL-2Sl-259 PR-1 VT FWS-18-FWL-2Sl-259 PR-2 VT MSS-36-MSL-151-211 RT MSS-36-MSL-2Sl-207 PS PT CCS-20-CPU-lPA-PS VT ccs-16-CPU-lPB-PS VT CCS-20-CPU-lPC-PS VT CCS-16-CPU-lPC-PS VT CCS-24-RHC-lPl-PR-3 VT CCS-18-RHC-lPl-PR-l VT CCS-10-ARll-lPl-PR-l VT CCS-10-ARH-lPl-PR-3 VT CCS-10-CSH-lPl-PS-2 VT CCS-10-CSll-lPl"'."PR-6 VT 'l'ABLE 1 Palisades Pinal Report ISJ No. 6 Table 1 Page 3 of 7 RESOLUTION OF REPOR'I'ABLE INDICATIONS CONDI'l'ION REPORTED Insur. Engap;ement Insuf. Engagement Slag Crack Indication on Stanchion Inadequate

'!bread Engagement Travel Setting Outside Mfrs Range* Base Plate Bolt Inadequately Engaged, Excess Weld Build-up Travel Setting Outside Mfrs Range Bent Clevis, Sheared Cotter

  • Pine Insufficient gagement, cracked Cement, Missing Nute and Bolte Loose Mounting Plate Bolts Missing and Bent Bolts 7 Rounded Indications I.Oose Nuts on Restraint REPORTING MECHANISM DR IRRS 012380-1 DR NRRS 012380-1 DR IROP 092879-1 CNF 79-017-PAL DR ID-PAL-79-152 DR IRRS 100179-1 DR IRJK 100379-1 . DR IRRS 100179-2 DR IJK 100379-2 DR URRS 100179-3 DR IRRS 100279-1 DR IRRS 100179-4 DR NRRS 100179-5 CNF-79-019-PAL DR ID-PAL-79-166 CNF 79-014-PAL DR ND-PAL-79-146 DISPOSITION Accept As-Is Accept As-le Accept As-Is Grind out;Reweld Accept As-le Remove and Verify Proper Range , Reinspect Accept As-Is RE INSPECTION Acceptable Acceptable .Acceptable Remove and Verify Acceptable Proper Range, Reinspect Clevis and Cotter Acceptable Pine Replaced Replace Anchor Bolte Acceptable and Jam Nuts, Reinspect Tighten Bolts, Reinspect Replace Restraint and Bolts, Reispect Accept As-Is Tighten Nuts and Reinspect Crooked Anchor Bolte, Reinspect Acceptable Acceptable DISPOSITION Anchor Bolte Replaced Accept TABLE 1 RESOLUTION OF REPORTABLE EXAMINA'l'ION CONDITION REPORTING COMPONEN'I' Ml:.'THOD{

S) REPORTED MECHANISM CCS-10-CSll*lP4-PS-l VT Slag CNF 79-015-'PAL DR ND-PAL-79-144 CCS-10-CSH-1P4-PS-2 VT Slag CNF-79-016-PAL DR ND-PAL-79-145 SFP-14-FPF-RLl-PR-l VT Misalignment DR IRRS 100379-1 SFP-6-CPL-SLl-PR-4 VT Nonsupporting, DR NRRS 100479-4 Misalignment SFP-6-CPL-SLl-PR-5 VT Nonsupporting, DR IRRS 100479-5 Misalignment SWS-24-CCS-RLH-PR-l VT Loose Nuts and DR NRRS 100279-2 Bolts, Missing Cotte.r Pin SWS-24-CSW-SHl-PS VT Corrosion DR IJK 100279-1 SWS-16-SWP-OLA-PS VT Corrosion DR IJK 100479-1 SWS-16-SWP-OLB-PS VT Corrosion DR IJJK 100479-2 SWS-16-SWP-OLC-PS VT Corrosion DR NJK 100479-3 SWS-10-CRS-RL3-PS-4 VT Incomplete Weld CNF-79-025-PAL DR ID-PAL-79-170 SWS-10-CRS-SL3-PR-4 VT Loose Turnbuckle CNF-79-013-PAL DR /JD-PAL-79-149 SWS-10-CRS-SL4-PS-l VT Cracked Welds, CNF-79-020-PAL Missing Welds DR ID-PAL-79-147 Palisades IS! No. 6 Table 1 Final Report ' Page 4 of 7 INDICATIONS DISPOSITION RE INSPECTION Accept As-Is Accept As-Is Analyzed by Bechtel Installed per IE Bulletin Modified 79-02, 79-14 Unit Analyzed by Bechtel Acceptable per IE Bulletin 79-02, 79-14 Analyzed by Bechtel Removed Hanger, per IE Bulletin Adequate Support 79-02, 79-14 Without It Tighten Nuts and Accepttlble Bolts, Replace Cotter Pin, Reinspect Remove Corrosion, Acceptable Repaint, Reinspect Remove Corrosion, Acceptable Repaint, Reinspect Remove Corrosion, Acceptable Repaint, Reinspect Remove Corrosion, Acceptable Repaint, Reinspect Analyzed by Bechtel Accept As-ls IE 79-02, 79-14 Readjust Support, Acceptable Reinspect Analyzed in Conjunction Acceptable with E-PAL-80-007.

Re-placed vith Ronvelded Support Plate ,,.. DISPOSITION Acceptable e

.. Palisades Final Report ISi No. 6 } Table 1 Page 5 of 7 TABLE 1 RESOLU'rION OF' REPOR'l'ABLE INDICA'l'IONS EXAMINATION CONDITION REPORTING COMPONEN'l' ME'l'HOD(S)

REPORTED MECHANISM DISPOSI'l'ION RE INSPECTION DISPOSITION SWS-10-CRS-Sr.4-PS-2 VT Cracked Welds CNF-79-018-PAL Replaced'Support Acceptable Missing Welde DR #D-PAL-79-148 Without Welded Connections.

Reinspect SWS-6-CRS-lRl-PS VT Incomplete Weld CNF-79-025-PAL Analyzed by Bechtel Accept As-le DR #D-PAL-79-170 per IE Bulletin 79-02. 79-14 e SWS-6-CRS-152-PS VT Missing Nut on CNF-79-028-PAL Tighten Nute

  • Corrosion Remove Cor-Floor Plate DR #D-PAL-79-169 Reinspect roeion
  • repaint
  • Reinspec_t.

Acceptable VT Slag CNF-79-017-PAL Accept As-le DR ID-PAL-79-171 SWS-6-EPS-RLA-PR-5 VT Nonsupporting DR #RJK 092779-2 Tighten Locknut Acceptable Restraint and Ensure Support* Reinspect SWS-6-EPS-RLA-PR-6 VT Miealigrunent, DR #RJK 092779-1 Readjust 'l\lrnbuckle Acceptable Insufficient and Tighten Lockouts*

'lb read Reinspect Engagement SWS-6-EPS-RLA-PR-9 VT Insufficient DR #RJK 100179-2 Tighten Nut. Acceptable Engagement Reinspect SWS-6-EPS-RLA-PR-10 VT Loose Locknut DR NRJK 100179-1 Tighten IDcknut. Acceptable Reinspect SWS-6-EPS-SLA-PR-l VT Corrosion DR NRRS 100479-1 Remove Corrosion.

Acceptable Repaint. Reinspect SWS-6-EPS-SLA-PR-2 VT Corrosion DR NRRS 100479-2 Remove Corrosion.

Acceptable

-:-..._ Repaint. Reinspect SWS-6-EPS-SLA-PR-3 VT Corrosion DR #RRS 100479-3 Remove Corrosion.

Acceptable Repaint. Reinspect SWS-6-EPS-SLA-PR-4 VT Corrosion OR #RJK 100179-3 Remove Corrosion.

Acceptable Repaint. Reinspect Palisades Final Report IS! No. 6 Table l Page 6 of 1 TABLE l RESOLUTION OF REPORTABLE INDICATIONS EXAMINATION CONDITION REPORTING COMPONEN'r REPORTED MECHANISM DISPOSITION RE INSPECTION DISPOSITION SWS-6-EPS-SLA-PR-6 VT Loose Locknut DR IRJK 092779-4 Tighten Locknuts , Acceptable Reinspect SWS-6-EPS-SLA-PR-7 VT Loose Locknut D,R IRJK 092179-3 Remove Corrosion, Acceptable Corrosion Repaint, Tighten Locknut, Reinspect SWS-6-EPS-5LB-PR-l VT. Nut Inadequately DR IRJK 09279-5 Replace Anchor Bolt Acceptable

'!breaded Verity Acceptability SWS-6-EPS-5LB-PR-5 VT Nut Inadequately DR IRJK 100279-4 Tighten Bolt arid Acceptable

'!breaded Nut, Reinspect SWS-6-EPS-SLB-PR-6 VT Nut Inadequately DR IRJK 100279-l Remove Corrosion, Acceptable

'!breaded Repaint, Tighten Corrosion Locknut, Reinspect SWS-6-EPS-SLB-PR-8 VT Corrosion DR IRJK 100279-2 Remove Corrosion, Acceptable Repaint, Reinspect SWS-6-EPS-SLB-PR-9 VT Nonsupporting DR IRJK 100279-3 Add Locknuts and Acceptable Restraint, no Readjust to Support Locknut& Pipe, Reinspect FWS-18-FWL-151-251 PR VT Missing Nut CNF".'79-006-PAL Accept As-Is DR ID-PAL-19-156 FWS-18-FWL-151-257 RT Linear and Crack-DR IROP 092779-2 QA-19 Initiated Acceptable e Like Indications ER PAL 79-49 Replace piping FWS-18-FWL-lSl-258 RT Linear and Crack-DR #ROP 092779-1 QA-19 Initiated Like Indications ER PAL 79-49 Replace Piping Acceptable FWS-18-FWL-151-259 RT Linear and Crack-DR IROP 092779-l QA-19 Initiated Like Indications ER PAL 79-49 Replace Piping Acceptable FW6-18-FWL-l6l-260 RT Linear and Crack-DR IROP 092779-1 QA-19 Initiated Like Indications ER PAL Replace iping Acceptable FWS-18-FWL-151-261 RT Linear and Crack-DR #ROP 092779-1 *QA-19 Initiated Like Indications ER PAL Replace ip ng Acceptable FWS-18-FWL-161-261 UT Linear and Crack-CNF-79-007-PAL QA-19 Initiated*

Like Indications*

DR ID-PAL-79-157 ER PAL 79-49 Replace Piping Acceptable

,,,.----.

TAULE 1 RESOLU'rION OF REPORTABLE EXAMINATION CONDITION REPORTING COMPONEN'J' ME.'rHOD( S) REPORTED MECHANISM FWS-18-*--WL-lSl-262 RT Linear and Crack-DR #ROP 092779-1 Like Indications FWS-18-FWL-2Sl-259 RT Linear and Crack-DR NROP 092779-2 Like Indications FWS-18-FWL-2Sl-260 RT Linear and DR IROP 092779-2 Like Indications FWS-18-F'Wi,..;2Sl-261 RT Linear and Crack-DR IROP 092779-2 Like Indications FW8-18-*'WL-281-262 RT Linear and Crack-DR IROP 092779-2 Like Indications FW8-18-FWL-281-262 UT Linear and Crack-CNF-79-005-PAL Like Indications DR #D-PAL-79:-158 FW8-18-FWi.-2Sl-263 RT Linear and Crack-DR IROP 092779-2 Like Indications . Palisades Final Report !SI No. 6 Table 1 Page 7 of 7 INDICA'l'IONS DISPOSITION REINSPECT ION QA-19 Initiated ER PAL 79-49 Replace Piping Acceptable QA-19 'initiated ER PAL 79-49 Replace Piping Acceptable QA-19 .Initiated ER PAL 79-49 Replace Piping Acceptable QA-19 Initiated ER PAL 79-49 Replace Piping Acceptable QA-19 Initiated ER PAL 79-49 Replace Piping Acceptable QA-19 Initiated ER PAL 79-49 Replace Piping Acceptable QA-19 Initiated ER PAL 79-49 Replace Piping Acceptable DISPOSITION e

v ASME SEC. IX ASME SEC. IX I'J'EM NO. CAT. NO. lll.9 B-G-1 Ul.15 B-N-1 lil. 3 B-C Bl.8 B-G-1 lll.8 B-G-1 1n.8 B-G-1 Bl.8 B-G-1 Bl.8 B-G-:-1 IH.8 B-G-1 Bl.8 13-G-l Bl.8 B-G-1 lll.8 B-G-1 lll.8 B-G-1 lll.8 B-G-1 Bl.8 B-G-1 Bl.8 B-G-1 lll.8 B-G-1 Bl.8 B-G-1 Bl.8 B-G-1 Bl.8 B-G-1 ,, .....

'!'ABLE 2 PALISADES INSERVICE INSPEC'l'ION NO. 6 Palisades Final Report ISI No. 6 '!'able 2 Page 1 of 26 Swnmary of Areas Examined and Results EXAM COMPONENT ME'rHOD(S)

IDENTIFICATION U'l' Flange Ligaments RV'r Vessel Interior UT 6-118A Head-to-Flange MT Closure Studs N3 MT Closure Studs N4 MT Closure Studs N5 MT Closure Studs N6 MT Closure Studs N7 MT Closure Studs NB MT Closure Studs N9 M'r Closure Studs NlO M'l' Closure Studs Nll MT Closure Studs Nl2 MT Closure Studs Nl3 Closure Studs N14 M'l' Closure Studs Nl5 MT Closure Studs Nl6 MT Closure Studs Nl7. MT Closure Studs Nl8 M'r Closure Studs Nl9 EXAMINATION RESULTS Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable v .. __ Palisades Final Report ..... -. IS! No. 6 Table 2 Page 2 of 26 TABLE 2 PALISADES INSERVICE INSPECTION NO. 6 SU11UDary of Areas Examined and Results ASME SEC. IX ASHE SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S)

IDENTIFICATION EXAMINATION RESULTS Bl.8 B-G-1 MT Closure Studs 620 Acceptable Bl.8 B-G-1 UT Closure Studs 63 Acceptable Bl.8 B-G-1 UT Closure Studs #4 Acceptable Bl.8 B-G-1 UT Clo.sure studs 65 Acceptable IU.8 B-G-1 UT Closure Studs H6 Acceptable Bl.8 B-G:..l UT Closure Studs H7 Acceptable Bl.8 B-G-1 UT Closure Studs 118 Acceptable Bl.8 B-G-1 UT Closure Studs 69 Acceptable Bl.8 B-G-1 UT Closure Studs #10 Acceptable Bl.8 B-G-1 UT Closure Studs #11 Acceptable Bl.8 B-G-1 UT Closure Studs 612 Acceptable Bl.8 B-G-1 UT Closure Studs 613 Acceptable Bl.8 B-G-1 UT Closure Studs 614 Acceptable Bl.8 B-G-1 UT Closure studs 615 Acceptable Bl.8 B-G-1 UT .Closure Studs 616 Acceptable Bl.8 B-G-1 UT Closure Studs 617 Acceptable Bl.8 B-G-1 UT Closure Studs #18 Acceptable Bl.8 B-G-1 UT Closure Studs 619 Acceptable Bl.8 B-G-1 UT Closure Studs 620 Acceptable Bl.8 B-G-1 wr Closure Nuts 63 Acceptable v ... *--.. Palisades Final Report IS! No. 6 Table 2 Page 3 of 26 , TABLE 2 PALISADES INSERVICE INSPECTION NO. 6 Swnmary of Areas Examined and Res.ul ts ASME SEC. IX ASME SEC. IX EXAM COMPONENT ITEM NO. CA'l'. NO. METHOD(S)

IDENTIFICATION EXAMINATION RESULTS Bl.8 B-G-1 MT Closure Nuts /14 See Table 1 Bl.8 B-G-1 MT Closure Nuts 115 Acceptable Bl.8 B-G-1 MT Closure Nuts 116 Acceptable Bl.8 B-G-1 MT Closure Nuts /J7 Acceptable Bl.8 B-G-1 MT Closure Nuts 118 See Table 1 Bl.8 J3-;G-l MT Closure Nuts 119 Acceptable Bl.8 B-G-1 MT Closure Nuts /JlO See Table 1 Bl.8 B-G-1 MT Closure Nuts /ill See Table 1 Bl.8 B-G-1 MT Closure Nuts /112 Acceptable Bl.8 B-G-1 MT Closure Nuts /113 See Table 1 Bl.8 B-G-1 MT Closure Nuts /Jl4 Acceptable Bl.8 B-G-1 MT Closure Nuts /Jl5 See Table 1 Bl.8 B-G-1 MT Closure Nuts /Jl6 Acceptable Bl.8 B-G-1 MT Closure Nuts /121 See Table 1 Bl.8 B-G-1 MT Closure Nuts IJ18 Acceptable Bl.8 B-G-1 MT Closure Nuts /119 See Table 1 Bl.8 B-G-1 MT Closure Nuts /120 See Table 1 Bl.8 B-G-1 UT Closure Nuts /13 Acceptable Bl.8 B-G-1 UT Closure Nuts /14 Acceptable 111.8 B-G-1 U'r Closure Nuts 115 Acceptable Bl.8 .B-G-1 UT Closure Nuts N6 Acceptable j,


Palisades Final Report *' -ISI No. Table 2 Page 4 of 26 TABLE 2 PALISADES INSERVICE INSPECTION NO. 6 Summary of Areas Examined and Results ASME SEC. IX ASME SEC. EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S)

IDENTIFICATION EXAMINATION RESULTS Bl.8 B-G-1 UT Closure Nuts 117 Acceptable Bl.8 B-G-1 UT Closure Nuts NB Acceptable Bl.8 B-G-1 UT Closure Nuts 119 Acceptabie JU.8 B-G-1 UT Closure Nuts 1110 Acceptable Bl.8

  • B-G-1 UT Closure Nuts #11 Acceptable Bl.8 B-G-1 UT Closure Nuts 1112 Acceptable Bl.8 B-G-1 UT Closure Nuts 1113 Acceptable lll.8 B-G-1 UT Closure Nuts 1114 Acceptable Bl.8 B-G-1 UT Closure Nuts 1115 Acceptable Bl.8 B-G-1 UT Closure Nuts 1116 Acceptable Bl.8 B-G-1 UT Closure Nuts 1117 Acceptable Bl.8 B-G-1 UT Closure Nuts 1118 Acceptable Bl.8 B-G-1 UT Closure Nuts 1119 & 1120 Acceptable Bl.XO B-G-1 VT Closure Washers (Old) See Table 1 Bl.10 B-G-1 VT Closure Washers (Nev) 114-1120 See Table 1 Bl.10 B-G-1 VT Closure Washers (New) S-1 Acceptable Bl.11 B-G-2 VT Instrument Flange Bolting 1146 Acceptable Bl.11 B-G-2 VT Instrument Flange Bolting 1147 Acceptable Bl.11 B-G-2 VT Instrument Bolting 1148 Acceptable Bl.11 B-G-2 VT Instrument Flange Bolting 1149 Acceptable Bl.11 B-G-2 VT Instrument FLange Bolting 1150 Acceptable

Palisades Final Report -* !SI No. Table 2 Page 5 of26 .. TABLE 2 PALISADES INSERVICE INSPECTION NO. 6 Summary of Areas Examined and Results ASME SEC. IX ASME SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S)

IDENTIFICATION EXAMINATION RESULTS Bl.11 B..,G-2 VT Instrument Flange Bolting #51 Acceptable lll.11 B-G-2 VT Instrument Flange Bolting 1152 Acceptable Bl.11 B-G-2 VT Instrument Flange Bolting 1153 Acceptable e* B2.l B-B UT .2-982-C (Pressurizer)

Acceptable B2.2 B-D UT 3-985 (Pressurizer)

Acceptable B2.4 B-F PT PCS-6-PRS-lBl-l Acceptable B2.4 B-F UT PCS-6-PRS-lBl-l Acceptable ll2.8 B-H UT 4-984/5-984 ( Pressuri z*er) Acc'eptable B3.l B-B UT 1-4-941 .* Acceptable B3.l B-B Mech UT 1-11-943 (S/G A) Acceptable

  • B3.l B-ll Mech UT 1-2-941 ( S/G A) Acceptable B3.l B-B Mech UT 1-3-953 (S/G A) Acceptable B3.l B-B UT l-l-943E (S/G A) Acceptable e B3.l B-B UT l-l-953E (S/G A) Acceptable B3.l . B-B UT l-l-953F (S/G A) Acceptable B3.2 B-D UT l..;9-954B (S/G A) Acceptable B3.2 B-D UT l-9-954B-IRS (S/G A) Acceptable B3 .. 10 B-G-2 VT Outlet Manway (S/G A) Acceptable B3.10 B-G-2 VT Outlet Manway Nuts (S/G A) See Table 1 B3.10 B-G-2 VT Outlet Manway Nuts (S/G B) Ill See Table 1 B3.10 B-G-2 VT Inlet Manway Nuts (S/G A) 112 Acceptable ASME SEC. IX ASME SEC. IX ITEM NO. CAT. NO. B3.l B-B B3.l B-B B3.l B-B B3.l B-B B3.l B-B B3.l B-B B3.2 B-D B3.2 B-D B3.10 B-G-2 [13.10 B-G-2 B3.7 B-B B3.l B-B B3.l B-B B3.2 B-D B3.l B-B B3.l B-B B3.2 B-D ll4 .1 B-F A4.l B-F Bl1.l B-F TABLE 2 Palisades Final Report !SI No. 6 *rable 2 Page 6 of. 26 PALISADES INSERVICE INSPECTION NO. 6 SUmma.ry of Areas Examined and Results EXAM COMPONENT METHOD(S)

IDENTIFICATION Mech U'r 2-11-943 (S/G B) Mech UT 2-2-941 (S/G B) Mech UT 2-3-953 (S/G B) UT 2-l-953C (S/G B) UT 2-l-953D (S/G B) UT 2-l-953E (S/G B) UT 2-9-954A (S/G B) UT 2-9-954A-IRS (S/G B) VT Inlet Manvay Studs (S/G B.) VT Inlet Manvay Nuts (S/G B) UT 2-SK-953 (S/G B) UT 03 (E-56A) U'l' 04 (E-56A) UT 01 (E-56A) UT 03 (E-56B) UT 04 (E-56B) UT 01 (E-56B) P'r PCS-30-RCL-lA-9 UT PCS-30-RCL-lA-9 P'l' PCS-30-RCL-2B-7 EXAMINATION RESULTS Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable v ASME SEC. IX ASHE SEC. IX ITEM NO. CAT. NO. B4.l B-F B4.5 B-J B4.12 B-G-2 B4.8 B-J B4 .. 10 B-K-2 B4.10 B-K-2 B4.10 B-K-2 B4.10 B-K-2

  • B4.10 B-K,-2 B4.10 B-K-2 B4.10 B-K-2 B4.10 B-K-2 B4.10' B-K-2 B4.10 B-K-2 B4.10 B-K-2 B4.10 B-K-2 B4.10 B-K-2 84.10 B-K-2 84.10 B-K-2 Bli.10 B-K-2 84.8 B-J Bli.10 B-K-2 TABLE 2 PALISADES INSERVICE INSPECTION N0.6 Palisades Final Report ISI No.6 Table 2 Page 7 of 2 6 Summary of Areas Examined and Results EXAM COMPONENT METHOD(S)

IDENTIFICATION UT PCS-30-RCL-2B-7 UT PCS-2.5-PRS-1P2-l VT PCS-2.5-PRS-1P2-8BT PI' CVC-2-CHL-1A2-4 VT CVC-2-LDL-2Bl-20PR VT CVC-2-LDL-2Bl-25PR VT CVC-2-LDL-2Bl-31PR VT CVC-2-LDL-2Bl-33PR-l VT CVC-l-LDL-2Bl-33PR-2 VT CVC-2-LDL-2B2-8PR VT CVC-2-LDL-2B2-13PR VT CVC-2-LDL-2B2-18PR VT CVC-2-LDL-2B2 19PR VT CVC-2-LDL-2B2 19PL-l VT CVC-2-LDL-2B2 19PL-2 VT CVC-2-LDL-2B2-20-PR VT CVC-2-LDL-2B2-21PR VT CVC-2-LDL-2B2-27PR-l VT CVC-2-LDL-2B2-27PR-2 v*r CVC-2-LDL-2B2-34PR Pl' CVC-2-PSS-lPl-6 VT CVC-2-PSS-1Pl-32PR-C EXAMINATION RESULTS Acceptable Acceptable e Acceptable Acceptable Acceptable' Acceptable Acceptable See Table 1 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable See Table 1 See Table 1 Acceptable Acceptable Acceptable Acceptable Acceptable I.

v ---Palisades Final Report .-'-...:...

!SI No. 6 ' ' Table 2 ' Page 8 of 26 'rABLE 2 PALISADES INSERVICE INSPECTION N0.6 Swrunary of Areas Examined and Results ASME SEC. IX ASME-SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S)

IDENTIFICATION EXAMINATION RESULTS B5.9 B-G-2 VT 1A-2BT-B-l-16 Acceptable

  • B5.9 B-G-2 VT 1A-2BT-W-l-16 Acceptable B5.4 B-K-1 UT lA-S-A Defer to Outage N7 B5.4 B-K-1 UT lA-S-B Defer to Outage #7 UT PCS-72-RCL-lA Acceptable B5.9 B-G-2 VT 1B-2BT-B-l-16 Acceptable B5.9 B-G-2 VT 1B-2BT-W-l-16 Acceptable B5.5 B-K-2 VT lB-SS Acceptable UT PCS-72-RCL-lB Acceptable B5.9 B-G-2 VT 2A-2BT-B-l-16 Acceptable B5.9 B-G-2 VT 2A-2BT-W-l-16 Acceptable B5.5 B-K-2 VT 2A-SS Acceptable UT PCS-72-RCL-2A Acceptable B5.9 B-G-2. VT 2B-2BT-B-l-16 Acceptable

-B5.9 B-G-2 VT 2B-2BT,-W-l-16 Acceptable UT PCS-72-RCL-2B Acceptable Cl.l C-A UT 1-4-951 ( S/G A) Acceptable Cl. 4 C-D VT l-959-09BT Acceptable Cl.4 C-D PT l-959-09BT Acceptable C2.5 C-E-1 Pr MSS-36-MSL-1Sl-207PS Acceptable C2.l C-G R'r MSS-36-MSL-lSl-210 Acceptable C2.l C-G R'r MSS-36-MSL-lSl-211.

See Table 1 C2.l C-G -Li'!' MSS-36-MSL-181-211 Acceptable C2.6 C-E-2 V'l' MSS-36-MSL-211A-PR-C*

ASME SEC. IX ASME SEC. IX ITEM NO. CAT. NO. C2.l C-G C2.l C-G C2.5 C-E-1 C2.l C-G C2.l C-G c2.6 C-E-2 C2.l C-G C2.l C-G C2.l C-G C2.l C-G C2.l C-G C2.l C-G C2.l C-G C2.l C-G C2.5 C-E-1 C2.l C-G C2.l C-G C2.l C-G C2.l C-G C2.l C-G C2.l C-G C2.6 C-E-2 C2.5 C-E-1 C2.l C-G C2.l C-G TABLE 2 PALISADES INSERVICE INSPEC'l'ION NO. 6 Palisades Final Report ISI No. 6 Table 2 Page 9 of 26 Swnmary of Areas Examined and Results EXAM COMPONENT METHOD(S)

IDENTIFICATION RT MSS-36-MSL-lSl-216 RT PT MSS-36-MSL-2Sl-207PS RT MSS-36-MSL-2Sl-212 RT MSS-36-MSL-2Sl-213 VT MSS-36-MSL-2Sl-213A-PR-A RT MSS-36-MSL-281-218 RT MSS-36-MSL-281-219 RT FWS-18-FWL-lSl-242 RT FWS-18-FWL-lSl-243 UT FWS-18-FWL-lSl-243 RT FWS-18-FWL-181-244 RT FWS-18-FWL-lSl-245 RT FWS-18-FWL-1Sl-256A MT FWS-18-FWL-1Sl-256PL-l RT FWS-18-FWL-281-241 R'l' FWS-18-FWL-281-242 RT FWS-18-FWL-281-244 RT FWS-18-FWL-281-245 RT FWS-18-FWL-281-251 RT VT FWS-18-FWL-281-257-PR MT FWS-18-FWL-281-257-PLl RT fWS-18-FWL-281-258 U'l' FWS-18-FWL-281-259 EXAMINATION RESULTS Acceptable Acceptable See Table 1 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable See Table 1 Acceptable Acceptable See Table 1 Acceptable e Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable

Acceptable Acceptable Acceptable See Table 1 ' I:

v ASME SEC. IX ITEM NO. C2.l C2.l C2.6 C2.l C2.5 c2.5 C2.l C2.2 C2.2 C2.5 C2.6 C2 .. l C2.5 C2.5 C2.6 C2.l C2.6 ASME SEC. IX CAT. NO. C-G C-F C-E-2 C-F C-E-1 C.,-E-1 C-F C-F C-F C-E-1 C-E-2 C-F C-E-1 C-E-1 C-E-2 c..;p C-E-2 / TABLE 2 Palisades Final Report !SI No. 6 Table 2 Page 10 of 26 PALISADES INSERVICE INSPECTION NO. 6 Summary of Areas Examined and Results EXAM METHOD(S)

VT VT VT vT VT UT UT 1/T UT PT PT UT UT UT PT v*r U'l' PT PT VT UT VT COMPONENT IDENTIFICATION FWS-6-AWS-OLA PR FWS-6-AWS-OLB PR-1 FWS-6-AWS-OLB PR-2 FWS-6-AWS-SLB PR-1 FWS-6-AWS-SLB PR-2 ESS-14-SFP-TEM-201 ESS-8-SlS-LPA-217 ESS-10-SlS-LPA-222PR ESS-lO-SlS-LPB-220 ESS-10-SlS-LPB-219PL-l ESS-10-SlS-LPB-219PL-2 ESS-12-SlS-lA6-201 ESS-14-SCS-2Hl-203LI ESS-14-SCS-2Hl-203LO ESS-14-SCS-2Hl-204PS ESS-14-SCS-2Hl-204PSS ESS-10-SDC-XC0-205 ESS-10-SDC-XC0-205PS ESS-12-SlS-1LP-207PS ESS-12-SlS-lLP-207PR ESS-12-SlS-lLP-210 ESS-12-SlS-lLP-216PR EXAMINATION RESULTS Acceptable Acceptable

  • 9 Acceptable Acceptable Acceptable Acceptable Acceptable See Table 1 Acceptable Acceptable Acceptable Defer to Outage #7 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable See Table 1 Acceptable Acceptable See Table 1 L ASME SEC. IX ITE>t NO. C2.6 C2.l C2.l C2.l B4.9 C2.l C2.l C2.l C2.l C2.l C2.6 ASME SEC. IX CAT. NO. C-E-2 C-F C-F C-F B-K-1 C-F C-F C-F C-G C-G C-E-2 TABLE 2 PALISADES INSERVICE INSPECTION NO. 6 Swnmary of Areas Examined and Results EXAM COMPONENT METHOD(S)

IDENTIFICATION VT ESS-12-SlS-lLP-220PR UT UT ESS-12-SlS-lLP-225 UT ESS-12-SlS-lLP-229 Palisades Final Report !SI No. 6 Table 2 Page 11 of 26 PT ESS-12-SlS-2Bl-9PL-l-4 UT ESS-lO-SDC-XlA-201 UT ESS-10-SDC-XOA-208 UT ESS-10-SDC.-XOB-205 UT ESS-6-SlS-lHP-201 UT ESS-6-SlS-lHP-203 VT ESS-6-SlS-2HP-216PR v*r PCS-10-PRH-lPl PR-1 VT PCS-10-PRH-lPl PR-2 VT PCS-10-PRH-1P2 PR-1 VT PCS-10-PRH-1P2 PR-2 VT PCS-6-PRS-lAl PR-1 VT PCS-6-PRS-lAl PR-2 VT PCS-6-PRS-lAl PR-3 VT PCS-6-PRS-lAl PR-4 VT PCS-6-PRS-lAl PR-5 VT PCS-6-PRS-lAl PR-6 VT PCS-6-PRS-lBl PR-1 VT PCS-6-PRS-lBl .PR-2 EXAMINATION RESULTS See Table l Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable

_Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable I:

ASME SEC. IX ASME SEC. IX ITEM NO. CAT. NO. TABLE 2 PALISADES INSERVICE INSPECTION N0.6 Palisades Final Report !SI No. 6 Table 2 Page 12 of '-26 Sununary of Areas Examined and Results EXAM COMPONENT

_ METHOD(S)

IDENTIFICATION VT PCS-6-PRS-lBl PR-3 VT PCS-6-PRS-lCl PR-I VT PCS-6-PRS-ICI PR-2 VT PCS-6-PRS-ICI PR-3 VT PCS-6-PRS-lCl PR-4 VT SWS-24-CCS-RLH PR-1 VT SWS-24-CCS-RLH PR-2 VT SWS-24-CSW-HCL PS VT SWS-24-CSW-SHI PS VT SWS-24-CSW-SH2 PR-1 VT SWS-24-CSW-SH2 PR-2 VT SWS-24-CSW-SH2 PS VT SWS-16-CRS-SHI

_PS VT SWS-.12-CRS-SHI PR VT SWS-12-CRS-SH2 PS-I VT SWS-12-CRS-SH2 PSS-I VT SWS-16-SWP-OLA PS VT SWS-16-SWP-OLB PS VT SWS-16-SWP-OLC PS VT SWS-12-CRS-RH2 PR VT SWS-10-CRS-SLl PS VT SWS-10-CRS-SLI PR-I VT SWS-10-CRS-SLl PR-2 VT SWS-10-CRS-SL3 PS-I EXAMINATION RESULTS Acceptable Acceptable Acceptable Acceptable Acceptable See Table I Acceptable Acceptable See Table I Acceptable Acceptable Acceptable

  • Acceptable Acceptable Acceptable Acceptable See Table l See Table l See Table l Acceptable Acceptable Acceptable Acceptable Acceptable l'

v ASME SEC. IX IT.E.M NO. ASME SEC.. IX . CAT. NO. TABLE 2 PALISADES INSERVICE INSPECTION NO. 6 Summary of Areas Examined and Results Palisades Final Report !SI No. 6 Table 2 Page 13 of 26 EXAM COMPONENT METHOD($)

IDENTIFICATION VT SWS-l0-CRS-SL3 PSS-1 VT SWS-10-CRS-SL3 PS-2 VT SWS-10-CRS-SL3 PS-3 VT SWS-10-CRS-SL3 PSS-3 VT SWS-10-CRS-SL3 PS-4 VT SWS-10-CRS-SL3 PSS-4 VT SWS-10-CRS-SL3 PR-4 VT SWS-10-CRS-SL3 PS-5 VT SWS-10-CRW-SL3 PSS-5 VT SWS-10-CRS-SL4 PS-1 VT SWS-10-CRS-SL4 PSS-1 VT SWS-10-CRS-SL4 PS-2 VT SWS-10-CRS-SL4 PR-3 VT SWS-10-CRS-SL4 PR-4 VT SWS-10-CRS-SL4 PS VT SWS-10-CRS-SL4 PSS VT SWS-10-CRS-SL4 PSS-2 VT SWS-10-CRs-sµi PS-3 VT SWS-10-CRS-SL4 PL-1 VT SWS-10-CRS-SL4 PL-2 VT SWS-10-CRS-SL4 PSS-3 EXAMINATION RESULTS Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable See Table l Acceptable Acceptable See Table l Acceptable See Table l Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable

'l'ABLE 2 PALISADl<:S INSEHVICE INSPECTION NO. 6 Summary of Areas Examined and Results ASME SEC. IX ASME SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S)

IDENTIFICATION VT SWS-10-CRS-RLl PS-1 V'r SWS-10-CRS-RLl PS-2 VT SWS-10-CRS-RL3 PS-1 VT SWS-10-CRS-RL3 PR-1 VT SWS-10-CRS-RL)

PS-2 VT SWS-10-CRS-RL3 PS-3 V'r SWS-10-CRS-RL3 PS-4 VT SWS-10-CRS-RL3 PS-5 VT SWS-10-CRS-RL4 PR-1 VT SWS-10-CRS-RL4 PS-1 VT SWS-10-CRS-RL4 PR-2 V'r SWS-10-CRS-RL4 PS-2 VT SWS-10-CRS-RL4 PS-3 VT SWS-10-CRS-RL4 PS-4 VT SWS-10-CRS-RL4 PS-5 VT SWS-10-CRS-RL4 PL-1 VT sws-10.:.cRS-RL4 PL-2 VT sWS-6-CRS-lSl PS VT. SWS-6-CRS-lSl PSS VT SWS-6-CRS-1S2 PS VT SWS-6-CRS-2Sl PS VT SWS-6-CRS-2S2 PS-1 V'l' ::;ws-6-CRS-2S2 PS-2 VT SWS-6-CRS-2S2 PS-3 Pulisudes Final Report ISI No. 6 'l'able 2 Puge 14 of 26 EXAMINATION RESULTS Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable See Table 1 Acceptable

Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable See Table 1 Acceptable Acceptable Acceptable Acceptable ASME SEC. IX ITEM NO. ASME SEC. IX CAT. NO. '!'ABLE 2 INSERVICE INSPECTION NO. 6 Sununary of Areas Examined and Results EXAM METHOD(S)

VT VT VT VT VT VT VT VT VT VT VT VT VT VT VT VT VT VT VT VT V'f COMPONENT IDENTIFICATION SWS-6-CRS-3Sl PS-1 SWS-6-CRS-3Sl PS-2 SWS-6-CRS-3Sl PS-3 SWS-6-CRS-3S2 PS-1 SWS-6-CRS-3S2 PS-2 SWS-6-CRS-4Sl PS SWS-6-CRS-4S2 PS-1 SWS-6-CRS-4S2 PS-2 SWS-6-CRS-4S2 PS-3 SWS-6-CRS-lRl PS SWS-6-CRS-1R2 PS SWS-6-CRS-2Rl PS-2 SWS-6-CRS-2R2 PS-1 SWS-6-CRS-2R2 PS-2 SWS-6.-CRS-3Rl PS-1 sws-6-CRS-3R2 PS-1 SWS-6-CRS-3R2 PS-2 SWS-6-CRS-3R2 PS-3 SWS-6-CRS-4Rl PS-1 SWS-6-CRS-4Rl PS-2 SWS-6-CRS-4R2 PS-1 SWS-6-CRS-4R2 PS-2 SWS-6-CRS-4R2 PS-3 Palisades Final Report IS! No. 6 *rable 2 Page 15 Of;.>6 EXAMINATION RESULTS Acceptable See Table 1 Acceptable e Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable See Table 1 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable

.... ASME SEC. IX ITEM NO. ASME SEC. IX CAT. NO. TABLE 2 PALISADES INSERVICE INSPECTION N0.6 Summary of Areas Examined and Results EXAM COMPONENT METHOD(S)

IDENTIFICATION VT SWS-6-EPS-RLA PR-1 VT SWS-6-EPS-RLA PR-2 VT SWS-6-EPS-RLA PR-3 VT SWS-6-EPS-RLA PR-4 VT SWS-6-EPS-RLA PR-5 VT SWS-6-EPS-RLA PR-6 VT SWS-6-EPS-RLA PR-7 VT SWS-6-EPS-RLA PR-8 VT SWS-6-EPS-RLA PR-9 VT SWS-6-EPS-RLA PR-10 VT SWS-6-EPS-RLA PR-11 VT SWS-6-EPS-RLB PR-1 VT SWS-6-EPS-RLB PR-2 VT SWS-6-EPS-RLB PR-3 VT SWS-6-EPS-RLB PR-3A VT SWS-6-EPS-RLB PR-4 VT SWS-6-EPS-SLA PR-1 V'r SWS-6-EPS-SLA PR-2 VT SWS-6-EPS-SLA PR-3 VT SWS-6-EPS-SLA PR-4 VT SWS-6-EPS-SLA PR-5 v*r SWS-6-EPS-SLA PR-6 VT SWS-6-EPS-SLA PR-7 Palisades Final Report ' ISI No. 6 Table 2 Page 16 of26 EXAMINATION RESULTS Acceptable Acceptable Acceptable Acceptable See Table 1 See Table 1 Acceptable Acceptable See Table 1 See Table 1 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable See Table 1 See Table 1 See Table 1 See Table 1 Acceptable See Table 1 See Table 1

'l'ABLE 2 PALJ::;ADES INSERVICE INSPt:C'l'ION NO. 6 Sununary of Areas Examined and Results ASME SEC. IX ASME SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S)

IDENTIFICATION VT SWS-6-EPS-SLA PR-8 VT SWS-6-EPS-SLA PR-9 VT SWS-6-EPS-SLA PS VT sws-6..:.EPS-SLB PR-1 V'l' SWS-6-EPS-SLB PR-3 VT SWS-6-EPS-SLB PR-4 VT SWS-6-EPS-SLB PR-5 ... SWS-6-EPS-SLB PR-6 VT V'l' SWS-6-EPS-SLB PR-7 VT SWS-6-EPS-SLB PR-8 VT SWS-6-Ers..:.sLB PR-8A VT SWS-6-EPS-SLB PR-9 VT. SWS-6-EPS-SLB PS V'l' CCS-24-CPU-lPA PR VT CCS-20-CHX-lPl PR-1 V'l' CCS-20-CHX-lPl-PR-2 V'r CCS-20-CHX-lPl PR-3 V'l' CCS-20-CHX-RLB PS V'l' CCS-20-CPU-lPA PR V'l' CCS-20-CPU-lPA PS VT CCS-16-CPU-lPA PS V'l' CCS,-20-CPU-lPB PS VT CCS-16-CPU-lPB PS V'r CCS-20-CPU-lPC PS Palisades Fii1al Report ISI No. 6. 'l'able 2 Page 17 of ) EXAMINATION RESULTS Acceptable Acceptable Acceptable See Table 1 Acceptable Acceptable See Table 1 See Table 1 Acceptable See* Table 1 Acceptable See Table 1 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable See Table 1 Acceptable Acceptable See Table 1 See Table l ASME SEC. IX ITEM NO. ASME SEC. IX CAT. NO. 'rABLE 2 PALISADES INSERVICE INSPECTION N0.6 Swnmary of Areas Examined and Results EXAM COMPONENT IDENTIFICATION VT CCS-16-CPU-lPC PS VT CCS-18-RHC-lPl PR-1 VT CCS-18-RHC-lPl PR-2 VT CCS-24-RHC-lPl PR-3 VT CCS-10-ARH-lPl PR-1 VT CCS-10-ARH-lPl PR-2 ' V'l' CCS-10..,ARH-lPl PR-3 VT CCS-10-ARH-lPl PR-4 V'l' CCS-10-CSH-lPl PR-1 VT CCS-10-CSH-lPl PS-1 VT CCS-10-CSH-lPl PR-2 VT CCS-10-CSH-lPl PS-2 VT CCS-10-CSH-lPl PR-3 VT CCS-10-CSH-lPl PR-4 VT CCS-10-CSH-lPl PR-5 Palisades Final Report ISI No. 6 Table 2 Page 18 of 26 VT CCS-10-CSH-lPl PR-5AA VT CCS-10-CSH-lPl PR-6 VT CCS-10-CSll-lPl PR-7 VT CCS-10-CSll-1P3 PR VT CCS-10-CSH-1P3 PL-1 VT CCS-10-CSH-1P3 PL-2 V'l' CCS-10-CSH-1P3 PL-3 VT CCS-10-CSll-1P3 PL-4 EXAMINATION RESULTS See Table 1 See Table 1 Acceptable See Table 1 See Table 1 Acceptable See Table 1 Acceptable Acceptable Acceptable Acceptable See Table 1 Acceptable Acceptable Acceptable Acceptable See Table 1 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable ASME SEC. IX ITEM NO. ASME SEC. IX CAT. NO. 'l'ABLE 2 PALISADES INSERVICE INSPECTION NO. 6 Swnmary of Areas Examined and Res;u_ts EXAM METllOD(S)

VT VT COMPONENT IDENTIFICATION CCS-10-CSH-1P4 PR-1 CCS-10-CSH-1P4 PS-1 Palisades Final Report ISI No. 6 Table 2 Page 19 of 26 . VT CCS-10-CSH-1P4 PS-lAA v*r CCS-10-CSH-1P4 PL-1 V'r CCS-10-CSH-1P4 PL-2 VT CCS-10-CSH-1P4 PL-3 VT CCS-10-CSH-1P4 PL-4 VT CCS-10-CSH-1P4 PR-2 V'l' CCS-10-CSH-1P4 PS-2 VT CCS-10-CSH-1P4 PR-3 VT CCS-10-CSH-1P4 PS-3 VT CCS-10-CSH-1P4 PR-4 VT CC$-10-CSH-1P4 PR-5 V'r CCS-10-CSH-1P4 PR-6 VT CCS-10-CSH-1P4 PR-7 VT PR-1 VT SFP-14-FPF-RLl PR-2 VT SFP-12-SFX-RLl

    • PR-1 VT SFP-12-SFX-RLl PR-2 VT SFP-10-FPP-lPA PR-1 VT SFP-10-FPP-lPA PS v*r SFI'-10-FPP-lPA V'r SFP-10-FPP-lPB PR EXAMINATION RESULTS Acceptable See Table 1 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable See Table 1 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable See Table 1 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Palisades Final Report !SI No. 6 '!'able 2 Page 20 of 26 TABLE 2 PALISADBS INSERVICE INSPECTION NO. 6 Swnmary of Areas Examined and Results ASME SEC. IX ASME SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S)

IDENTIFICATION EXAMINATION RESULTS VT SFP-10-FPP-lPB PS Acceptable VT SFP-8-FPP-lPA

  • PR-1 Acceptable VT SFP-8-FPP-lPA PR-2 Acceptable e VT SFP-8-FPP-lPA PR-3 Acceptable VT SFP-8-FPP-lPA PR-4 Acceptable VT SFP-8-CPL-DLl PR-1 Acceptable VT SFP-8-CPL-DLl PR-2 Acceptable VT SFP-8-CPL-DLl PS Acceptable VT SFP-8-CPL-DLl PR-3 Acceptable VT SFP-6-CPL-SLl PR-1 Acceptable VT SFP-6-CPL-SLl PR-2 Acceptable VT SFP-6-CPL-SLl PR-3 Acceptable VT SFP-6-CPL-SLl PR-4 See Table 1 VT SFP-6-CPL-SLl PR-5 See Table 1 e V'l' SFP-6-CPL-SLl PR-6 Acceptable VT DMW-6-CST-AFS PR-1 Acceptable B-I-1 PT Reactor Vessel Closure Head Acceptable Patch N4 Bl.13 B-I-1 VT Reactor Vessel Closure Head Acceptable Patch N4 Bl.13 B-I-1 P'l' Reactor Vessel Closure Head Acceptable Patch b6 fll.13 B-I-1 VT Reactor Vessel Closure Head Acceptable Patch N6 B4.5 B-J l.J'l' PCS-42-RCL-ltt-6 Acceptable ASME SEC. IX ASME SEC. IX ITEM NO. CA'l'. NO. B4.5 B-J B4.5 B-J B4.5 B-J B6.9 B-G-2 B6.9 B-G-2 B6.9 B-G-2 B6.9 B-G-2 B6.9 B-G-2 /,.*---... TABLE 2 Palisades Final Report !SI No. 6
  • Table 2 Page 21 of 26 PALISADES INSERVICE INSPECTION N0.6 Swnmary of Areas Examined and Results EXAM COMPONENT METHOD(S)

IDENTIFICATION l1l' PCS-30-RCL-lB-l u*r PCS-30-RCL-2B-l l1l' ESS-2.5-SIS-lBl-18 VT CK-3102 VT CK-3116 VT M0-3008 VT M0-3041 VT M0-3045 \ ) EXAMINATION RESULTS Acceptable See Table 1 Acceptable Acceptable Acceptable Acceptable See Table 1 See Table 1 ASME SEC. IX ITEM NO. C2.l C2.l C2.l C2.l 0 . c2 .. 1 C2.l C2.l C2.l C2.l C2.l C2.l C2.l C2.l C2.l C2.l C2.l C2.l C2.l c2.1 C2.l ASME SEC. IX CAT. NO. C-G C-G C-G C-G C-G C-G C-G C-G C-G C-G C-G C-G C-G C-G C-G C-G C-G C-G C-G C-G .. IE BULLETIN TABLE 2 Palisades Final Report !SI No. 6 Table 2 Page 22 of 26 INSERVICE INSPECTION NO. 6 Summary of Areas Examined and Results EXAM COMPONENT METHOD(S)

IDENTIFICATION VT CCS-10-CSH-1P4/PR-7 VT CCS-10-CSH-1P4/PL-3 UT CVC-4-BAI-1P4-205 UT CVC-4-BAI-1P4-206 UT. CVC-4-BAI-1P6-201 UT CVC-4-BAI-1P6-201A UT CVC-4-BAI-1P7-201 UT CVC-3-BAI-1P2-203 UT CVC-3-BAI-1P7-232 U'l' CVC-3-BAI-1P8-205 UT CVC-4-BAP-SBL-201 UT CVC-4-BAP-5LB-201 UT ESS-10-CSS-SLB-201 UT ESS-8-CSS-SLB-212 UT ESS-8-CSS-SLB-219 UT ESS-6-SlS-2HP-209 UT ESS-6-SlS-3HP-206 UT ESS-4-SlS-HPB-210 UT ESS-3-SlS-HPA-235 UT ESS-3-SlS-HPB-227 UT ESS-3-SlS-HPC-214 UT ESS-3-SlS-3HP-201 UT ESS-4-SlS-HPB-204 UT ESS-3-SlS-HPC-216 EXAMINATION RESULTS Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable

  • Acceptable Acceptable Acceptable Acceptable Acceptable . Acceptable Acceptable Acceptablle Acceptable

Acceptable Acceptable y ASME SEC. IX ITEM NO. C2.3 C2.l C2.6 C2.l C2.6 c2.6 C2.l C2.l C2.6 C2.l C2.l c2.6 C2.6 C2.l C2.l C2.l C2.l C2.l C2.3 C2.l C2.l C2.6 C2.6 ASME SEC. IX CAT. NO. C-G C-G C-E-2 C-G C-E-:2 C-E-2 C-G C-G C-E-2 C-G C-G C-#-2 C-E-2 C-G C-G C-G C-G C-G C-G C-G C-G C-E-2 C-E-2 IE BULLh"l'IN

'rABLE 2 Finul Report ISI No. 6 '!'able 2 Page 23 of 26 PALISADES INSERVICE INSPECTION NO. *6 Swnmury of Areas Examined and Results EXAM CQMPONENT ME'l'llOD(S)

IDENTIFICATION UT ESS-3-SlS-HPB-230 u*r FWS-18-FWL-lSl-246/6-AWS-lSl RT FWS-18-FWL-lSl-248 VT FWS-18-FWL-lSl-248 PR R'l' FWS-18-FWL-lSl-251 VT FWS-18-FWL-lSl-251 PR VT FWS-18-FWL-lSl-252 PR RT F'WS-18-FWL-lSl-255 RT FWS-18-FWL-lSl-256 VT F'WS-18-FWL-lSl-256 PR R'r FWS-18-FWL-lSl-257 RT F'WS-18-FWL-lSl-258 VT F'WS-18-FWL-lSl-258 PR-1 V'l' FWS-18-FWL-lSl-258 PR-2 RT FWS-18-FWL-lSl-259 R'r FWS-18-FWL-lSl-260 RT FWS-18-FWL-lSl-261 U'P F'WS-18-FWL-lSl-261 R'l' FWS-18-FWL-lSl-262 UT FWS-18-FWL-2Sl-241/FWS-6-AWS-2Sl R'l' RT FWS-18-FWi.-2Sl-249

-VT FWS-18-F'WL-2Sl-249 PR VT FWS-18-FWL-2Sl-252 PR EXAMINATION RESULTS Acceptable Acceptable Acceptable

    • Acceptable Acceptable See Table 1 Acceptable Acceptable Acceptable Acceptable See Table 1 See Table 1 Acceptable Acceptable See Table 1 See Table 1 See Table 1 See Table 1 See Table 1 Acceptable Acceptable Acceptable Acceptable Acceptable v Palisades Final Report IS! No. 6 \ Table 2 IE BULLRl'IN Page 24 of26 TABLE 2 PALISADES INSERVICE INSPECTION N0.6 Summary of Areas Examined and Results ASME SEC, IX ASME SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S)

IDENTIFICATION EXAMINATION RESULTS c2.6 C-E-2 VT FWS-18-FWL-2Sl-253 PR Acceptable

.. c2.6 C'-E-2 VT FWS-18-FWL-2Sl-257 PR Acceptable C2.l C-G RT FWS-18-FWL-2Sl-259*

See Table 1 e c2.6 C-E-2 VT FWS-18-FWL-2Sl-259 PR-1 Acceptable C2.6 C-E-2 VT FWS-18-FWL-2Sl-259 PR-2 Acceptable C2.l C-G RT FWS-18-FWL-2Sl-260 See Table 1 c2.1 C-G RT FWS-18-FWL-2Sl-261 See Table 1 C2.l C-G RT FWS-18-FWL-2Sl-262 See Table 1 C2.l C-G UT FWS-18-FWL-2Sl-262 See Table 1 C2.l C-G RT FWS-18-FWL-2Sl-263 See Table 1 UT SFP-14-FPF-RLl-303 Acceptable UT SFP-14-FPF-RLl-301 Acceptable UT SFP-8-CPL-DLl-320 Acceptable UT SFP-8-CPL-DLl-321 Acceptable UT SFP-8-FPF-RLl-304 Acceptable UT SFP-8-FPF-RLl-222 Acceptable UT SFP-8-FPF-RLl-224 Acceptable UT SFP-8-FPF-RLl-225 Acceptable UT SFP-6-SRT-RLl-225 Acceptable UT SFP-3-FPP-FPB-301 Acceptable UT SFP-3-FPP-FPB-303 Acceptable C2.l C-G UT RWS-6-CWR-SL4-202 Acceptable ASME.SEC.

IX ITEM NO. C2.l ASME SEC. IX CAT. NO. C-G IE BULLETIN TABLE 2 Palisades Final Report ISI No. 6 Table 2 Page 25 of *26 PALISADES INSERVICE INSPECTION N0.6 Summary of Areas Examined and Results EXAM COMPONENT METHOD(S)

IDENTIFICATION UT RWS-4-CWT-lPl-203 MT Feedvater Nozzle ID S/G a MT Feedvater Nozzle ID S/G B EXAMINATION RESULTS Acceptable Acceptable Acceptable

\ i ASME SEC. IX ITEM NO. ASME SEC. IX CAT. NO. IWA-5221 TABLE 2 Palisades Final Report IS! No. Table 2 Page 26 of 26 PALISADES INSERVICE INSPECTION N0.6 Summary of Areas Examined and Results EXAM METHOD(S)

FLT HYD FLT FLT HYO HYO HYD HYO HYD HYO HYO FLT FLT HYD FLT COMPONENT.

IDENTIFICATION Alixiliary Feedwater System & T81 and T-2 Containment Vent *Header, Quench Tank SI Bottle Vents PCS-PC-Pump Seal Chemical and Volume Control Redundant HPSI HPSI MSS to Aux Feed Pump Critical Service Water Header B Service Water Header A Waste Gas Tank Piping SI Tank Fill and Drain Lines Component Cooling Primary System Make-Up Storage Tank T-90, T-91 Spent Fuel Pool Cooling PCS Leak Test ,_ . ... EXAMINATION RESULTS Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable FORM NIS-1 OWNERS' DATA. REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules . 1. Owner Consumers Power Companv 212 W Michigan Avenue Jackson. MI 49201 (Name and Address of Owner) 2. Plant __

........

_____ _ (Name and Address of Plant) 3. Plant Unit ___ _..... __ .._ __ 4. Owner Certificate of Authorization (if required)

___ N......_/,....._

___ _ 5. Commercial Service Date 12/31/71 6. National Board Number for Unit

  • ___ N=--/A""---------
7. Components Inspected Component or Appurtenance Manufacturer or Installer Manufacturer or Installer Serial No. (See.Examination Tables in Final Report ........ ) ___ _ State or Province No. National Board No. Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided ( 1) size is 8'h in. x 11 in., '2) information in items 1 through 6 on this data report is included on each sheet, and (3) each sheet is numbered .ind the number o.f sheets is recorded at the cop of this form.
      • FORM NIS-1 (back) 8. Examination Dates 9 /8/79 to 5/28/80 9. Inspection Interval from J0/31 /.76 to_ 6/30/83 10. Abstract of Examinations.

Include a list of examinations and a statement concerning status of work required for current interval.

See Tables in Final Report 11. Abstract of Conditions Noted.

  • See Final Report 12. Abstract of Corrective Measures Recommended and.Taken See Final Report We certify that the .statements made in this report are correct and the examinations and corrective sures taken conform to the rules of the ASME Code,Section XI. Date ____ (p"'-+-/ ........ 9_-_ i9 'BO I Signed Copsrnners Power Co Owner Certificate of Authorization No. (if applicable)

____ N __ /_A ____ Expiration Date ---=N"-"/-=A..;;._..,..------

CERTIFICATE OF lNSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel *Inspectors and/or the State or Province of Michigan and employed by HSBI & I Co of Hartford Conn. have inspe/d the components described in this Owners' Data Report duri_ng the period

  • 9 /8179 to
  • 6 9 /80 , and state that to the best of my knowledge and belief, the Owner has performed examinations

?n(f;aken corrective measures described in this Owners' Data Report in accordance with the requirements of the ASME Code,Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concer:ning the examinations and corrective measures described in this Owners' Data Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

<!:ommissions

___

....

.... o ....

__ _ National Board, State, Province and No. *The Authorized Inspection Agency (Company) nor the Inspector(s) assumes no liability with respect to any object referred to in this report, except such liability as may be provided in a policy of insurance which the Company may issue upon said object and then only in accordance with the terms of said *policy. . ... " i /

( \ *, DATA CERTIFICATION Southwest Research Institute SwRI forwarded to CPCo seven volumes of information pertaining to the 1979 Palisades Inservice Inspection.

The seven volumes, approved for tion by C E Lautzenheiser, SwRI Level III, containing the following:

1) UT Cal Block Certifications
2) Personnel Certifications
3) Material and Equipment Certifications
4) Field Data The information contained in the seven volumes supplied by SwRI was extracted from these volumes and placed in the appropriate section of the Palisades Plant Outage/Plan.*

The approval sheets, are included herein;

( ' ( .e SwRI Data Certification SOUTHWEST RESEARCH INSTITUTE Post Office Drawer 28510 6220 Culebra Road San Antonio, Texas 78284 1979 INSERVICE EXAMINATION OF PALISADES NUCLEAR POVvER PLANT Prepared by: Project Engineer Reviewed by: Project Manager VOLUME I CERTIFICATIONS SwRI PROJECT 17-3620 CONTENTS:

MATERIAL ANO EQUIPMENT CERTIFICA TlONS MATERIAL EQUIPMENT TRANSDUCERS PERSONNEL CERTIFICA TlONS

  • ULTRASONIC CALIBRATION BLOCK CERTIFICATIONS Prepared for: Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 February 1980 . Approved by: QuaHty Assurance Systems and Engineering Division

,--** ( ( SOUTHWEST RESEARCH INSTITUTE.

Post Office Drawer 28510 6220 Culebra Road San Antonio, Texas 78284 1979 INSERVICE EXAMINATION OF PALISADES NUCLEAR POWER PLANT Prepared by: Proje6t Engineer Reviewed by: P"'ject Manager VOLUME II FIELD DATA SwRI PROJECT 17-3620 CONTENTS:

CLASS 1 VESSELS REACTOR PRESSURE VESSEL REACTOR PRESSURE VESSEL CLOSURE HEAO Prepared for: Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 February 1980 Approved by: Quality Assurance Systems and Engineering Division

( > SOUTH\.VEST RESEARCH INSTITUTE Post Office Drawer 28510 6220 Culebra Road San Antonio, Texas 78284 1979 INSERVICE EXAMINATION OF PALISADES NUCLEAR POWER PLANT VOLUME Ill FIELD DATA (CONT'D) SwRI PROJECT 17-3620 CONTENTS:

Prepared by: Projk Engineer . Reviewed by: Project Manager CLASS 1 VESSELS ICONT°DI PRESSURIZER.

STEAM GENERA TOA A STEAM GENERA TOA B CLASS 1 PIPING PRIMARY COOLANT SYSTEM ENGINEERED SAFEGUARDS SYSTEM CHEMICAL AND VOLUME CONTROL SYSTEM PRIMARY COOLANT PUMPS Prepared for. Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 February 1980 Vice President Quality Assurance Systems

  • and Engineering Division .-

.. ( '-> SOUTHWEST RESEARCH INSTITUTE Post Office Drawer 28510 6220 Cl.llebra Road San Antonio, Texas 78284 1979 INSERVICE EXAMINATION OF PALISADES NUCLEAR POWER PLANT Prepared by:

by. VOLUME IV FIELD DATA (CONT'D) SwRI PROJECT 17-3620 CONTENTS:

CLASS 1 VALVES CLASS 2 VESSEl.S STEAM GENERATOR A STEAM GENERATOR B REGENERATIVE HEAT EXCHANGERS CLASS 2 PIPING MAIN STEAM SYSTEM FEEDWATER SYSTEM Prepared for: Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 February 1980 Approved by: /14 du,Je Project Manager

.. SOUTHWEST RESEARCH INSTITUTE Post Office Drawer 28510 6220 Culebra RQad San Antonio, Texas 78284 1979 INSERVICE EXAMINATION OF PALISADES NUCLEAR POWER PLANT Prepared by: Proj Engineer Reviewed by: Project Manager VOLUMEV FIELD DATA (CONT'D)*

SwRI PROJECT 17-3620 CONTENTS:

CL.ASS 2 PIPING ICONT'OI ENGINEERED SAFEGUARDS SYSTEM *CHEMICAL ANO VOLUME CONTROL SYSTEM RADWASTE SYSTEM SPENT FUEi. POOL SYSTEM CLASS 3 PIPING PRIMARY COOLANT SYSTEM SERVICE WATER SYSTEM Prepared for: Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 February 1980 Approved by:

  • ..... " '* SOUTHWEST RESEARCH INSTITUTE Post Office Drawer 28510 6220 Culebra Road San Antonio, Texas 78284 1979 INSERVICE EXAMINATION OF PALISADES NUCLEAR POWER PLANT Prepared by: Pro;k Engineer
  • Reviewed by: Project Manager VOLUME VI FIELD DATA (CONT'D) SwRI PROJECT 17-3620 CONTENTS:

Cl.ASS 3 PIPING (CONT'DI SERVICE WATER SYSTCM ICONro1 COMPONENT COOLING SYSTCM SPENT FUEL POOL SYSTCM CALIBRATION SHEETS 190000 SERIES Prepared for: Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 February 1980 Approved by: Quality Assurance Systems and Engineering Division

... --** ... , ti. r "

  • SOUTHWEST RESEARCH INSTrrUTE Post Office Drawer 28510 6220 Culebra Road San Antonio, Texas 78284 1979 INSERVICE EXAMINATION OF PALISADES NUCLEAR POWER PLANT Prepared by:

Engineer Reviewed by: Project Manager VOLUME VII FIELD DATA (CONT'D) SwRI PROJECT 17-3620 CONTENTS:

CALIBRATION SHEETS ICONT"Cl 250000 SERIES 360000 SERIES 370000 SERIES 460000 SERIES 570000 SERIES MECHANIZED RECORD FORMS 730000 SERIES . 740000 SERIES 810000 SERIES CUSTOMER NOTIFfCA TION FORMS. Prepared for: Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 February 1980

( . '-.*

Final Report CONSUMERS POWER COMPANY SYSTEM PROTECTION AND LABORATORY SERVICES NONDESTRUCTIVE TESTnm DEPARTMENT 1979 INSERVICE EXAMINATION OF THE PALISADES NUCLEAR PLANT PROJECT 79002-P Review 1/;_1/</r I vNDT Department SuperVisor Approval Revision 1 -Revised 1-18-80

( ' ( \ *

  • n\TA CERTIFICATION System Protection and Laboratory Services (CPCo) SP&LS forwarded to CPCO-OSD one volume of information pertaining to the 1979 Palisades Inservice Inspection.

The volume, approved for publication by E Q Martinez, CPCo Level III, containing the following:

1) Personnel Certifications
2) Equipment and Material Certif'ications
3) Field Data The information contained in the volume supplied by SP&LS was extracted from the volume and placed in the appropriate section of the Palisades Plant Outage/Plan.

The approval sheet is included herein.