ATTACHMENT Consumers Power Company Palisades Plant Docket 50-255 1988 INSERVICE INSPECTION REPORT OC0289-0042-NL04


~-

~0~??104~6 890210 -

  • F~[*,6--(.~*.c~OCK 0500025~

PDC G:!

February 10, 1989 16 Pages

MI1088-1659A-TC01 PALISADES NUCLEAR PLANT 1988 INSERVICE INSPECTION NO 2-3 INTRODUCTION

PALISADES NUCLEAR PLANT 1988 Inservice Inspection. No 2-3 The Inservice Inspection No 2-3 was conducted during the period of August 24, 1988 through November 24, 1988.

Inspections were conducted in accordance with the Palisades Plant Technical Specifications, Sections 4.3 and 4.12.

The ASME Boiler and Pressure Vessel Code,Section XI and the Plant Technical Specifica-tions as follows:

Item Class 1, 2 and 3 Piping and Components Class 1, 2 and 3 Component Supports Examination 77S78 77W78 Acceptance 77S78 77W78 The* NDT examinations were performed using manual ultrasonic (UT), liquid pene-trant (PT), visual (VT), and magnetic particle (HT) techniques.

Indications were recorded in compliance with applicable procedures; reportable indications which were judged by the examination agencies to be reievant were documented and transmitted to CPCo, ISI personnel for evaluation.

ISI evaluated all reportable indications and dispositioned each by "accepting as is" or by per-forming the necessary repairs and reexaminations.

Two examination agencies were utilized in onsite NDT-ISI act1v1t1es.

The agen-cies were Westinghouse and CPCo Laboratory and Field Technical Services (L&FTS).

Inspection personnel were qualified in accordance with the requirements set forth-by IWA-2300,Section XI of ASHE B&PV Code.

All records of procedures, personnel and equipment certifications, examination data and dispositions of all reportable indications are on file at the Palisades Nuclear Plant.

HI1088-1659A-TC01

FO.IS-1 OWNER'S REPORT FOR INSERVICE.ECTIONS

. As required by the Provisions of the ASME Code Rules

1. owner Consumers Power Company, 212 West Michigan Ave, Jackson, MI 49201 (Name and Address of Owner)
2. Plant Palisades Nuclear Plant, 27780 Blue Star Memorial Hwy, Covert, MI 49043 (Nam*: an.d Address of Plant)
3. Plant Unit _____

1 ____ 4. Owner Certificate of Authorization (if required) ___

N __

/ A ___ _

5. Commercial Service Date 12/31/71 6. N.nional Board Number for Unit ------------

NB20827

7. Components Inspected Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No.

Province No.

Board No.

Reactor Vessel Combustion Engineer~

CE-66110 M96725M NB20827 Pressurizer Combustion Engineer~

CE-66601 M96728M NB20851 Steam Generate"'

"A" (or 1)

Combustion Engineering CE-66501 M96726M NB20849 See Table 2 of ISI Report Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8\\/i in. x 11 in.,

(2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82)

This Form (E00029) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, N.Y. 10017

FORM NIS-l (Back)

8. Examination Dates 8/15/88 to 11/24/88 9. Inspection Interval from 11/10/83 to 8/1 /94
10. Abstract of Examinations. Include a list of examinatiom. and a statement concerning status of work required for current interval.

See ISI Report, Table 2.

11. Abstract.of Conditions Noted*

See ISI Report, Table 1.

12. Abstract of Corrective Measures Recommended and l'ak.:n See ISI Report, Table 1.

We certify that the statements made in this report are correct and the examinations and corrective mea-sures taken conform to the rules of the ASME Code Sectic*n XI. 19 7 7 Edi ti on, Summer 7 8 Addenda Winter 78 Addenda for Component Supports Certificate of Authorization No. (if applicable)

N /A Expiration Date N /A I

Date

6 l 19 fil_ Signed Consumers Power Co. By -.
:::J.. ~ 4~~

Owner CERTIFICATE OF INS:ERVICE INSPECTION I, the undersigned, holding a valid commission issued by fae N.Ltional Board of Boiler and Pressure Vessel Inspectors and the State or*Province of Michigan

  • md employed by Protection Mutual Ins. Ji.

Norwood' MA have inspected the components described in this Owner's Report during the period 8 /15 I 88 to 11I2 4 / 88

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures de:;cribed in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising f o connected with this inspection.

Inspector's Signature Date ~H_<E-~-~d~--~~----19 §_!l_

(12/82)

Factory Mutual System M,'. rtoz.

National Board, State, Province, and Endorsements

1.

Prepared

~ ~ 4 j/\\

I :...__ ' -:ii.~-~ >

~*

Responsible Indivi~ al

3.

Approved

~?

.,g. >rz*. *

  • Final ApprQ_~r Engg and Maint Mgr MI1088-1659A-TC01 PALISADES NUCLEAR PLANT PLANT PROJECTS DEPARTMENT Review and _Approval Summary TITLE:

ISI REPORT 2-3

2.

Recommend Approval v:-; !t /.~**1

!.SS~

? Date

4.

Approved 1/~7/'il?

7 Daj?e I

~~/rt I

I

(, 2 /!:.)

,/ (..

  • Date Final Approver Date Plant_General Manager

PALISADES NUCLEAR PLANT 1988 INSERVICE INSPECTION REPORT Submitted in accordance with ASME Boiler and Pressure Vessel Code,Section XI, Article IWA-6000, 1977 Edition with addenda through Summer, 1978.

1.

Date:

2.

Corporate Headquarters:

3.

Plant:

4.

Unit No:

5.

Conmercial Service Date:

6.

Gross Generating Capacity:

7.

See attached table and the remainder

8.

See attached table and the remainder

9.

See attached table and the remainder

10.

See attached table and the remainder

11.

Completion Date for Inspections:

12.

Code Inspector:

13.

Authorized Inspection Agency:

14.

Abstract:

MI1088-1659A-TC01 of of of of January 4, 1989 Consumers Power Company 212 West Michigan Avenue Jackson, MI 49201 Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 1

December 31, 1971 780 Mw electric 2530 Mw thermal the ISI Report the ISI Report the ISI Report the ISI Report November 24, 1988 Kenneth L Blake Protection Mutual, See ISI Report Norwood, MA

Item 7, 8, 9, 10 MAJOR COMPONENTS INSPECTED TABLE 1988 PALISADES INSERVICE~INSPECTION Manufacturer Manufacturer Serial No Components or Appurtenance Combustion Eng CE-66ll0 Reactor Vessel Combustion Eng CE-66601 Pressurizer Steam Generator A (or l)

Combustion Eng CE-66501 State Assigned No M96725M M96728M M96726M National Board No NB20827 NB20851 NB20849

TABLE 1 Resolution of Reportable Indications OC0988-0140-NL02

Component PCS-12-SCS-2Hl-13PS Reactor Vessel Interior FWS-18-FWL-251-257PR PCS-2-PSS-lPl-54 2A-S-A 2A-S-B MI10BB-1659B-TC01 Examination Methods PT VT-3 VT-3 PT PT PT TABLE 1 Resolution of Reportable Indications Condition Reported Reporting Mechanism Linear Indication ON No DMZ-092388-1 D-PAL-88-159 Foreign Parts in D-PAL-88-154 Vessel (Washers, Bolt and Pin)

Loose Nut D-PAL-88-122 Linear Indication DN No DMZ-100588-1 Linear Indications DN No DMZ-09i988-l Linear Indication DN No DMZ-091988-2 Rounded Indication Disposition Flap Indication Remove Parts Tighten Nut Accept As Is (Acceptable Per IWB-3514-3)

Accept As Is (Acceptable Per IWB-3516-2)

Accept As I:;

(Acceptable Per IWB-3516-2)

Palisades ISI Report ISI No 2-3 Table 1 Page 1 of 1 Reinspect ion Acceptable After Rework See DN No DMZ-100788-1 for Reexamination Acceptable

TABLE 2 Examination Summary OC0988-0140-NL02

ASME Section XI ASME Section XI Item No Cat No Bl.30

  • B-A B3.90 B-D B3.90 B-D B3.10 B-D B3.10 B-D B6.40 B-G-1 Bl3.l B-N-1 Bl.40 B-A B3.ll B-D B3.ll B-D B3.12 B-D B3.12 B-D B9.21 B-J BlO.l B-K-1 B9.21 B-J B7.50 B-G-2 C2.20 C-B B2.60 B-B B2.51 B-B B3.15 B-D B3.16 B-D B2.60 B-B B2.51 B-B F-1 F-A B9.21 B-J F-2 F-B F-3 F-C F-4 F-C MI01B9-1673A-TC01 TABLE 2 PALISADES INSERVICE INSPECTION NO 2-3

SUMMARY

OF AREAS EXAMINED AND RESULTS Exam Methods UT UT UT UT UT UT VT-3 UT UT UT UT UT PT PT PT VT-1 PT, UT UT UT UT UT UT UT VT-3

.PT VT-3 VT-3 VT-4 Component Identification 7-112, Vessel Circ Weld 5-ll4E, Nozzle to Shell 5-114F, Nozzle to Shell 5-ll4E-IRS, Nozzle Inner Radius 5-ll4F-IRS, Nozzle Inner Radius RPV - Ligaments 1-27, Flange Ligaments RPV - Vessel Interior 6-llBA 1-18, Vessel Circ Weld 1-986, Nozzle Weld 8-986A, Nozzle Weld 1-986-IRS, Nozzle Inner Radius 8-986A-IRS, Nozzle Inner Radius PCS-2.5-PRS-lPl-2, Pipe to Elbow PCS-2.5-PRS-1Pl-7PS, Pipe Support PCS-2.5-PRS-1P2-2, Elbow to Pipe PCS-2.5-PRS-1P2-8BT, Flange Bolting 2-2-959, Nozzle to Shell Weld E-56A-03 1 Circ Weld E-56A-04, Circ Weld E-56A-05, Nozzle to Shell E-56A-05-IRS, Nozzle Inner Radius E-56B-03, Circ Weld E-56B-04, Circ Weld E-56B-S-Ol, Dish Supports CVC-2-LDD-2Bl-l, Tee to Reducer ESS-6-SIS-1Bl-5PSS, Pipe Support ESS-6-SIS-2Bl-5PR, Pipe Restraint Palisades ISI Report ISI No 2-3 Table 2 Page 1 of 6 Final Examination Results Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable e

ASME Section XI ASHE Section XI Item No Cat No B9.40 B-J B9.40 B-J F-3 F-C F-3 F-C F-4 F-C F-3 F-C F-4 F-C F-3 F-C F-3 F-C F-4 F-C F-3 F-B C5.21 C-F F-3 F-C F-4 F-C F-3 F-C F-4 F-C F-3 F-B F-3 F-C F-3 F-C F-4 F-C C3.40 C-E F-2 F-B F-3 F-C F-4 F-C C3.40 C-E F-2 F-B F-3 F-C F-4 F-C MI0189-1673A-TC01 TABLE 2 PALISADES INSERVICE INSPECTION NO 2-3

SUMMARY

OF AREAS EXAMINED AND RESULTS Exam Component Methods Identification PT ESS-2-SIS-lBl-12, Pipe to Elbow PT ESS-2-SIS-2Bl-5, Tee to Pipe VT-3 FWS-18-FWL-1Sl-248PR, Pipe Restraint VT-3 FWS-18-FWL-1Sl-249PR, Pipe Restraint VT-4 VT-3 FWS-18-FWL-1Sl-252PR, Pipe Restraint VT-4 VT-3 FWS-18-FWL-1Sl-256PR, Pipe Restraint VT-3 FWS-18-FWL-1Sl258PR1, Pipe Restraint VT-4 VT-3 FWS-18-FWL-2Sl-249PR, Pipe Restraint PT, UT FWS-18-FWL-251-252, Elbow to Pipe VT-3 FWS-18-FWL-2Sl-252PR, Pipe Restraint VT-4 VT-3 FWS-18-FWL-2Sl-253PR, Pipe Restraint VT-4 VT-3 FWS-18-FWL-2Sl-257PR, Pipe Restraint VT-3 FWS-18-FWL-2Sl-259PR1, PiJ?e Restraint VT-3 FWS-18-FWL-2Sl-249PR2, Pipe Restraint VT-4 PT ESS-6-SIS-lBl-lPS, Pipe Support VT-3 ESS-6-SIS-lBl-lPSS, Pipe Support Structure VT-3 ESS-6-SIS-2Al-PR2, Pipe Restraint VT-4 PT ESS-6-SIS-2Al-1PS, Pipe Support VT-3 ESS-6-SIS-2Al-1PSS, Pipe Support Structure VT-3 ESS-12-SIS-1LP-241PR, Pipe Restraint VT-4 Palisades ISI *Report ISI No 2-3 Table.2 Page 2 of 6 Final Examination Results Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable e

ASME Section XI ASME Section XI Item No Cat No C5.ll C-F C5.ll C-F C.3.40 C-E BlO.l B-K-l F-2 F'-B F-3 F-C Bl0.1 B-K-l F-2 F-B BlO.l B-K-l F-2 F-B B9.ll B-J B9.ll

  • B-J B9.ll B-J F-3 F-B F-3 F-B F-3 F-B F-3 F-C F-4 F-C B9.2l B-J B9.2l B-J B9.2l B-J B9.2l B-J B9.2l B-J B9.40 B-J F-3 F-B B9.40 B-J B9.ll B-J BlO.l B-K-l MIOlB9-l673A-TCOl

' \\

TABLE 2 PALISADES INSERVICE INSPECTION NO 2-3

SUMMARY

OF AREAS EXAMINED AND RESULTS Exam Methods PT PT PT PT VT-3 VT-3 PT VT-3 PT VT-3 PT, UT PT, UT PT, UT VT-3 VT-3 VT-3 VT-3 VT-4 PT PT PT PT PT PT VT-3 PT PT, UT PT Component Identification ESS-12-SIS-lLP-242, Pipe to Elbow ESS-6-SIS-lHP-223A, Pipe to Tee ESS-6-SIS-lHP-227PS, Pipe Support PCS-l2-PSL-lHl-3PS, Pipe Support PCS-l2-PSL-1Hl-3PSS, Pipe Support Structure PCS-l2-PSL-1Hl-5PR-B, Pipe Restraint PCS-12-SCS-2Hl-10PSB, Pipe Support PCS-12-SCS-2Hll0PSSB, Pipe Support Structure PCS-l2-SCS-2Hl-l3PS, Pipe Support PCS-l2-SCS-2Hl-13PSS, Pipe Sup~rt Structure PCS-4-PSS-lPl-l, Reducer to Pipe PCS-4-PSS-lPl-12, Elbow to Pipe PCS-4-PSS-lPl-15, Pipe to Elbow PCS-3-PSS-1Bl-4PR-A, Pipe Restraint PCS-3-PSS-lBl-BPR, Pipe Restraint PCS-3-PSS-1Bl-l4PR-B, Pipe Restraint PCS-3-PSS-1Bl-l4BPR, Pipe Restraint PCS-3-PSS-lBl-15, Pipe to Elbow PCS-3-PSS-2Al-l3, Elbow to Pipe PCS-3-PSS-2Al-l4, Pipe to Elbow PCS-3-PSS-2Al-l9, P1pe to Elbow PCS-3-PSS-2Al-20, Elbow to Pipe PCS-2-DRL-lHl-3, Pipe to Tee PCS-2-LDL-2Bl-l4PR-B, Pipe Restraint PCS-2-LDL-2Bl-l7, Pipe to Valve ESS-6-SIS-lAl-12, Pipe to Elbow ESS-6-SIS-2Bl-l5PL-l, Pipe Lug Palisades ISI*Report ISI No 2-3 Table 2 Page 3 of 6 Final Examination Results Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable e

ASME Section XI ASME Section XI Item No Cat No BlO.l B-K-1

.BlO.l B-K-1 BlO.l B-K-1 F-3 F-B B9.40 B-J B9.40 B-J B9.40 B-J F-3 F-B F-3 F-B B9.40 B-J F-3 F-B F-3 F-B F-3 F-B F-3 F-B F-3 F-B F-3 F-B B9.40 B-J B9.40 B-J B9.40 B-J B9.40 B-J B9.40 B-J B9.40 B-J B9.40 B-J B9.40 B-J F-3 F-B F-3 F-B F-3 F-B F-3 F-B MI0189-1673A-TC01 TABLE 2 PALISADES INSERVICE INSPECTION NO 2-3

SUMMARY

OF AREAS EXAMINED AND RESULTS Exam Component Methods Identification PT ESs-6-SIS-2Bl-15PL-2, Pipe Lug PT ESS-6-SIS-2Bl-15PL-3, Pipe Lug PT ESS-6-SIS-2Bl-15PL-4, Pipe Lug VT-3 "ESS-6-SIS-2Bl-19PR-C, Pipe Restraint PT ESS-2-LTC-lA-21, Pipe to Tee PT ESS-2-LTC-lB-19, Tee to Pipe PT ESS-2-LTC-lB-20, Tee to Pipe VT-3 ESS-2-LTC-1B-20PR, Pipe Restraint*

VT-3 ESS-2-LTC-1B-34PS, Pipe Support PT CVC-2-CHL-lAl-4, Pipe to Tee VT-3 CVC-2-CHL-2Al-15PR, Pipe Restraint VT-3 CVC-2-CHL-2Al-23PR-A, Pipe Restraint V'r-3 CVC-2-CHL-2Al-23PR-B, Pipe Restraint VT-3 cvc-2-CHL-2Al.-23PR-C, Pipe Restraint VT-3 CVC-2-CHL-2Al-23PR-D, Pipe Restraint VT'-3 CVC-2-CHL-2Al-27PR-A, Pipe Restraint PT CVC-2-CHL-2Al-46, Pipe to Valve PT CVC-2-LDL-2Bl-26, Pipe to Elbow PT CVC-2-LDL-2Bl-27, Elbow to Pipe PT CVC-2-LDL-2Bl-28, Pipe to Elbow PT CVC-2-LDL-2Bl-29, Elbow t Pipe PT CVC-2-LDL-2Bl-30, Pipe to Elbow PT CVC-2-LDL-2Bl-31, Elbow to Pipe PT CVC-2-LDL-2Bl-33, Elbow to Pipe VT-3 CVC-2-LDL-2B2-llPR, Pipe Restraint VT-3 CVC-2-LDL-2B2-13PR, Pipe Restraint VT-3 CVC-2-LDL-2B2-27PR-l, Pipe Restraint VT-3 CVC-2-LDL-2B2-27PR-2, Pipe Restraint Palisades ISI Report

!SI No 2-3 Table 2 Page 4 of 6 Final Examination Results Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Ac.ceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable_

Acceptable Acceptable Acceptable e

ASME Section XI Item No F-3 F-3 B9.32 B9.32 Bl0.2 Bl0.2 Bl0.2 Bl0.2 F-2 Bl0.2 Bl0.2 Bl0.2 Bl0.2 F-2 B7.70 B7.70 F-2 C5.12 F-3 F-3 F-4 F-3 F-3 F-3 F-4 F-3 F-4 F-3 MI0189-1673A-TC01 ASME Section XI Cat No F-B F-B B-J B-J B-K-1 B-K-1 B-K-1 B-K-1 F-B B-K-1 B-K-1 B-K-1 B-K-1 F-B B-G-2 B-G-2 F-B C-F F-B F-C F-C F-B F-B F-C F-C F-C F-C F-B TABLE 2 PALISADES INSERVICE INSPECTION NO 2-3

SUMMARY

OF AREAS EXAMINED AND RESULTS Exam Methods VT-3 VT-3 PT PT PT PT PT PT VT-3 PT PT PT PT VT-3 VT-1 VT-1 VT-3 PT VT-3 VT-3 VT-4 VT-3 VT-3 VT-3 VT-4 VT-3 VT-4 VT-3 Component Identification CVC-2-LDL-2B2-31PR, Pipe Restraint CVC-2-LDL-2B2-34PR, Pipe Restraint PCS-2-PSS-lPl-54, Valve to Pipe PCS-2-PSS-lPl-55, Pipe to Reducer lB-S-A, Pump Support lB-S-B, Pump Support lB-S-C, Pump Support lB-S-D, Pump Support lB-SS, Pump Support 2A-S-A, Pump Support 2A-S-B, Pump Support 2A-S-C, Pump Support 2A-S-D, Pump Support 2A-SS, Pump. Support CK3102-BT, Valve Bolting CK3132-BT, Valve Bolting ESS-14-SCS-2Hl-204SS, Support Structure ESS-14-SCS-2Hl-206LI, Longitudinal Weld ESS-6-SIS-2HP-226PR1B, Pipe Restraint ESS-6-SIS-2HP-232PR, Pipe Restraint PCS-4-PSS-1Pl-4PR, Pipe Restraint PCS-4-PSS-lPl-lOPR-B, Pipe Restraint PCS-4-PSS-lPl-lOPR-C, Pipe Restraint PCS-4-PSS-1Pl-12PR-A, Pipe Restraint CVC-2-PSS-1Pl-50PR, Pipe Restraint Palisades ISI Report ISI No 2-3 Table 2 Page 5 of 6 Final Examination

' Results Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable

ASME Section XI ASHE Section XI Item No Cat No CS.12 C-F C5.ll C-F CS.12 C-F F-3 F-C F-4 F-C C5.ll C-F C5.ll C-F CS.21 C-F F-3 F-C F-4 F-C C5.ll C-F F-3 F-B F-3 F-B F-3 F-B MI0189-1673A-TC01 TABLE 2 PALISADES INSERVICE INSPECTION NO '2-3

SUMMARY

OF AREAS EXAMINED AND RESULTS*

Exam Component Methods Identification PT ESS-14-SDC-LPC-202LO, Longitudinal Weld PT ESS-10-SIS-LPA-230, Elbow to Pipe PT ESS-10-SIS-LPA-230LW, Longitudinal Weld VT-3 ESS-14-SDC-LPD213PRA, Pipe Restraint VT-4 PT ESS-14-SDC-LPD-220, Tee to Valve PT ESS-12-SIS-LPB-231, Reducer to Tee PT, RT, UT MSS-36-MSL-lSl-210, Pipe to Elbow VT-3 MSS-8-MSV-1Sl-210PR1, Pipe Restraint VT-4 PT MSS-6-RVR-282-203, Elbow to Flange VT-3 FWS-6-AWS-2Sl211PR-l, Pipe Restraint VT-3 FWS-6-AWS-2Sl211PR-2, Pipe Restraint VT-3 FWS-6-AWS-2S,l-200-PR, Pipe Restraint Palisades ISI Report ISI No 2-3 Table 2 Page 6 of 6 Final Examination Results Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable l

-