2017 Perry Nuclear Power Plant Initial Licensed Operator Examination JPM Review Comments
ML17164A136
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 02/03/2017
From: Reeser D W
NRC/RGN-III/DRS/OLB
To:
FirstEnergy Nuclear Operating Co
Shared Package
ML16242A243 List:
References
Download: ML17164A136 (10)


Text

2017 PERRY NUCLEAR POWER PLANT INITIAL LICENSE EXAMINATION ADMIN JPM REVIEW COMMENTS JPM #/TITLE COMMENT RESOLUTION RO ADMIN JPMS OT-3701-ADM_029_RO

1. The difficulty level of this JPM is too low. This is a satisfactory surveillance with no abnormalities. Its level of difficulty would be enhanced by required the applicant to identify and address at least one out of specification item during the surveillance. The SRO version of this JPM (OT-3701-ADM_029SRO) has an out-of-specification condition.
1. (Facility) The level of difficulty of this JPM is increased because the RO typically uses ICS to check parameters and record a SAT or UNSAT into Tech Spec Rounds. This surveillance is only performed if the ICS computer is down. We can modify to have an OOS reading if desired.

(NRC) OK as submitted.

2. JPM Step 5

- Clarify whether completion of all indicated items on the Data Package Cover Sheet are Critical. 2. Added note stating:

"The checkmark in the NON TECH SPEC/PERIODIC TEST DATA block is not CRITICAL on the Data Package Cover Sheet.

" OT-3701-ADM-012_RO NONE OT-3701-ADM_022_RO

1. JPM setting lists 'simulator', however it appears that photos of indicators will be provided to allow the JPM to be conducted in a classroom. This should be updated accordingly.
1. The Setup Instructions indicate this JPM can be done either in the simulator or classroom. If the simulator is used, Overrides are used to give the proper instrumentation indications. If the JPM is given in the classroom, then the pictures are used. We can decide setting during walkthrough week and modify as necessary.
2. It is requested that the facility provide a completed 'key' version of the calculation for use in grading.
2. Provided answer key to evaluators.

2017 PERRY NUCLEAR POWER PLANT INITIAL LICENSE EXAMINATION ADMIN JPM REVIEW COMMENTS JPM #/TITLE COMMENT RESOLUTION OT-3701-ADM_011_RO

1. Dose calculation JPM looks similar to audit in same part of outline (OT

-3701-ADM_003_RO). The exam team will need to see both JPMs for comparison since per ES

-301-3, item 1.c, duplication is not allowed between items on audit and NRC operating exams.

1. Provided Admin JPM for comparison.
2. Add Computer/FileNet access to list of Required Materials
2. Requested change was made.
3. Consider increasing "Validation Time"
3. No Changes made.
4. Step 1 "Critical Step" edit Airborne dose to 20 DAC and 2.5 mrem/DAC

-hr 4. Requested change was made.

5. Add ALARA Plan to References.
5. Added. SRO ADMIN JPMS OT-3701-ADM_029SRO
1. This JPM will need to be administered on the same day as RO Admin JPM

OT-3701-ADM_029_RO due to exam security (similar JPMs at different license levels).

1. Agree. Planned on doing these JPM's on same day.
2. JPM Setup

- Specify required materials to be available at the administration site.

2. Included listing of required materials.
3. Initiating Cue

- Specify that the package to be reviewed is attached. Add a statement that the data collected was recorded accurately.

3. Recommended changes were made.

2017 PERRY NUCLEAR POWER PLANT INITIAL LICENSE EXAMINATION ADMIN JPM REVIEW COMMENTS JPM #/TITLE COMMENT RESOLUTION

4. JPM Step 2
a. Correct step number in "Notes"
b. Last sentence of "Notes" should be incorporated into a new step addressing Non

-Technical Specification Test Data

4. Made the following changes
a. Typo corrected
b. Created new step 3; subsequent steps renumbered.
c. Addition of new step required modification of last step; Data Package cover page was modified to create a new critical step to identify that Tech Spec Data acceptability block had not be checked OT-3701-ADM_024SRO
1. For clarity, performance standard step 1 should be split into two steps. One step should be for the critical NRC notification, and the other step should be for the non

-critical state notification. The same should also be done with performance standard step 2. 1. JPM Steps 1 and 2 split into two Critical steps and two Standard steps for clarity.

2. 2 nd Step Second NOTE needs to be move to appropriate step.
2. Note moved to appropriate step.

OT-3701-ADM_030SRO

1. The required material section of the JPM lists that Technical Specification 3.8.2 will be provided. Instead of providing the specific Technical Specification needed for the JPM, instead provide an entire copy of Technical Specifications and Bases to be used as a reference.
1. The entire Tech Spec Books will be provided. 2. Initial Conditions

-- Correct typo "receive d" 2. Corrected 2017 PERRY NUCLEAR POWER PLANT INITIAL LICENSE EXAMINATION ADMIN JPM REVIEW COMMENTS JPM #/TITLE COMMENT RESOLUTION OT-3701-ADM_019SRO

1. Initial Condition

- Reword 2 nd paragraph to state "The following on shift personnel are available-" instead of four operators available for assignment.

1. Requested change was made.
2. Initiating Cue 1

- Add statement that "You are the Shift Manager."

2. Requested change was made.
3. Initiating Cue 2

- delete "Request and Approval portions of Perry" and form number. 3. Requested change was made.

OT-3701-ADM_312SRO

1. Initial Conditions need to state whether or not notifications for the SAE were completed or not. If not, then the classification time for the SAE needs to be included.
1. Updated Initial Conditions to include Initial Notifications completed 5 minutes ago.

Added clarification for barrier loss.

2. Instructor Cue in step 1 needs to be move d to the Initial Conditions/

Initiating Cue.

2. Deleted Instructor Cue from Step 1 as this info was already contained in the Initiating Cue.

2017 PERRY NUCLEAR POWER PLANT INITIAL LICENSE EXAMINATION ADMIN JPM REVIEW COMMENTS JPM #/TITLE COMMENT RESOLUTION

3. Performance step 3 needs to be divided into multiple steps that reflect the information that is required for the notification form to be considered accurate. For reference, NEI 99

-02 lists the items below that are related to the accuracy of a notification. The items in this list that are applicable to the Perry notification form should be designated as individual, critical steps. Class of emergency EAL number Description of emergency Wind direction and speed Whether offsite protective measures are necessary Potentially affected population and areas Whether a release is taking place Date and time of declaration of emergency Whether the event is a drill or actual event Plant and/or unit as applicable

3. Critical Step Standard revised to identify specific "critical" elements.

2017 PERRY NUCLEAR POWER PLANT INITIAL LICENSE EXAMINATION ADMIN JPM REVIEW COMMENTS JPM #/TITLE COMMENT RESOLUTION

4. For performance step 3, clarify the start and stop times to be used in determining whether the notification time requirement was met.
4. (Facility) The SRO has 15 minutes from the time of Classification to give the paperwork to the Communicator to make the Notification. Modified Step 3 to say, 'Initial Notification form completed within 15 minutes.' Is this the intent of this comment?

(NRC) After further discussion, the critical time was changed to 13 minutes to allow time for communication to be made. Time based on metric used by facility for drills and exercises.

5. Add non-critical step to have applicant provide Emergency Notification Cover Sheet to Communicator
5. Step added.

2017 PERRY INITIAL LICENSE EXAMINATION SYSTEMS JPM REVIEW COMMENTS JPM #/TITLE COMMENT RESOLUTION CONTROL ROOM SYSTEMS JPMS OT-3701-C71_501_RO

1. Initial Conditions/Cue

- Delete "I will perform back

-panel checks" from Cue and add "An operator is stationed at the back panels to assist you" to Initial Conditions Change made as requested.

2. JPM Steps 5, 13, and 21, Critical Step standard - delete "and hold" Changes made as requested.
3. JPM Steps 8 and 16 (Procedure step 11) - delete "Annuciator "Manual Scram SW Armed-" Alarm will not reset until after next procedure step is complete. Changes made as requested.
4. JPM Step 22

- Revise Critical Step Notes to simply Terminate the JPM after Mode Switch is placed in SHUTDOWN and rods are inserted.

Change made as requested.

OT-3701-C34_502_RO

1. JPM Step 4, Critical Step Standard

- Separate actions into three distinct actions. Separated into 3 distinct actions with annotation that balancing the in

-service flow controller is not "critical."

OT-3701-E51_003 1. Initial Conditions

a. Include reason to support need for aligning RCIC in Pressure Control
b. Add level control band
1. Made following changes
a. Added that scram due to MSIV closure b. Added that level control was in Manual with band of 150

-219 inches 2. JPM Step 1

- Add instructor cue related possibility of an additional isolation.

2. Added cue: "If asked, it is not anticipated that an isolation will occur." 3. JPM Step 2

- Remove Instructor Cue (info to be added to Initial Conditions.

3. Change made as requested.

2017 PERRY INITIAL LICENSE EXAMINATION SYSTEMS JPM REVIEW COMMENTS JPM #/TITLE COMMENT RESOLUTION

4. JPM Step 3

- Added Instructor Cue related to RPV Level status

4. Added cue: If asked, it is not anticipated that RPV level will go below Level 2 (130") and deleted subsequent Note.
5. JPM Step 8

- Add note indicating that procedure step 11 is not applicable.

5. Change made as requested.

OT-3701-E12_504_RO

1. For performance step 7, will the applicant be determining a cooldown rate? A means should be available for the evaluator to readily determine if the rate used by the applicant is too high. 1. (Facility) The right hand upper SPDS screen displays cooldown rate. Will show during walkthrough week.
2. The task standard (page 1) needs to reflect that the response to the alternate path RHR pump issue is a required part of the task.
2. (Facility) Corrected Task Standard.

OT-3701-B21_508_RO

1. JPM Step 2

-- Add instructor cue related to EOP

-SPIs status.

1. Added cue: "If asked, no EOP

-SPI's have been performed.

" 2. JPM Step 3

-- Add note stating that candidate may direct Radwaste to secure sump pumps.

2. Note added OT-3701-R43_016_RO
1. JPM Step 8, Critical Step Standard

- split standard into two distinct actions.

1. Change made as requested.
2. JPM Step 12

- Add instructor cue related local alarms.

2. Added cue: If NLO is questioned about local alarms on DG S/D, respond, "the Shutdown Cylinder is extended."

Also added note related to Shutdown Cylinder 3. JPM Step 14

- Add cue related to Prelube Valve status

3. Added cue:

"When asked, Prelube Valve is closed.

"

2017 PERRY INITIAL LICENSE EXAMINATION SYSTEMS JPM REVIEW COMMENTS JPM #/TITLE COMMENT RESOLUTION OT-3701-C51_002_RO

1. JPM Step 2

- add note indicating that applicant has choice of which section to perform or may perform from memory. 1. Added note:"

Candidate has choice of performing either section or from memory." OT-3701-M15_001_RO

1. The task standard states "Shift AEGTS trains per SOI

-M15 and respond to flow problems." This JPM is not listed as being an alternate path JPM on the coversheet or on Form ES-301-2 however. Additionally, the JPM does not contain an alternate path. It is unclear what the "-and respond to flow problems" portion of the task standard is referring to. The task standard needs to be updated to accurately reflect the required task to be performed.

1. (Facility) This was a typo and the Task Standard has been corrected. 2. JPM Step 4

- Make procedure step 7.1.7 a separate JPM step.

2. Created new step 5 and renumbered subsequent step.
3. JPM Step 5

- add note indicating that control switch for off

-going fan only needs to be held long enough for Annulus d/p Alarm resets.

3. Added not to step (now Step 6)

IN-PLANT JPMS OT-3701-E22B_001 1. For steps involving component manipulations, provide evaluator cues to be given for simulated component positions (i.e. valve doesn't turn any more, switch is in off position, etc.)

1. (Facility) Added Evaluator Cues.

OT-3701-C61_003_RO

1. Initiating Cue

- Add statement indicating that applicant has been provided any keys they may need.

1. Added "You have any keys you may need."

2017 PERRY INITIAL LICENSE EXAMINATION SYSTEMS JPM REVIEW COMMENTS JPM #/TITLE COMMENT RESOLUTION OT-3701-P41_001_RO

1. JPM Step 6

- Add Terminating Cue indicating that another operator will complete check of HPCS ESW Keepfill; Delete JPM step 7

1. Changes made as requested.