Final Inservice Insp Rept Covering 790908-800528.Includes Data Submitted by Southwest Research Institute
ML18045A562
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/18/1980
From: Alexander Adams, Cherba R, Martin S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18045A561 List:
References
NUDOCS 8009030627
Download: ML18045A562 (51)


Text

1980 INSERVICE INSPECTION' No 6 PALISADES lnJCLEAR PLANT

(

Consumers Power Company Approval of Data Submitted by Examination Agencies A. System Protection and Laboratory Services (CPCo)

B. Southvest Research Institute General Office Palisades Plant o'A-/rJ Date

~ Da'.te t ISI Section Heed e!rlro Dat u.:t~ f/;r-/fo Date r

Ap~~

Approval .

Dir, Oper Serv Dept Date

. idil~

Plant 1'1anager l.rA~

Date .

r-o *

SJ009030 b2-7

1979 PALISADES NUCLEAR PLANT

( INSERVICE INSPECTION REPORT Submitted in accordance with ASME Boiler and Pressure Vessel Code,Section XI, Article IWA-6000, 1974 Edition with addenda through Summer, 1975.

1) Date: June 9, 1980
2) Corporate Headquarters: Consumers Power Company 212 W Michigan Avenue Jackson, MI 49201
3) Plant: Palisades Nuclear Power Plant Route 1, Box 178 Covert, MI 49043
4) Unit No: 1
5) Commercial Service Date: December 31, 1971 6). Gross Generating Capacity: 720 Mw electric 2200 Mw thei-mal 7,8,9,10) See attached table and the remainder of the Final Report
11) Completion Date for Inspections: May 27, 1980
12) Code Inspector(s): Christopher Ansorge Michael Walters Steven Rathburn William Vallance
13) Authorized Inspection Agency: The Hartford Steam Boiler*

Inspection and Insurance Company Suite 200 26600 Telegraph Road Southfield, MI 48076

14) Abstract: See* Final Report * *
15) Signature of Inspector: ~~

¥

- **-~ ... ,

Item 7, 8, 9, 10 MAJOR COMPONENTS INSPECTED TABLE 1979 PALISADES INSERVICE INSPECTION Manufacturer State Assigned National Board Component or Appurtenance Manufacturer Serial No No No Reactor Vessel Combustion Eng CE-66uo M96725M NB 20a27 Reactor Vessel Closure Head Combustion Eng CE-66210 M96725M NB 20827 Pressurizer Combustion Eng CE-66601 M96728M NB 20851 Steam Generator A (or 1) Combustion Eng CE-66501 M96126M NB 20849 Steam Generator B (or 2) Combustion Eng CE-66502 M96727M NB 20850 Primary Coolant Pump # lA Byron-Jackson 0764 I \

' *Primary Coolant Pump # lB Byron-Jackson 0765 Primary Coolant Pump #2A Byron-Jackson 0766 Primary Coolant Pump #2B Byron-Jackson 0767

1979 INSERVICE INSPECTION NO 6 PALISADES NUCLEAR PLANT The Inservice Inspection No 6 was conducted during the period S~tember 8, 1979 and May 28, 1980. . Inspections were conducted in accordance with the proposed inservice inspection and testing program submitted to the NRC pursuant to 10CFR50.55a(g), for which approval was granted on October 15, 1979 by the NRC, and in accordance with the Palisades Plant Technical Specifications, Sections 4.3 and 4.12. In the event of a conflict between the approved program and the Plant Technical Specifications, the more restrictive requirements were applied. The ASME Boiler and Pressure Vessel Code,Section XI Edition cited in the approved inspection program and the p'1ant Technical Specifications is as follows:

ITEM EXAMINATION ACCEPTANCE Class 1, 2 and 3 . 74S75 74s75, High Energy Piping 74S75 74S75 The NDT examinations were performed using manual and mechanized ultrasonic (UT), liquid penetrant (PT), magnetic particle (MT), visual (VT), and radiogra:phic (RT) techniques. Indications were recorded following applicable procedures; reportable indications which were judged by the examination agencies to be relevant were documented and transmitted to CPCo :.personnel for evaluation.

CPCo evaluated all reportable indications and dispositioned each by either "accepting as is" or by performing the necessary cosmetic filing, grinding, repair or replacement.

Two main examination agencies were engaged in on-site NDT-ISI activities, Southwest Research Institute (SwRI) and CPCo System Protection and Laboratory Services (SP&LS). They were supplemented in repair activities by Conam Inspection, Trans-Eastern Inspection and UTEC/American X-Ray and Inspection.

Inservice tnspection No 4 was originally scheduled* to begin in August, 1977.

However, approval from the NRC allowed the.Palisades operating license to be amended to permit 18 months to elapse between refueling outages. Therefore, Inservice Inspection No 4 was postponed to January, 1978. Because of this postponenent, only two refueling outages, No 4 & 6 were available during the second i~terval third to conduct an ISI. Inservice Inspection No 4 was the first inspection conducted and Inservice Inspection No 6 was the last inspection conducted in the second interval third of the present ten year interval. Frequency requirements for the second interval third of the present interval third have been met.

.---- .. TABLE OF CONTENTS I

i Volume I Approval Sheet Title Page Table of Contents NRC Report Tables 1&2 Data Certification NIS-1 Form Volume II Inspection Control Mechanisms Specification Plant Procedure Appendix I Examination Table Appendix II Examination Agency Control Volume III Appendix III Examination Procedures

\.

Volume TV Appendix TV Reference Drawings Appendix V New Calibration Standards Appendix VI Personnel Certifications Appendix VII Material Certifications Appendix VIII .

Equipment Certifications Volume V Data Volume VI Data Volume VII Data

2

( '.

Volume VIII Data

, Volume IX Data Volume X I.E. Bulletin Data Volume XI SwRI Calibration Sheets SP&LS Technique Sheets Volume XII Appendix IX Inspection Resulutions DR's CNF's Appendix X I.E. Bul.letin Examination Table

. \,

Volume XIII Pressure Test Data

-. Palisades Final Report

!SI No. 6 Table 1 '*"

Page 1 of 1 TABLE 1 ,..

RESOLUTION OF REPORTABLE INDICATIONS EXAMINATION CONDITION REPORTING COMPONEtl'l' METHOD(S) REPORTED MECHANISM DISPOSITION RE INSPECTION DISPOSITION Closure Nute 14 MT. *ftiurtace Condition CNF 79-11-PAL Accept As-Ia Shallow Knick& DR ID-PAL 79-150 Closure Nute NB MT Surface Condition CNF 79-11-PAL Accept As-Is Shallow Knicks DR ID-PAL 79-150 Closure Nuts 110 MT Surface Condition Shallow Knicks CNF 79-11-PAL DR ID-PAL 79-150 Accept As-Is e Closure Nuts Ill MT Surface Condition CNF 79-11-PAL Accept As-Is Shallow Knicks DR ID-PAL 79-150 Closure Nuts il3 MT Surface Condition CNF 79-11-PAL Accept As-Is Shallow Knicka DR ND-PAL 79-150 Closure Nuts 115 MT Surtace Condition CNF 79:-11-PAL Accept As-Is Shallow Knicks DR ID-PAL 79-150 Closure Nuts 119 MT Surra.Ce Condition. CNF 79-11-PAL Accept As-Ia Shallow Knicks .DR ID-PAL 79-150 Closure Nuts 120 MT Surface Condition CNF 79-11-PAL Accept As-Is Shallow Knick&* DR ID-PAL 79-150 Closure Nuts 121 MT Surface Condition CNF 79-29-PAL Accept As-Is Shallow Knicka DR ND-PAL Bo-Closure Washers (Old) VT Surface Condition CNF 79-10-PAL Accept As-Ia 11,2,27,29-39,41, Shallow Knicks DR ID-PAL 79-151 42,45,46 Closure Washers (Nev) VT Surface Condition CNF 79-10-PAL Accept As-Is 14-20 Shallow Knicka DR ID-PAL 79-151 Outlet Manvay Nuts VT Gouges in Nuts DR IRJK 102679-2 Accept As-Is (S/G A) Primary Hanway Outlet Ma.nvay Nute VT Gouges in Nuts DR IRJK 102679-1 Accept As-Is (S/G B) Primary Nanvay 11 CVC-2-LDL-2Bl-33PR-l VT Missing Nut CNF 79-024-PAL Replace Nut and Acceptable and Bolt DR ID-PAL-79-165 Bolt.Reinspect

l'u.lisades Final Report ISI No. 6 Table 1 Page 2 of 1 TABLE l*

RESOLUTION OF REPORTABLE INDICATIONS EXAl.JINATION CONDITION REPORTIHG COMPONENT METHOD(S) REPORTED MECHANISM DISPOSITION RE INSPECTION DISPOSITION CVC-2-LDL-2U2-20PR VT Loose Nuts CNF 79-0211-PAL Tighten Nuts and Acceptable_

and Bolts DR #D-PAL-79-164 Bolts and Reinspect CVC-2-LDL-2B2-21PR VT Loose Nuts CNF 79-024-PAL Tighten Nuts and Acceptable and Bolts DR #D-PAL-79-164 Bolts and Reinspect PCS-30-RCL-2B-l , UT Slag CNF 79-022-PAL Accept As-Is DR #D-PAL-79-167 VALVES MJ 3041 VT Crystalline CNF 79-023-PAL Clean, Reinspect Acceptable Deposit on DR #D-PAL-79.:168 Pu.eking Gland MO 3045 VT Crystc.lline CNF 79-023-PAL Clean, Reinspect Leakage. Valve Packing Deposit on DR #D-PAL-79-168 Adjusted Packing Oland Acceptable ESS-12-SlS-lLP-207 PS PT Porosity and Slag. CNF 79-008-PAL Reinspect Acceptable DR P.D-PAL-79-159.

ESS-12-SlS-lLP-216 PR VT Missing Nut CUF 79-003-PAL Replace and Acceptable c;.nd Bolt DR /ID-PAL-79-155 Reinspect ESS-12-SlS-lLP-220 _PR VT Luose and .. CNF 79-002-PAL Tightened and Cocked Anchor . Replaced Anchor 1-\issing Nuts DR #D-PA!.-79-154 Rerilaced Nuts, Bol't Bolt by Bechtel Reinspect IE Bulletin 79-02, 79-14 E3S-10-SlS-Ll'A-222 PR V'r Loose N\lt and CHF 79-001-PAL Repair and Acc~ptable Bolt. Missing DR #D-PAL-79-153 Reinspect Nut, FWS-18-F"WL- lSl-2113 RT Slag DR UROP 0928-79-2 Accept As-Is FWS-18-FWL-181-2115 RT Linear DR GROP 1010-79-1 Accept As-Is

nci.ication

.Fl*IS-lU-FWL-lSl-258 PR-1 VT Insuf. Er.gagement

  • DR #HRS 012360-1 F'i/S-18-FWL-lSl-253 PR-2 VT :ns*..:f. Engagement DR tt:rns 012380-1 Accept As-Is FWS-lo-FWL-251-259 u*r Crack-like CNF 79-004-l:'AL Q,A-19 Initi:ited Acceptable Indications DR #D-PA!..-79-158 ER PAL 79-49.

in Held Replace Piping

Palisades Pinal Report ISJ No. 6 Table 1 Page 3 of 7

'l'ABLE 1 RESOLUTION OF REPOR'I'ABLE INDICATIONS EXAMINA'l'ION CONDI'l'ION REPORTING COMPO NEil'!' ME."THOD( S) REPORTED MECHANISM DISPOSITION RE INSPECTION DISPOSITION FWS-18-FWL-2Sl-259 PR-1 VT Insur. Engap;ement DR IRRS 012380-1 Accept As-Is FWS-18-FWL-2Sl-259 PR-2 VT Insuf. Engagement DR NRRS 012380-1 Accept As-le MSS-36-MSL-151-211 RT Slag DR IROP 092879-1 Accept As-Is MSS-36-MSL-2Sl-207 PS PT Crack Indication CNF 79-017-PAL Grind out;Reweld Acceptable on Stanchion DR ID-PAL-79-152 CCS-20-CPU-lPA-PS VT Inadequate '!bread DR IRRS 100179-1 Accept As-le Engagement ccs-16-CPU-lPB-PS VT Travel Setting DR IRJK 100379-1 . Remove and Verify Acceptable Outside Mfrs Proper Range ,

Range* Reinspect CCS-20-CPU-lPC-PS VT Base Plate Bolt DR IRRS 100179-2 Accept As-Is .Acceptable Inadequately Engaged, Excess Weld Build-up CCS-16-CPU-lPC-PS VT Travel Setting DR IJK 100379-2 Remove and Verify Acceptable Outside Mfrs Proper Range, Range Reinspect CCS-24-RHC-lPl-PR-3 VT Bent Clevis, DR URRS 100179-3 Clevis and Cotter Acceptable Sheared Cotter

  • Pine Replaced Pine CCS-18-RHC-lPl-PR-l VT Insufficient En- DR IRRS 100279-1 Replace Anchor Bolte Acceptable gagement, cracked and Jam Nuts, Reinspect Cement, Missing Nute and Bolte CCS-10-ARll-lPl-PR-l VT Loose Mounting DR IRRS 100179-4 Tighten Bolts, Crooked Anchor Anchor Bolte Plate Bolts Reinspect Bolte, Reinspect Replaced Accept CCS-10-ARH-lPl-PR-3 VT Missing and DR NRRS 100179-5 Replace Restraint Acceptable Bent Bolts and Bolts, Reispect CCS-10-CSH-lPl-PS-2 VT 7 Rounded CNF-79-019-PAL Accept As-Is Indications DR ID-PAL-79-166 CCS-10-CSll-lPl"'."PR-6 VT I.Oose Nuts on CNF 79-014-PAL Tighten Nuts Acceptable Restraint DR ND-PAL-79-146 and Reinspect

Palisades Final Report IS! No. 6 '

Table 1 Page 4 of 7 TABLE 1 RESOLUTION OF REPORTABLE INDICATIONS EXAMINA'l'ION CONDITION REPORTING COMPONEN'I' Ml:.'THOD{ S) REPORTED MECHANISM DISPOSITION RE INSPECTION ,,.. DISPOSITION CCS-10-CSll*lP4-PS-l VT Slag CNF 79-015-'PAL Accept As-Is DR ND-PAL-79-144 CCS-10-CSH-1P4-PS-2 VT Slag CNF-79-016-PAL Accept As-Is DR ND-PAL-79-145 SFP-14-FPF-RLl-PR-l VT Misalignment DR IRRS 100379-1 Analyzed by Bechtel per IE Bulletin 79-02, 79-14 Installed Modified Unit Acceptable e

SFP-6-CPL-SLl-PR-4 VT Nonsupporting, DR NRRS 100479-4 Analyzed by Bechtel Acceptable Misalignment per IE Bulletin 79-02, 79-14 SFP-6-CPL-SLl-PR-5 VT Nonsupporting, DR IRRS 100479-5 Analyzed by Bechtel Removed Hanger, Misalignment per IE Bulletin Adequate Support 79-02, 79-14 Without It SWS-24-CCS-RLH-PR-l VT Loose Nuts and DR NRRS 100279-2 Tighten Nuts and Accepttlble Bolts, Missing Bolts, Replace Cotter Cotte.r Pin Pin, Reinspect SWS-24-CSW-SHl-PS VT Corrosion DR IJK 100279-1 Remove Corrosion, Acceptable Repaint, Reinspect SWS-16-SWP-OLA-PS VT Corrosion DR IJK 100479-1 Remove Corrosion, Acceptable Repaint, Reinspect SWS-16-SWP-OLB-PS VT Corrosion DR IJJK 100479-2 Remove Corrosion, Acceptable Repaint, Reinspect SWS-16-SWP-OLC-PS VT Corrosion DR NJK 100479-3 Remove Corrosion, Acceptable Repaint, Reinspect SWS-10-CRS-RL3-PS-4 VT Incomplete Weld CNF-79-025-PAL Analyzed by Bechtel Accept As-ls DR ID-PAL-79-170 IE 79-02, 79-14 SWS-10-CRS-SL3-PR-4 VT Loose Turnbuckle CNF-79-013-PAL Readjust Support, Acceptable DR /JD-PAL-79-149 Reinspect SWS-10-CRS-SL4-PS-l VT Cracked Welds, CNF-79-020-PAL Analyzed in Conjunction Acceptable Missing Welds DR ID-PAL-79-147 with E-PAL-80-007. Re-placed vith Ronvelded Support Plate

  • ~.. Palisades Final Report ISi No. 6 }

Table 1 Page 5 of 7 TABLE 1 RESOLU'rION OF' REPOR'l'ABLE INDICA'l'IONS EXAMINATION CONDITION REPORTING COMPONEN'l' ME'l'HOD(S) REPORTED MECHANISM DISPOSI'l'ION RE INSPECTION DISPOSITION SWS-10-CRS-Sr.4-PS-2 VT Cracked Welds CNF-79-018-PAL Replaced'Support Acceptable Missing Welde DR #D-PAL-79-148 Without Welded Connections. Reinspect SWS-6-CRS-lRl-PS VT Incomplete Weld CNF-79-025-PAL Analyzed by Bechtel Accept As-le DR #D-PAL-79-170 per IE Bulletin SWS-6-CRS-152-PS VT Missing Nut on CNF-79-028-PAL 79-02. 79-14 Tighten Nute

  • Corrosion Remove Cor-e Floor Plate DR #D-PAL-79-169 Reinspect roeion
  • repaint
  • Reinspec_t.

Acceptable sws~6-CRS-351-PS-2 VT Slag CNF-79-017-PAL Accept As-le DR ID-PAL-79-171 SWS-6-EPS-RLA-PR-5 VT Nonsupporting DR #RJK 092779-2 Tighten Locknut Acceptable Restraint and Ensure Support*

Reinspect SWS-6-EPS-RLA-PR-6 VT Miealigrunent, DR #RJK 092779-1 Readjust 'l\lrnbuckle Acceptable Insufficient and Tighten Lockouts*

'lb read Reinspect Engagement SWS-6-EPS-RLA-PR-9 VT Insufficient DR #RJK 100179-2 Tighten Nut. Acceptable Engagement Reinspect SWS-6-EPS-RLA-PR-10 VT Loose Locknut DR NRJK 100179-1 Tighten IDcknut. Acceptable Reinspect SWS-6-EPS-SLA-PR-l VT Corrosion DR NRRS 100479-1 Remove Corrosion. Acceptable Repaint. Reinspect SWS-6-EPS-SLA-PR-2 VT Corrosion DR NRRS 100479-2 Remove Corrosion. Acceptable Repaint. Reinspect SWS-6-EPS-SLA-PR-3 VT Corrosion DR #RRS 100479-3 Remove Corrosion. Acceptable Repaint. Reinspect SWS-6-EPS-SLA-PR-4 VT Corrosion OR #RJK 100179-3 Remove Corrosion. Acceptable Repaint. Reinspect

Palisades Final Report IS! No. 6 Table l Page 6 of 1 TABLE l RESOLUTION OF REPORTABLE INDICATIONS EXAMINATION CONDITION REPORTING COMPONEN'r METHOD~S) REPORTED MECHANISM DISPOSITION RE INSPECTION DISPOSITION SWS-6-EPS-SLA-PR-6 VT Loose Locknut DR IRJK 092779-4 Tighten Locknuts , Acceptable Reinspect SWS-6-EPS-SLA-PR-7 VT Loose Locknut D,R IRJK 092179-3 Remove Corrosion, Acceptable Corrosion Repaint, Tighten Locknut, Reinspect SWS-6-EPS-5LB-PR-l VT. Nut Inadequately DR IRJK 09279-5 Replace Anchor Bolt Acceptable

'!breaded Verity Acceptability SWS-6-EPS-5LB-PR-5 VT Nut Inadequately DR IRJK 100279-4 Tighten Bolt arid Acceptable

'!breaded Nut, Reinspect SWS-6-EPS-SLB-PR-6 VT Nut Inadequately DR IRJK 100279-l Remove Corrosion, Acceptable

'!breaded Repaint, Tighten Corrosion Locknut, Reinspect SWS-6-EPS-SLB-PR-8 VT Corrosion DR IRJK 100279-2 Remove Corrosion, Acceptable Repaint, Reinspect SWS-6-EPS-SLB-PR-9 VT Nonsupporting DR IRJK 100279-3 Add Locknuts and Acceptable Restraint, no Readjust to Support Locknut& Pipe, Reinspect FWS-18-FWL-151-251 PR VT Missing Nut CNF".'79-006-PAL Accept As-Is DR ID-PAL-19-156 FWS-18-FWL-151-257 FWS-18-FWL-lSl-258 RT RT Linear and Crack-Like Indications Linear and Crack-DR IROP 092779-2 DR #ROP 092779-1 QA-19 Initiated ER PAL 79-49 Replace piping QA-19 Initiated Acceptable e

Like Indications ER PAL 79-49 Replace Piping Acceptable FWS-18-FWL-151-259 RT Linear and Crack- DR IROP 092779-l QA-19 Initiated Like Indications ER PAL 79-49 Replace Piping Acceptable FW6-18-FWL-l6l-260 RT Linear and Crack- DR IROP 092779-1 QA-19 Initiated Like Indications ER PAL 7~-49 Replace iping Acceptable FWS-18-FWL-151-261 RT Linear and Crack- DR #ROP 092779-1 *QA-19 Initiated Like Indications ER PAL 7i-4~

Replace ip ng Acceptable FWS-18-FWL-161-261 UT Linear and Crack- CNF-79-007-PAL QA-19 Initiated*

Like Indications* DR ID-PAL-79-157 ER PAL 79-49 Replace Piping Acceptable

,,,.----. Palisades Final Report

!SI No. 6 Table 1 Page 7 of 7 TAULE 1 RESOLU'rION OF REPORTABLE INDICA'l'IONS EXAMINATION CONDITION REPORTING COMPONEN'J' ME.'rHOD( S) REPORTED MECHANISM DISPOSITION REINSPECT ION DISPOSITION FWS-18-*--WL-lSl-262 RT Linear and Crack- DR #ROP 092779-1 QA-19 Initiated Like Indications ER PAL 79-49 Replace Piping Acceptable FWS-18-FWL-2Sl-259 RT Linear and Crack- DR NROP 092779-2 QA-19 'initiated Like Indications ER PAL 79-49 Replace Piping Acceptable FWS-18-FWL-2Sl-260 FWS-18-F'Wi,..;2Sl-261 RT RT Linear and Crack~

Like Indications Linear and Crack-DR IROP 092779-2 DR IROP 092779-2 QA-19 .Initiated ER PAL 79-49 Replace Piping QA-19 Initiated Acceptable e

Like Indications ER PAL 79-49 Replace Piping Acceptable FW8-18-*'WL-281-262 RT Linear and Crack- DR IROP 092779-2 QA-19 Initiated Like Indications ER PAL 79-49 Replace Piping Acceptable FW8-18-FWL-281-262 UT Linear and Crack- CNF-79-005-PAL QA-19 Initiated Like Indications DR #D-PAL-79:-158 ER PAL 79-49 Replace Piping Acceptable FW8-18-FWi.-2Sl-263 RT Linear and Crack- DR IROP 092779-2 QA-19 Initiated Like Indications . ER PAL 79-49 Replace Piping Acceptable

v

,, ..... --~. Palisades Final Report ISI No. 6

'!'able 2 Page 1 of 26

'!'ABLE 2 PALISADES INSERVICE INSPEC'l'ION NO. 6 Swnmary of Areas Examined and Results ASME SEC. IX ASME SEC. IX EXAM COMPONENT I'J'EM NO. CAT. NO. ME'rHOD(S) IDENTIFICATION EXAMINATION RESULTS lll.9 B-G-1 U'l' Flange Ligaments Acceptable Ul.15 B-N-1 RV'r Vessel Interior Acceptable lil. 3 B-C UT 6-118A Head-to-Flange Acceptable Bl.8 B-G-1 MT Closure Studs N3 Acceptable lll.8 B-G-1 MT Closure Studs N4 Acceptable 1n.8 B-G-1 MT Closure Studs N5 Acceptable Bl.8 B-G-1 MT Closure Studs N6 Acceptable Bl.8 B-G-:-1 MT Closure Studs N7 Acceptable IH.8 B-G-1 MT Closure Studs NB Acceptable Bl.8 13-G-l MT Closure Studs N9 Acceptable Bl.8 B-G-1 M'r Closure Studs NlO Acceptable lll.8 B-G-1 M'l' Closure Studs Nll Acceptable lll.8 B-G-1 MT Closure Studs Nl2 Acceptable lll.8 B-G-1 MT Closure Studs Nl3 Acceptable Bl.8 B-G-1 ~'l' Closure Studs N14 Acceptable Bl.8 B-G-1 M'l' Closure Studs Nl5 Acceptable lll.8 B-G-1 MT Closure Studs Nl6 Acceptable Bl.8 B-G-1 MT Closure Studs Nl7. Acceptable Bl.8 B-G-1 MT Closure Studs Nl8 Acceptable Bl.8 B-G-1 M'r Closure Studs Nl9 Acceptable

Palisades Final Report IS! No. 6 Table 2 Page 2 of 26 TABLE 2 PALISADES INSERVICE INSPECTION NO. 6 SU11UDary of Areas Examined and Results ASME SEC. IX ASHE SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S) IDENTIFICATION EXAMINATION RESULTS Bl.8 B-G-1 MT Closure Studs 620 Acceptable Bl.8 B-G-1 UT Closure Studs 63 Acceptable Bl.8 B-G-1 UT Closure Studs #4 Acceptable Bl.8 B-G-1 UT Clo.sure studs 65 Acceptable IU.8 B-G-1 UT Closure Studs H6 Acceptable Bl.8 B-G:..l UT Closure Studs H7 Acceptable Bl.8 B-G-1 UT Closure Studs 118 Acceptable Bl.8 B-G-1 UT Closure Studs 69 Acceptable Bl.8 B-G-1 UT Closure Studs #10 Acceptable Bl.8 B-G-1 UT Closure Studs #11 Acceptable Bl.8 B-G-1 UT Closure Studs 612 Acceptable Bl.8 B-G-1 UT Closure Studs 613 Acceptable Bl.8 B-G-1 UT Closure Studs 614 Acceptable Bl.8 B-G-1 UT Closure studs 615 Acceptable Bl.8 B-G-1 UT .Closure Studs 616 Acceptable Bl.8 B-G-1 UT Closure Studs 617 Acceptable Bl.8 B-G-1 UT Closure Studs #18 Acceptable Bl.8 B-G-1 UT Closure Studs 619 Acceptable Bl.8 B-G-1 UT Closure Studs 620 Acceptable Bl.8 B-G-1 wr Closure Nuts 63 Acceptable

... *--.. Palisades Final Report IS! No. 6 Table 2 ,

Page 3 of 26 TABLE 2 PALISADES INSERVICE INSPECTION NO. 6 Swnmary of Areas Examined and Res.ul ts ASME SEC. IX ASME SEC. IX EXAM COMPONENT ITEM NO. CA'l'. NO. METHOD(S) IDENTIFICATION EXAMINATION RESULTS Bl.8 B-G-1 MT Closure Nuts /14 See Table 1 Bl.8 B-G-1 MT Closure Nuts 115 Acceptable Bl.8 B-G-1 MT Closure Nuts 116 Acceptable Bl.8 B-G-1 MT Closure Nuts /J7 Acceptable Bl.8 B-G-1 MT Closure Nuts 118 See Table 1 Bl.8 J3-;G-l MT Closure Nuts 119 Acceptable Bl.8 B-G-1 MT Closure Nuts /JlO See Table 1 Bl.8 B-G-1 MT Closure Nuts /ill See Table 1 Bl.8 B-G-1 MT Closure Nuts /112 Acceptable Bl.8 B-G-1 MT Closure Nuts /113 See Table 1 Bl.8 B-G-1 MT Closure Nuts /Jl4 Acceptable Bl.8 B-G-1 MT Closure Nuts /Jl5 See Table 1 Bl.8 B-G-1 MT Closure Nuts /Jl6 Acceptable Bl.8 B-G-1 MT Closure Nuts /121 See Table 1 Bl.8 B-G-1 MT Closure Nuts IJ18 Acceptable Bl.8 B-G-1 MT Closure Nuts /119 See Table 1 Bl.8 B-G-1 MT Closure Nuts /120 See Table 1 Bl.8 B-G-1 UT Closure Nuts /13 Acceptable Bl.8 B-G-1 UT Closure Nuts /14 Acceptable 111.8 B-G-1 U'r Closure Nuts 115 Acceptable Bl.8 .B-G-1 UT Closure Nuts N6 Acceptable j,


Palisades Final Report *' -

ISI No.

Table 2 Page 4 of 26 TABLE 2 PALISADES INSERVICE INSPECTION NO. 6 Summary of Areas Examined and Results ASME SEC. IX ASME SEC. ~X EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S) IDENTIFICATION EXAMINATION RESULTS Bl.8 B-G-1 UT Closure Nuts 117 Acceptable Bl.8 B-G-1 UT Closure Nuts NB Acceptable Bl.8 B-G-1 UT Closure Nuts 119 Acceptabie JU.8 B-G-1 UT Closure Nuts 1110 Acceptable Bl.8

  • B-G-1 UT Closure Nuts #11 Acceptable Bl.8 B-G-1 UT Closure Nuts 1112 Acceptable Bl.8 B-G-1 UT Closure Nuts 1113 Acceptable lll.8 B-G-1 UT Closure Nuts 1114 Acceptable Bl.8 B-G-1 UT Closure Nuts 1115 Acceptable Bl.8 B-G-1 UT Closure Nuts 1116 Acceptable Bl.8 B-G-1 UT Closure Nuts 1117 Acceptable Bl.8 B-G-1 UT Closure Nuts 1118 Acceptable Bl.8 B-G-1 UT Closure Nuts 1119 & 1120 Acceptable Bl.XO B-G-1 VT Closure Washers (Old) See Table 1 Bl.10 B-G-1 VT Closure Washers (Nev) 114-1120 See Table 1 Bl.10 B-G-1 VT Closure Washers (New) S-1 Acceptable Bl.11 B-G-2 VT Instrument Flange Bolting 1146 Acceptable Bl.11 B-G-2 VT Instrument Flange Bolting 1147 Acceptable Bl.11 B-G-2 VT Instrument F~ange Bolting 1148 Acceptable Bl.11 B-G-2 VT Instrument Flange Bolting 1149 Acceptable Bl.11 B-G-2 VT Instrument FLange Bolting 1150 Acceptable

.-----**~-

Palisades Final Report -*

!SI No.

Table 2 Page 5 of26 ..

TABLE 2 PALISADES INSERVICE INSPECTION NO. 6 Summary of Areas Examined and Results ASME SEC. IX ASME SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S) IDENTIFICATION EXAMINATION RESULTS Bl.11 B..,G-2 VT Instrument Flange Bolting #51 Acceptable lll.11 B-G-2 VT Instrument Flange Bolting 1152 Acceptable Bl.11 B-G-2 VT Instrument Flange Bolting 1153 Acceptable e*

B2.l B-B UT .2-982-C (Pressurizer) Acceptable B2.2 B-D UT 3-985 (Pressurizer) Acceptable B2.4 B-F PT PCS-6-PRS-lBl-l Acceptable B2.4 B-F UT PCS-6-PRS-lBl-l Acceptable ll2.8 B-H UT 4-984/5-984 ( Pressuri z*er) Acc'eptable B3.l B-B UT 1-4-941 .* Acceptable B3.l B-B Mech UT 1-11-943 (S/G A) Acceptable

  • B3.l B-ll Mech UT 1-2-941 ( S/G A) Acceptable B3.l B-B Mech UT 1-3-953 (S/G A) Acceptable B3.l Acceptable e

B-B UT l-l-943E (S/G A)

B3.l B-B UT l-l-953E (S/G A) Acceptable B3.l . B-B UT l-l-953F (S/G A) Acceptable B3.2 B-D UT l..;9-954B (S/G A) Acceptable B3.2 B-D UT l-9-954B-IRS (S/G A) Acceptable B3 .. 10 B-G-2 VT Outlet Manway Stu~s (S/G A) Acceptable B3.10 B-G-2 VT Outlet Manway Nuts (S/G A) See Table 1 B3.10 B-G-2 VT Outlet Manway Nuts (S/G B) Ill See Table 1 B3.10 B-G-2 VT Inlet Manway Nuts (S/G A) 112 Acceptable

Palisades Final Report

!SI No. 6

  • rable 2 Page 6 of. 26 TABLE 2 PALISADES INSERVICE INSPECTION NO. 6 SUmma.ry of Areas Examined and Results ASME SEC. IX ASME SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S) IDENTIFICATION EXAMINATION RESULTS B3.l B-B Mech U'r 2-11-943 (S/G B) Acceptable B3.l B-B Mech UT 2-2-941 (S/G B) Acceptable B3.l B-B Mech UT 2-3-953 (S/G B) Acceptable B3.l B-B UT 2-l-953C (S/G B) Acceptable B3.l B-B UT 2-l-953D (S/G B) Acceptable B3.l B-B UT 2-l-953E (S/G B) Acceptable B3.2 B-D UT 2-9-954A (S/G B) Acceptable B3.2 B-D UT 2-9-954A-IRS (S/G B) Acceptable B3.10 B-G-2 VT Inlet Manvay Studs (S/G B.) Acceptable

[13.10 B-G-2 VT Inlet Manvay Nuts (S/G B) Acceptable B3.7 B-B UT 2-SK-953 (S/G B) Acceptable B3.l B-B UT 03 (E-56A) Acceptable B3.l B-B U'l' 04 (E-56A) Acceptable B3.2 B-D UT 01 (E-56A) Acceptable B3.l B-B UT 03 (E-56B) Acceptable B3.l B-B UT 04 (E-56B) Acceptable B3.2 B-D UT 01 (E-56B) Acceptable ll4 .1 B-F P'r PCS-30-RCL-lA-9 Acceptable A4.l B-F UT PCS-30-RCL-lA-9 Acceptable Bl1.l B-F P'l' PCS-30-RCL-2B-7 Acceptable

v Palisades Final Report ISI No.6 Table 2 Page 7 of 26 TABLE 2 PALISADES INSERVICE INSPECTION N0.6 Summary of Areas Examined and Results ASME SEC. IX ASHE SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S) IDENTIFICATION EXAMINATION RESULTS B4.l B-F UT PCS-30-RCL-2B-7 Acceptable B4.5 B4.12 B-J B-G-2 UT VT PCS-2.5-PRS-1P2-l PCS-2.5-PRS-1P2-8BT Acceptable Acceptable e B4.8 B-J PI' CVC-2-CHL-1A2-4 Acceptable B4 .. 10 B-K-2 VT CVC-2-LDL-2Bl-20PR Acceptable' B4.10 B-K-2 VT CVC-2-LDL-2Bl-25PR Acceptable B4.10 B-K-2 VT CVC-2-LDL-2Bl-31PR Acceptable B4.10 B-K-2

  • VT CVC-2-LDL-2Bl-33PR-l See Table 1 B4.10 B-K,-2 VT CVC-l-LDL-2Bl-33PR-2 Acceptable B4.10 B-K-2 VT CVC-2-LDL-2B2-8PR Acceptable B4.10 B-K-2 VT CVC-2-LDL-2B2-13PR Acceptable B4.10 B-K-2 VT CVC-2-LDL-2B2-18PR Acceptable B4.10' B-K-2 VT CVC-2-LDL-2B2 19PR Acceptable B4.10 B-K-2 VT CVC-2-LDL-2B2 19PL-l Acceptable B4.10 B-K-2 VT CVC-2-LDL-2B2 19PL-2 Acceptable B4.10 B-K-2 VT CVC-2-LDL-2B2-20-PR See Table 1 B4.10 B-K-2 VT CVC-2-LDL-2B2-21PR See Table 1 84.10 B-K-2 VT CVC-2-LDL-2B2-27PR-l Acceptable 84.10 B-K-2 VT CVC-2-LDL-2B2-27PR-2 Acceptable Bli.10 B-K-2 v*r CVC-2-LDL-2B2-34PR Acceptable 84.8 B-J Pl' CVC-2-PSS-lPl-6 Acceptable Bli.10 B-K-2 VT CVC-2-PSS-1Pl-32PR-C Acceptable I.

--- Palisades Final Report .-'-...:...

!SI No. 6

Table 2 Page 8 of 26

'rABLE 2 PALISADES INSERVICE INSPECTION N0.6 Swrunary of Areas Examined and Results ASME SEC. IX ASME- SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S) IDENTIFICATION EXAMINATION RESULTS B5.9 B-G-2 VT 1A-2BT-B-l-16 Acceptable

  • B5.9 B-G-2 VT 1A-2BT-W-l-16 Acceptable B5.4 B-K-1 UT lA-S-A Defer to Outage N7 B5.4 B-K-1 UT lA-S-B Defer to Outage #7 UT PCS-72-RCL-lA Acceptable B5.9 B-G-2 VT 1B-2BT-B-l-16 Acceptable B5.9 B-G-2 VT 1B-2BT-W-l-16 Acceptable B5.5 B-K-2 VT lB-SS Acceptable UT PCS-72-RCL-lB Acceptable B5.9 B-G-2 VT 2A-2BT-B-l-16 Acceptable B5.9 B-G-2 VT 2A-2BT-W-l-16 Acceptable B5.5 B-K-2 VT 2A-SS Acceptable UT PCS-72-RCL-2A Acceptable B5.9 B-G-2. VT 2B-2BT-B-l-16 Acceptable B5.9 B-G-2 VT 2B-2BT,-W-l-16 Acceptable UT PCS-72-RCL-2B Acceptable Cl.l C-A UT 1-4-951 ( S/G A) Acceptable Cl. 4 C-D VT l-959-09BT Acceptable Cl.4 C-D PT l-959-09BT Acceptable C2.5 C-E-1 Pr MSS-36-MSL-1Sl-207PS Acceptable C2.l C-G R'r MSS- 36-MSL-lSl-210 Acceptable C2.l C-G R'r MSS-36-MSL-lSl-211. See Table 1 C2.l C-G -Li'!' MSS-36-MSL-181-211 Acceptable C2.6 C-E-2 V'l' MSS-36-MSL-211A-PR-C*

Palisades Final Report ISI No. 6 Table 2 Page 9 of 26 TABLE 2 PALISADES INSERVICE INSPEC'l'ION NO. 6 Swnmary of Areas Examined and Results ASME SEC. IX ASME SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S) IDENTIFICATION EXAMINATION RESULTS C2.l C-G RT MSS- 36-MSL-lSl-216 Acceptable C2.l C-G RT MSS~36-MSL-1Sl-217 Acceptable C2.5 C-E-1 PT MSS-36-MSL-2Sl-207PS See Table 1 C2.l C-G RT MSS-36-MSL-2Sl-212 Acceptable C2.l C-G RT MSS-36-MSL-2Sl-213 Acceptable c2.6 C-E-2 VT MSS-36-MSL-2Sl-213A-PR-A Acceptable C2.l C-G RT MSS-36-MSL-281-218 Acceptable C2.l C-G RT MSS-36-MSL-281-219 Acceptable C2.l C-G RT FWS-18-FWL-lSl-242 Acceptable C2.l C-G RT FWS-18-FWL-lSl-243 See Table 1 C2.l C-G UT FWS-18-FWL-lSl-243 Acceptable C2.l C-G RT FWS-18-FWL-181-244 Acceptable C2.l C-G RT FWS-18-FWL-lSl-245 See Table 1 C2.l C2.5 C-G C-E-1 RT MT FWS-18-FWL-1Sl-256A FWS-18-FWL-1Sl-256PL-l Acceptable Acceptable e C2.l C-G RT FWS-18-FWL-281-241 Acceptable C2.l C-G R'l' FWS-18-FWL-281-242 Acceptable C2.l C-G RT FWS-18-FWL-281-244 Acceptable C2.l C-G RT FWS-18-FWL-281-245 Acceptable C2.l C-G RT FWS-18-FWL-281-251 Acceptable C2.l C-G RT FWS~l8-FWL-2Sl-256 Acceptable C2.6 C-E-2 VT FWS-18-FWL-281-257-PR Acceptable C2.5 C-E-1 MT FWS-18-FWL-281-257-PLl Acceptable C2.l C-G RT fWS-18-FWL-281-258 Acceptable C2.l C-G U'l' FWS-18-FWL-281-259 See Table 1 I:

Palisades Final Report

/  !SI No. 6 Table 2 Page 10 of 26 TABLE 2 PALISADES INSERVICE INSPECTION NO. 6 Summary of Areas Examined and Results ASME SEC. IX ASME SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S) IDENTIFICATION EXAMINATION RESULTS VT FWS-6-AWS-OLA PR Acceptable VT FWS-6-AWS-OLB PR-1 Acceptable *9 VT FWS-6-AWS-OLB PR-2 Acceptable vT FWS-6-AWS-SLB PR-1 Acceptable VT FWS-6-AWS-SLB PR-2 Acceptable C2.l C-G UT ESS-14-SFP-TEM-201 Acceptable C2.l C-F UT ESS-8-SlS-LPA-217 Acceptable C2.6 C-E-2 1/T ESS-10-SlS-LPA-222PR See Table 1 C2.l C-F UT ESS-lO-SlS-LPB-220 Acceptable C2.5 C-E-1 PT ESS-10-SlS-LPB-219PL-l Acceptable c2.5 C.,-E-1 PT ESS-10-SlS-LPB-219PL-2 Acceptable C2.l C-F UT ESS-12-SlS-lA6-201 Defer to Outage #7 C2.2 C-F UT ESS-14-SCS-2Hl-203LI Acceptable C2.2 C-F UT ESS-14-SCS-2Hl-203LO Acceptable C2.5 C-E-1 PT ESS-14-SCS-2Hl-204PS Acceptable C2.6 C-E-2 v*r ESS-14-SCS-2Hl-204PSS Acceptable C2 .. l C-F U'l' ESS-10-SDC-XC0-205 Acceptable C2.5 C-E-1 PT ESS-10-SDC-XC0-205PS Acceptable C2.5 C-E-1 PT ESS-12-SlS-1LP-207PS See Table 1 C2.6 C-E-2 VT ESS-12-SlS-lLP-207PR Acceptable C2.l c..;p UT ESS-12-SlS-lLP-210 Acceptable C2.6 C-E-2 VT ESS-12-SlS-lLP-216PR See Table 1 L

Palisades Final Report

!SI No. 6 Table 2 Page 11 of 26 TABLE 2 PALISADES INSERVICE INSPECTION NO. 6 Swnmary of Areas Examined and Results ASME SEC. IX ASME SEC. IX EXAM COMPONENT ITE>t NO. CAT. NO. METHOD(S) IDENTIFICATION EXAMINATION RESULTS C2.6 C-E-2 VT ESS-12-SlS-lLP-220PR See Table l C2.l C-F UT ESS-12~SlS-lLP-221 Acceptable C2.l C-F UT ESS-12-SlS-lLP-225 Acceptable C2.l C-F UT ESS-12-SlS-lLP-229 Acceptable B4.9 B-K-1 PT ESS-12-SlS-2Bl-9PL-l-4 Acceptable C2.l C-F UT ESS-lO-SDC-XlA-201 Acceptable C2.l C-F UT ESS-10-SDC-XOA-208 Acceptable C2.l C-F UT ESS-10-SDC.-XOB-205 Acceptable C2.l C-G UT ESS-6-SlS-lHP-201 Acceptable C2.l C-G UT ESS-6-SlS-lHP-203 Acceptable C2.6 C-E-2 VT ESS-6-SlS-2HP-216PR Acceptable v*r PCS-10-PRH-lPl PR-1 Acceptable VT PCS-10-PRH-lPl PR-2 Acceptable VT PCS-10-PRH-1P2 PR-1 Acceptable VT PCS-10-PRH-1P2 PR-2 Acceptable VT PCS-6-PRS-lAl PR-1 _Acceptable VT PCS-6-PRS-lAl PR-2 Acceptable VT PCS-6-PRS-lAl PR-3 Acceptable VT PCS-6-PRS-lAl PR-4 Acceptable VT PCS-6-PRS-lAl PR-5 Acceptable VT PCS-6-PRS-lAl PR-6 Acceptable VT PCS-6-PRS-lBl PR-1 Acceptable VT PCS-6-PRS-lBl .PR-2 Acceptable I:

Palisades Final Report

!SI No. 6 Table 2 Page 12 of '-26 TABLE 2 PALISADES INSERVICE INSPECTION N0.6 Sununary of Areas Examined and Results ASME SEC. IX ASME SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. _ METHOD(S) IDENTIFICATION EXAMINATION RESULTS VT PCS-6-PRS-lBl PR-3 Acceptable VT PCS-6-PRS-lCl PR-I Acceptable VT PCS-6-PRS-ICI PR-2 Acceptable VT PCS-6-PRS-ICI PR-3 Acceptable VT PCS-6-PRS-lCl PR-4 Acceptable VT SWS-24-CCS-RLH PR-1 See Table I VT SWS-24-CCS-RLH PR-2 Acceptable VT SWS-24-CSW-HCL PS Acceptable VT SWS-24-CSW-SHI PS See Table I VT SWS-24-CSW-SH2 PR-1 Acceptable VT SWS-24-CSW-SH2 PR-2 Acceptable VT SWS-24-CSW-SH2 PS Acceptable VT SWS-16-CRS-SHI _PS *Acceptable VT SWS-.12-CRS-SHI PR Acceptable VT SWS-12-CRS-SH2 PS-I Acceptable VT SWS-12-CRS-SH2 PSS-I Acceptable VT SWS-16-SWP-OLA PS See Table l VT SWS-16-SWP-OLB PS See Table l VT SWS-16-SWP-OLC PS See Table l VT SWS-12-CRS-RH2 PR Acceptable VT SWS-10-CRS-SLl PS Acceptable VT SWS-10-CRS-SLI PR-I Acceptable VT SWS-10-CRS-SLl PR-2 Acceptable VT SWS-10-CRS-SL3 PS-I Acceptable l'

v Palisades Final Report

!SI No. 6 Table 2 Page 13 of 26 TABLE 2 PALISADES INSERVICE INSPECTION NO. 6 Summary of Areas Examined and Results ASME SEC. IX ASME SEC.. IX . EXAM COMPONENT IT.E.M NO. CAT. NO. METHOD($) IDENTIFICATION EXAMINATION RESULTS VT SWS-l0-CRS-SL3 PSS-1 Acceptable VT SWS-10-CRS-SL3 PS-2 Acceptable VT SWS-10-CRS-SL3 PS-3 Acceptable VT SWS-10-CRS-SL3 PSS-3 Acceptable VT SWS-10-CRS-SL3 PS-4 Acceptable VT SWS-10-CRS-SL3 PSS-4 Acceptable VT SWS-10-CRS-SL3 PR-4 See Table l VT SWS-10-CRS-SL3 PS-5 Acceptable VT SWS-10-CRW-SL3 PSS-5 Acceptable VT SWS-10-CRS-SL4 PS-1 See Table l VT SWS-10-CRS-SL4 PSS-1 Acceptable VT SWS-10-CRS-SL4 PS-2 See Table l VT SWS-10-CRS-SL4 PR-3 Acceptable VT SWS-10-CRS-SL4 PR-4 Acceptable VT SWS-10-CRS-SL4 PS Acceptable VT SWS-10-CRS-SL4 PSS Acceptable VT SWS-10-CRS-SL4 PSS-2 Acceptable VT SWS-10-CRs-sµi PS-3 Acceptable VT SWS-10-CRS-SL4 PL-1 Acceptable VT SWS-10-CRS-SL4 PL-2 Acceptable VT SWS-10-CRS-SL4 PSS-3 Acceptable

.---~ Pulisudes Final Report ISI No. 6

'l'able 2 Puge 14 of 26

'l'ABLE 2 PALISADl<:S INSEHVICE INSPECTION NO. 6 Summary of Areas Examined and Results ASME SEC. IX ASME SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S) IDENTIFICATION EXAMINATION RESULTS VT SWS-10-CRS-RLl PS-1 Acceptable V'r SWS-10-CRS-RLl PS-2 Acceptable VT SWS-10-CRS-RL3 PS-1 Acceptable VT SWS-10-CRS-RL3 PR-1 Acceptable VT SWS-10-CRS-RL) PS-2 Acceptable VT SWS-10-CRS-RL3 PS-3 Acceptable V'r SWS-10-CRS-RL3 PS-4 See Table 1 VT SWS-10-CRS-RL3 PS-5 Acceptable VT SWS-10-CRS-RL4 PR-1 Acceptable VT SWS-10-CRS-RL4 PS-1 Acceptable VT SWS-10-CRS-RL4 PR-2 Acceptable V'r SWS-10-CRS-RL4 PS-2 Acceptable VT SWS-10-CRS-RL4 PS-3 Acceptable VT SWS-10-CRS-RL4 PS-4 Acceptable VT SWS-10-CRS-RL4 PS-5 Acceptable VT SWS-10-CRS-RL4 PL-1 Acceptable VT sws-10.:.cRS-RL4 PL-2 Acceptable VT sWS-6-CRS-lSl PS Acceptable VT. SWS-6-CRS-lSl PSS Acceptable VT SWS-6-CRS-1S2 PS See Table 1 VT SWS-6-CRS-2Sl PS Acceptable VT SWS-6-CRS-2S2 PS-1 Acceptable V'l'  ::;ws-6-CRS-2S2 PS-2 Acceptable VT SWS-6-CRS-2S2 PS-3 Acceptable

Palisades Final Report IS! No. 6

  • rable 2 Page 15 Of;.>6

'!'ABLE 2 PALI~ADES INSERVICE INSPECTION NO. 6 Sununary of Areas Examined and Results ASME SEC. IX ASME SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S) IDENTIFICATION EXAMINATION RESULTS VT SWS-6-CRS- 3Sl PS-1 Acceptable VT SWS-6-CRS-3Sl PS-2 See Table 1 VT VT SWS-6-CRS-3Sl SWS-6-CRS-3S2 PS-3 PS-1 Acceptable Acceptable e

VT SWS-6-CRS-3S2 PS-2 Acceptable VT SWS-6-CRS-4Sl PS Acceptable VT SWS-6-CRS-4S2 PS-1 Acceptable VT SWS-6-CRS-4S2 PS-2 Acceptable VT SWS-6-CRS-4S2 PS-3 Acceptable SWS-6-CRS-lRl PS See Table 1 VT SWS-6-CRS-1R2 PS Acceptable VT SWS-6-CRS-2Rl PS-2 Acceptable VT SWS-6-CRS-2R2 PS-1 Acceptable VT SWS-6-CRS-2R2 PS-2 Acceptable VT SWS-6.-CRS- 3Rl PS-1 Acceptable VT sws-6-CRS-3R2 PS-1 Acceptable VT SWS-6-CRS- 3R2 PS-2 Acceptable VT SWS-6-CRS-3R2 PS-3 Acceptable VT SWS-6-CRS-4Rl PS-1 Acceptable VT SWS-6-CRS-4Rl PS-2 Acceptable SWS-6-CRS-4R2 PS-1 Acceptable VT SWS-6-CRS-4R2 PS-2 Acceptable V'f SWS-6-CRS-4R2 PS-3 Acceptable

Palisades Final Report ISI No. 6 '

Table 2 Page 16 of26 TABLE 2 PALISADES INSERVICE INSPECTION N0.6 Summary of Areas Examined and Results ASME SEC. IX ASME SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S) IDENTIFICATION EXAMINATION RESULTS VT SWS-6-EPS-RLA PR-1 Acceptable VT SWS-6-EPS-RLA PR-2 Acceptable VT SWS-6-EPS-RLA PR-3 Acceptable VT SWS-6-EPS-RLA PR-4 Acceptable VT SWS-6-EPS-RLA PR-5 See Table 1 VT SWS-6-EPS-RLA PR-6 See Table 1 VT SWS-6-EPS-RLA PR-7 Acceptable VT SWS-6-EPS-RLA PR-8 Acceptable VT SWS-6-EPS-RLA PR-9 See Table 1 VT SWS-6-EPS-RLA PR-10 See Table 1 VT SWS-6-EPS-RLA PR-11 Acceptable VT SWS-6-EPS-RLB PR-1 Acceptable VT SWS-6-EPS-RLB PR-2 Acceptable VT SWS-6-EPS-RLB PR-3 Acceptable VT SWS-6-EPS-RLB PR-3A Acceptable VT SWS-6-EPS-RLB PR-4 Acceptable VT SWS-6-EPS-SLA PR-1 See Table 1 V'r SWS-6-EPS-SLA PR-2 See Table 1 VT SWS-6-EPS-SLA PR-3 See Table 1 VT SWS-6-EPS-SLA PR-4 See Table 1 VT SWS-6-EPS-SLA PR-5 Acceptable v*r SWS-6-EPS-SLA PR-6 See Table 1 VT SWS-6-EPS-SLA PR-7 See Table 1

Palisades Fii1al Report ISI No. 6.

'l'able 2

)

Page 17 of ~~6

'l'ABLE 2 PALJ::;ADES INSERVICE INSPt:C'l'ION NO. 6 Sununary of Areas Examined and Results ASME SEC. IX ASME SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S) IDENTIFICATION EXAMINATION RESULTS VT SWS-6-EPS-SLA PR-8 Acceptable VT SWS-6-EPS-SLA PR-9 Acceptable VT SWS-6-EPS-SLA PS Acceptable VT sws-6..:.EPS-SLB PR-1 See Table 1 V'l' SWS-6-EPS-SLB PR-3 Acceptable VT SWS-6-EPS-SLB PR-4 Acceptable VT SWS-6-EPS-SLB PR-5 See Table 1 VT

... SWS-6-EPS-SLB PR-6 See Table 1 V'l' SWS-6-EPS-SLB PR-7 Acceptable VT SWS-6-EPS-SLB PR-8 See* Table 1 VT SWS-6-Ers..:.sLB PR-8A Acceptable VT SWS-6-EPS-SLB PR-9 See Table 1 VT. SWS-6-EPS-SLB PS Acceptable V'l' CCS-24-CPU-lPA PR Acceptable VT CCS-20-CHX-lPl PR-1 Acceptable V'l' CCS-20-CHX-lPl- PR-2 Acceptable V'r CCS-20-CHX-lPl PR-3 Acceptable V'l' CCS-20-CHX-RLB PS Acceptable V'l' CCS-20-CPU-lPA PR Acceptable V'l' CCS-20-CPU-lPA PS See Table 1 VT CCS-16-CPU-lPA PS Acceptable V'l' CCS,-20-CPU-lPB PS Acceptable VT CCS-16-CPU-lPB PS See Table 1 V'r CCS-20-CPU-lPC PS See Table l

Palisades Final Report ISI No. 6 Table 2 Page 18 of 26

'rABLE 2 PALISADES INSERVICE INSPECTION N0.6 Swnmary of Areas Examined and Results ASME SEC. IX ASME SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. ~'THOD(S) IDENTIFICATION EXAMINATION RESULTS VT CCS-16-CPU-lPC PS See Table 1 VT CCS-18-RHC-lPl PR-1 See Table 1 VT CCS-18-RHC-lPl PR-2 Acceptable VT CCS-24-RHC-lPl PR-3 See Table 1 VT CCS-10-ARH-lPl PR-1 See Table 1 VT CCS-10-ARH-lPl PR-2 Acceptable V'l' CCS-10..,ARH-lPl PR-3 See Table 1 VT CCS-10-ARH-lPl PR-4 Acceptable V'l' CCS-10-CSH-lPl PR-1 Acceptable VT CCS-10-CSH-lPl PS-1 Acceptable VT CCS-10-CSH-lPl PR-2 Acceptable VT CCS-10-CSH-lPl PS-2 See Table 1 VT CCS-10-CSH-lPl PR-3 Acceptable VT CCS-10-CSH-lPl PR-4 Acceptable VT CCS-10-CSH-lPl PR-5 Acceptable VT CCS-10-CSH-lPl PR-5AA Acceptable VT CCS-10-CSH-lPl PR-6 See Table 1 VT CCS-10-CSll-lPl PR-7 Acceptable VT CCS-10-CSll-1P3 PR Acceptable VT CCS-10-CSH-1P3 PL-1 Acceptable VT CCS-10-CSH-1P3 PL-2 Acceptable V'l' CCS-10-CSH-1P3 PL-3 Acceptable VT CCS-10-CSll-1P3 PL-4 Acceptable

Palisades Final Report ISI No. 6 Table 2 Page 19 of 26

'l'ABLE 2 PALISADES INSERVICE INSPECTION NO. 6 Swnmary of Areas Examined and Res;u_ts ASME SEC. IX ASME SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METllOD(S) IDENTIFICATION EXAMINATION RESULTS VT CCS-10-CSH-1P4 PR-1 Acceptable VT CCS-10-CSH-1P4 PS-1 See Table 1

. VT CCS-10-CSH-1P4 PS-lAA Acceptable v*r CCS-10-CSH-1P4 PL-1 Acceptable V'r CCS-10-CSH-1P4 PL-2 Acceptable VT CCS-10-CSH-1P4 PL-3 Acceptable VT CCS-10-CSH-1P4 PL-4 Acceptable VT CCS-10-CSH-1P4 PR-2 Acceptable V'l' CCS-10-CSH-1P4 PS-2 See Table 1 VT CCS-10-CSH-1P4 PR-3 Acceptable VT CCS-10-CSH-1P4 PS-3 Acceptable VT CCS-10-CSH-1P4 PR-4 Acceptable VT CC$-10-CSH-1P4 PR-5 Acceptable V'r CCS-10-CSH-1P4 PR-6 Acceptable VT CCS-10-CSH-1P4 PR-7 Acceptable VT SFP-14-~'PF-RLl PR-1 See Table 1 VT SFP-14-FPF-RLl PR-2 Acceptable VT SFP-12-SFX-RLl **PR-1 Acceptable VT SFP-12-SFX-RLl PR-2 Acceptable VT SFP-10-FPP-lPA PR-1 Acceptable VT SFP-10-FPP-lPA PS Acceptable v*r SFI'-10-FPP-lPA PR-;~ Acceptable V'r SFP-10-FPP-lPB PR Acceptable

Palisades Final Report

!SI No. 6

'!'able 2 Page 20 of 26 TABLE 2 PALISADBS INSERVICE INSPECTION NO. 6 Swnmary of Areas Examined and Results ASME SEC. IX ASME SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S) IDENTIFICATION EXAMINATION RESULTS VT SFP-10-FPP-lPB PS Acceptable VT SFP-8-FPP-lPA

  • PR-1 Acceptable VT VT SFP-8-FPP-lPA SFP-8-FPP-lPA PR-2 PR-3 Acceptable Acceptable e

VT SFP-8-FPP-lPA PR-4 Acceptable VT SFP-8-CPL-DLl PR-1 Acceptable VT SFP-8-CPL-DLl PR-2 Acceptable VT SFP-8-CPL-DLl PS Acceptable VT SFP-8-CPL-DLl PR-3 Acceptable VT SFP-6-CPL-SLl PR-1 Acceptable VT SFP-6-CPL-SLl PR-2 Acceptable VT SFP-6-CPL-SLl PR-3 Acceptable VT SFP-6-CPL-SLl PR-4 See Table 1 VT V'l' SFP-6-CPL-SLl SFP-6-CPL-SLl PR-5 PR-6 See Table 1 Acceptable e

VT DMW-6-CST-AFS PR-1 Acceptable

~*1.13 B-I-1 PT Reactor Vessel Closure Head Acceptable Patch N4 Bl.13 B-I-1 VT Reactor Vessel Closure Head Acceptable Patch N4 Bl.13 B-I-1 P'l' Reactor Vessel Closure Head Acceptable Patch b6 fll.13 B-I-1 VT Reactor Vessel Closure Head Acceptable Patch N6 B4.5 B-J l.J'l' PCS-42-RCL-ltt-6 Acceptable

/,.*--- ...

Palisades Final Report \

!SI No. 6 )

  • Table 2 Page 21 of 26 TABLE 2 PALISADES INSERVICE INSPECTION N0.6 Swnmary of Areas Examined and Results ASME SEC. IX ASME SEC. IX EXAM COMPONENT ITEM NO. CA'l'. NO. METHOD(S) IDENTIFICATION EXAMINATION RESULTS B4.5 B-J l1l' PCS-30-RCL-lB-l Acceptable B4.5 B-J u*r PCS-30-RCL-2B-l See Table 1 B4.5 B-J l1l' ESS-2.5-SIS-lBl-18 Acceptable B6.9 B-G-2 VT CK-3102 Acceptable B6.9 B-G-2 VT CK-3116 Acceptable B6.9 B-G-2 VT M0-3008 Acceptable B6.9 B-G-2 VT M0-3041 See Table 1 B6.9 B-G-2 VT M0-3045 See Table 1

-~-- .. Palisades Final Report

!SI No. 6 Table 2 Page 22 of 26 IE BULLETIN TABLE 2 PALISAD~S INSERVICE INSPECTION NO. 6 Summary of Areas Examined and Results ASME SEC. IX ASME SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S) IDENTIFICATION EXAMINATION RESULTS VT CCS-10-CSH-1P4/PR-7 Acceptable VT CCS-10-CSH-1P4/PL-3 Acceptable C2.l C-G UT CVC-4-BAI-1P4-205 Acceptable C2.l C-G UT CVC-4-BAI-1P4-206 Acceptable C2.l C-G UT. CVC-4-BAI-1P6-201 Acceptable C2.l C-G UT CVC-4-BAI-1P6-201A Acceptable 0

. c2 .. 1 C-G UT CVC-4-BAI-1P7-201 Acceptable C2.l C-G UT CVC-3-BAI-1P2-203 Acceptable C2.l C-G UT CVC-3-BAI-1P7-232 Acceptable C2.l C-G U'l' CVC-3-BAI-1P8-205 Acceptable C2.l C-G UT CVC-4-BAP-SBL-201 Acceptable C2.l C-G UT CVC-4-BAP-5LB-201 Acceptable C2.l C-G UT ESS-10-CSS-SLB-201 Acceptable C2.l C-G UT ESS-8-CSS-SLB-212 *Acceptable C2.l C-G UT ESS-8-CSS-SLB-219 Acceptable C2.l C-G UT ESS-6-SlS-2HP-209 Acceptable C2.l C-G UT ESS-6-SlS-3HP-206 Acceptable C2.l C-G UT ESS-4-SlS-HPB-210 Acceptable C2.l C-G UT ESS-3-SlS-HPA-235 . Acceptable C2.l C-G UT ESS-3-SlS-HPB-227 Acceptable c2.1 C-G UT ESS-3-SlS-HPC-214 Acceptablle C2.l C-G UT ESS-3-SlS-3HP-201 Acceptable UT ESS-4-SlS-HPB-204 Acceptable UT ESS-3-SlS-HPC-216 Acceptable

y Palis~des Finul Report ISI No. 6

'!'able 2 Page 23 of 26 IE BULLh"l'IN

'rABLE 2 PALISADES INSERVICE INSPECTION NO. *6 Swnmury of Areas Examined and Results ASME SEC. IX ASME SEC. IX EXAM CQMPONENT ITEM NO. CAT. NO. ME'l'llOD(S) IDENTIFICATION EXAMINATION RESULTS UT ESS-3-SlS-HPB-230 Acceptable C2.3 C-G u*r FWS-18-FWL-lSl-246/6-AWS-lSl Acceptable C2.l C-G RT FWS-18-FWL-lSl-248 Acceptable C2.6 C-E-2 VT FWS-18-FWL-lSl-248 PR Acceptable C2.l C-G R'l' FWS-18-FWL-lSl-251 Acceptable C2.6 C-E-:2 VT FWS-18-FWL-lSl-251 PR See Table 1 c2.6 C-E-2 VT FWS-18-FWL-lSl-252 PR Acceptable C2.l C-G RT F'WS-18-FWL-lSl-255 Acceptable C2.l C-G RT FWS-18-FWL-lSl-256 Acceptable C2.6 C-E-2 VT F'WS-18-FWL-lSl-256 PR Acceptable C2.l C-G R'r FWS-18-FWL-lSl-257 See Table 1 C2.l C-G RT F'WS-18-FWL-lSl-258 See Table 1 c2.6 C-#-2 VT F'WS-18-FWL-lSl-258 PR-1 Acceptable C2.6 C-E-2 V'l' FWS-18-FWL-lSl-258 PR-2 Acceptable C2.l C-G RT FWS-18-FWL-lSl-259 See Table 1 C2.l C-G R'r FWS-18-FWL-lSl-260 See Table 1 C2.l C-G RT FWS-18-FWL-lSl-261 See Table 1 C2.l C-G U'P F'WS-18-FWL-lSl-261 See Table 1 C2.l C-G R'l' FWS-18-FWL-lSl-262 See Table 1 C2.3 C-G UT FWS-18-FWL-2Sl-241/FWS-6-AWS-2Sl Acceptable C2.l C-G R'l' FWS-18~FWL-2Sl-248 Acceptable C2.l C-G RT FWS-18-FWi.-2Sl-249 Acceptable C2.6 C-E-2 VT

-FWS-18-F'WL-2Sl-249 PR Acceptable C2.6 C-E-2 VT FWS-18-FWL-2Sl-252 PR Acceptable

Palisades Final Report IS! No. 6 \

Table 2 Page 24 of26 IE BULLRl'IN TABLE 2 PALISADES INSERVICE INSPECTION N0.6 Summary of Areas Examined and Results ASME SEC, IX ASME SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S) IDENTIFICATION EXAMINATION RESULTS c2.6 C-E-2 VT FWS-18-FWL-2Sl-253 PR Acceptable

.. c2.6 C'-E-2 VT FWS-18-FWL-2Sl-257 PR Acceptable C2.l c2.6 C-G C-E-2 RT VT FWS-18-FWL-2Sl-259*

FWS-18-FWL-2Sl-259 PR-1 See Table 1 Acceptable e

C2.6 C-E-2 VT FWS-18-FWL-2Sl-259 PR-2 Acceptable C2.l C-G RT FWS-18-FWL-2Sl-260 See Table 1 c2.1 C-G RT FWS-18-FWL-2Sl-261 See Table 1 C2.l C-G RT FWS-18-FWL-2Sl-262 See Table 1 C2.l C-G UT FWS-18-FWL-2Sl-262 See Table 1 C2.l C-G RT FWS-18-FWL-2Sl-263 See Table 1 UT SFP-14-FPF-RLl-303 Acceptable UT SFP-14-FPF-RLl-301 Acceptable UT SFP-8-CPL-DLl-320 Acceptable UT SFP-8-CPL-DLl-321 Acceptable UT SFP-8-FPF-RLl-304 Acceptable UT SFP-8-FPF-RLl-222 Acceptable UT SFP-8-FPF-RLl-224 Acceptable UT SFP-8-FPF-RLl-225 Acceptable UT SFP-6-SRT-RLl-225 Acceptable UT SFP-3-FPP-FPB-301 Acceptable UT SFP-3-FPP-FPB-303 Acceptable C2.l C-G UT RWS-6-CWR-SL4-202 Acceptable

Palisades Final Report ISI No. 6 \

i Table 2 Page 25 of *26 IE BULLETIN TABLE 2 PALISADES INSERVICE INSPECTION N0.6 Summary of Areas Examined and Results ASME.SEC. IX ASME SEC. IX EXAM COMPONENT ITEM NO. CAT. NO. METHOD(S) IDENTIFICATION EXAMINATION RESULTS C2.l C-G UT RWS-4-CWT-lPl-203 Acceptable MT Feedvater Nozzle ID Acceptable S/G a MT Feedvater Nozzle ID Acceptable S/G B

Palisades Final Report IS! No. ,_ .

Table 2 Page 26 of 26 TABLE 2 PALISADES INSERVICE INSPECTION N0.6 Summary of Areas Examined and Results ASME SEC. IX ASME SEC. IX EXAM COMPONENT.

ITEM NO. CAT. NO. METHOD(S) IDENTIFICATION EXAMINATION RESULTS FLT Alixiliary Feedwater System Acceptable

& T81 and T-2 HYD Containment Vent Acceptable

  • Header, Quench Tank SI Bottle Vents FLT PCS-PC-Pump Seal Acceptable FLT Chemical and Volume Control Acceptable HYO Redundant HPSI Acceptable HYO HPSI Acceptable HYD MSS to Aux Feed Pump Acceptable HYO Critical Service Water Acceptable Header B HYD Service Water Header A Acceptable HYO Waste Gas Tank Piping Acceptable HYO SI Tank Fill and Drain Lines Acceptable FLT Component Cooling Acceptable FLT Primary System Make-Up Storage Acceptable Tank T-90, T-91 HYD Spent Fuel Pool Cooling Acceptable IWA-5221 FLT PCS Leak Test Acceptable

FORM NIS-1 OWNERS' DATA. REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules .

1. Owner Consumers Power Companv 212 W Michigan Avenue Jackson. MI 49201 (Name and Address of Owner)
2. Plant __P....,..a.1.i~s~a-d.e~s_N~u_c~l.e~a~r.._.P~l~a~n~t,,.___.R~o~u~t~e,._.l..__.__.B=o~x..__.1~7~8~*...._~C~o~vue~rt

........__.M~I.....__4~9~0~4~3..________

(Name and Address of Plant)

3. Plant Unit _ _ __....._ _..__ _ 4. Owner Certificate of Authorization (if required) ___N......_/,.....__ _ __
5. Commercial Service Date 12/31/71 6. National Board Number for Unit *___N=--/A""---------
7. Components Inspected Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No. Province No. Board No.

(See.Examination Tables in Final Report ........)_ _ __

Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided ( 1) size is 8'h in. x 11 in.,

'2) information in items 1 through 6 on this data report is included on each sheet, and (3) each sheet is numbered

.ind the number o.f sheets is recorded at the cop of this form.

FORM NIS-1 (back)

8. Examination Dates 9 /8/79 to 5/28/80 9. Inspection Interval from J0/31 /.76 to_ 6/30/83
10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval.

See Tables in Final Report

11. Abstract of Conditions Noted.
  • See Final Report
12. Abstract of Corrective Measures Recommended and.Taken See Final Report We certify that the .statements made in this report are correct and the examinations and corrective mea-sures taken conform to the rules of the ASME Code,Section XI.

Date _ _ _ _(p"'-+-/. .9_-_

I

.. i9 'BO Signed Copsrnners Power Co Owner Certificate of Authorization No. (if applicable) _ _ _ _N__/_A____ Expiration Date ---=N"-"/-=A..;;._..,..------

i

/

CERTIFICATE OF lNSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel

  • Inspectors and/or the State or Province of Michigan and employed by HSBI & I Co of Hartford Conn. have inspe/d the components described in this Owners' Data Report duri_ng the period
  • 9 /8179 to
  • 6 9 /80 , and state that to the best of my knowledge and belief, the Owner has performed examinations ?n(f;aken corrective measures described in this Owners' Data Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concer:ning the examinations and corrective measures described in this Owners' Data Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

-~~.c...~::;;;...LJ1,......;J.c:::;._k:S.~::.Lo&:!:::::s.:::i<!:::::::::... <!:ommissions ___N=a~t=i...,.o....n~a=l"-"B....o....a=r~d"--'7~6~0~7~=-~M_i~c_h_i~g~a_n~4~1~4_ __

National Board, State, Province and No.

  • The Authorized Inspection Agency (Company) nor the Inspector(s) assumes no liability with respect to any object referred to in this report, except such liability as may be provided in a policy of insurance which the Company may issue upon said object and then only in accordance with the terms of said
  • policy.

DATA CERTIFICATION Southwest Research Institute SwRI forwarded to CPCo seven volumes of information pertaining to the 1979 Palisades Inservice Inspection. The seven volumes, approved for publica-tion by C E Lautzenheiser, SwRI Level III, containing the following:

1) UT Cal Block Certifications
2) Personnel Certifications
3) Material and Equipment Certifications
4) Field Data The information contained in the seven volumes supplied by SwRI was extracted from these volumes and placed in the appropriate section of the Palisades Plant Outage/Plan.* The approval sheets, are included herein;

(

\

.e SwRI Data Certification

-~ SOUTHWEST RESEARCH INSTITUTE

(

Post Office Drawer 28510 6220 Culebra Road San Antonio, Texas 78284 1979 INSERVICE EXAMINATION OF PALISADES NUCLEAR POVvER PLANT VOLUME I CERTIFICATIONS SwRI PROJECT 17-3620 CONTENTS:

MATERIAL ANO EQUIPMENT CERTIFICATlONS MATERIAL EQUIPMENT TRANSDUCERS PERSONNEL CERTIFICATlONS

  • ULTRASONIC CALIBRATION BLOCK CERTIFICATIONS

(

Prepared for:

Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 February 1980 Prepared by: . Approved by:

Project Engineer Reviewed by:

QuaHty Assurance Systems and Engineering Division Project Manager

SOUTHWEST RESEARCH INSTITUTE.

( Post Office Drawer 28510 6220 Culebra Road San Antonio, Texas 78284 1979 INSERVICE EXAMINATION OF PALISADES NUCLEAR POWER PLANT VOLUME II FIELD DATA SwRI PROJECT 17-3620 CONTENTS:

CLASS 1 VESSELS REACTOR PRESSURE VESSEL REACTOR PRESSURE VESSEL CLOSURE HEAO

(

Prepared for:

Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 February 1980 Prepared by: Approved by:

Proje6t Engineer Reviewed by:

Quality Assurance Systems and Engineering Division P"'ject Manager

SOUTH\.VEST RESEARCH INSTITUTE Post Office Drawer 28510 6220 Culebra Road San Antonio, Texas 78284 1979 INSERVICE EXAMINATION OF PALISADES NUCLEAR POWER PLANT VOLUME Ill FIELD DATA (CONT'D)

SwRI PROJECT 17-3620 CONTENTS:

CLASS 1 VESSELS ICONT°DI PRESSURIZER.

STEAM GENERATOA A STEAM GENERATOA B CLASS 1 PIPING PRIMARY COOLANT SYSTEM ENGINEERED SAFEGUARDS SYSTEM CHEMICAL AND VOLUME CONTROL SYSTEM PRIMARY COOLANT PUMPS

(

Prepared for.

Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 February 1980 Prepared by:

Projk Engineer .

Reviewed by: Vice President Quality Assurance Systems

  • and Engineering Division Project Manager

~ ..

SOUTHWEST RESEARCH INSTITUTE Post Office Drawer 28510 6220 Cl.llebra Road San Antonio, Texas 78284 1979 INSERVICE EXAMINATION OF PALISADES NUCLEAR POWER PLANT VOLUME IV FIELD DATA (CONT'D)

SwRI PROJECT 17-3620 CONTENTS:

CLASS 1 VALVES CLASS 2 VESSEl.S STEAM GENERATOR A STEAM GENERATOR B REGENERATIVE HEAT EXCHANGERS CLASS 2 PIPING MAIN STEAM SYSTEM FEEDWATER SYSTEM

(

Prepared for:

Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 February 1980 Prepared by: Approved by:

~eviewed by.

/14 du,Je ~

Project Manager

SOUTHWEST RESEARCH INSTITUTE Post Office Drawer 28510 6220 Culebra RQad San Antonio, Texas 78284 1979 INSERVICE EXAMINATION OF PALISADES NUCLEAR POWER PLANT VOLUMEV FIELD DATA (CONT'D)*

SwRI PROJECT 17-3620 CONTENTS:

CL.ASS 2 PIPING ICONT'OI ENGINEERED SAFEGUARDS SYSTEM

  • CHEMICAL ANO VOLUME CONTROL SYSTEM RADWASTE SYSTEM SPENT FUEi. POOL SYSTEM CLASS 3 PIPING PRIMARY COOLANT SYSTEM SERVICE WATER SYSTEM Prepared for:

Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 February 1980 Prepared by: Approved by:

Proj Engineer Reviewed by:

Project Manager

SOUTHWEST RESEARCH INSTITUTE Post Office Drawer 28510 6220 Culebra Road San Antonio, Texas 78284 1979 INSERVICE EXAMINATION OF PALISADES NUCLEAR POWER PLANT VOLUME VI FIELD DATA (CONT'D)

SwRI PROJECT 17-3620 CONTENTS:

Cl.ASS 3 PIPING (CONT'DI SERVICE WATER SYSTCM ICONro1 COMPONENT COOLING SYSTCM SPENT FUEL POOL SYSTCM CALIBRATION SHEETS 190000 SERIES Prepared for:

Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 February 1980 Prepared by: Approved by:

Pro;k Engineer

  • Reviewed by:

Quality Assurance Systems and Engineering Division Project Manager

, ti. r "

SOUTHWEST RESEARCH INSTrrUTE Post Office Drawer 28510 6220 Culebra Road San Antonio, Texas 78284 1979 INSERVICE EXAMINATION OF PALISADES NUCLEAR POWER PLANT VOLUME VII FIELD DATA (CONT'D)

SwRI PROJECT 17-3620 CONTENTS:

CALIBRATION SHEETS ICONT"Cl 250000 SERIES 360000 SERIES 370000 SERIES 460000 SERIES 570000 SERIES MECHANIZED RECORD FORMS 730000 SERIES .

740000 SERIES 810000 SERIES CUSTOMER NOTIFfCATION FORMS.

Prepared for:

Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 February 1980 Prepared by:

Prej~ Engineer Reviewed by:

Project Manager

CONSUMERS POWER COMPANY SYSTEM PROTECTION AND LABORATORY SERVICES NONDESTRUCTIVE TESTnm DEPARTMENT

.* 1979 INSERVICE EXAMINATION OF THE PALISADES NUCLEAR PLANT PROJECT 79002-P

( .

~c:i..m-...A.11;:ader Final Report Review

~

<*l-~.,?,) _4;,/~,/ 1/;_1/</r I

vNDT Department SuperVisor Approval Revision 1 - Revised 1-18-80

  • n\TA CERTIFICATION

( System Protection and Laboratory Services (CPCo)

SP&LS forwarded to CPCO-OSD one volume of information pertaining to the 1979 Palisades Inservice Inspection. The volume, approved for publication by E Q Martinez, CPCo Level III, containing the following:

1) Personnel Certifications
2) Equipment and Material Certif'ications
3) Field Data The information contained in the volume supplied by SP&LS was extracted from the volume and placed in the appropriate section of the Palisades Plant Outage/Plan.

The approval sheet is included herein.

(

\