Attachment 3 L-17-067 Questions Asked by and Answers Given to the Applicants during the Written Examination (3 pages)
Perry License Class 1-LOT-17 NRC 2017 Exam - Questions from candidates 2116/2017 Page 1 r-=**** [ Q# . [ ~aI1didate j The candidate asked. I The proctor answered. .. j 1 R0-11 Colton Are we operating in single loop? Reread the question stem. Answer the question asked.
2 R0-60 Abernathy What is the name of the H51-P054A panel? Noun name of the panel is, "Engine Control Panel."
3 R0-75 Read Question states, " reactor operator". Is this referring to Do not assume specific position assigned to the reactor the RO-ATC? operator.
4 R0-21 Clem What does "place HPCS in standby readiness" mean? The standby readiness lineup per the SOL 5 R0-23 Clem Are there two right answers? There is only one correct answer?
6 R0-45 Clem Is the attached picture correct? The attached picture is correct.
7 R0-56 Clem What is the noun name of the breakers? Provided noun names of breakers.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~---
Perry License Class 1-LOT-1 7 NRC 2017 Exam - Questions from candidates 2/16/2017 Pa!!e
=
2 I IQ# I Candidate I The candidate asked. I The proctor answered. I 8 R0-63 Clem What is the position/status of the P41-F003 valve? Valves are in expected configuration for plant status (NOTE: This valve is not mentioned in the question.) unless otherwise stated.
9 R0-69 Clem There is no correct answer. This question does not There is only one correct answer. Reread the question.
make sense.
10 R0-73 Clem What is the setpoint for the main steam line radiation There is sufficient information given to answer the monitors? question.
11 SR0-21 Clem What are the "References Provided" for this question? All references are listed on the index in the binder of references.
12 SR0-6 Colton What plant mode am I in for the 4 given conditions? . Sufficient information has been given in the question to make that determination?
13 SR0-5 Clem What does FDST mean? Candidate found answer in references provided.
(floor drain sample tank) 14 R0-14 Smouse Did the RFPT A go to the low speed stop? Candidate advised to reread the question stem.
Sufficient information exists to answer the question.
Perry License Class 1-LOT-17 NRC 2017 Exam - Questions from candidates 2/16/2017 Pa2e 3 I IQ# I Candidate I The candidate asked. I The proctor answered. I 15 SR0-4 Clem What is a "leak sealant device"? It is a device used to seal a leak.