NRC-2014-0087, 2015 Point Beach Nuclear Plant Initial License Examination Proposed Examination Transmittal Letter

From kanterella
Revision as of 21:57, 14 February 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
2015 Point Beach Nuclear Plant Initial License Examination Proposed Examination Transmittal Letter
ML15076A525
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/06/2015
From: McNeil D R
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML14328A661 List:
References
NRC-2014-0087 50-266/15-301, 50-301/15-301
Download: ML15076A525 (2)


Text

NEXTera POINT BEACH December 29, 2014 NRC 2014-0087 Mr. Hironori Peterson, C hi e f Operations Branch U.S. Nuclear Regulatory Commis s ion 2443 Warrenville R o ad, Suite 210 Lisle, IL 60532-4352 Point Beach Nuclear Plant , Units 1 and 2 Dockets 50-2 66 and 50-301 Renewed License N o s. DPR-24 and D P R-27 Initial Operator Lic e nse Examination

Reference:

NRC to NextEra Energy Point Beach, LLC dated September 5, 2014 In accordance with the requirements listed in the referenced letter, NextEra Energy Point Beach, LLC (NextEra) is submitting the initia l license examination for the Point Beach Nuclear Plant. This submitta l is made in accordance with the provisions of NUREG-1021, "Operator Licensing Exam in ation Standards for Power Rea c tor s ," R e vi s ion 9 Supplement

1. The initial license examination s are scheduled for the weeks of F eb r ua ry 23 an d M a rch 2, 2015. T h e follo wing materi a ls a re e n cl o s ed:
  • O ne (1) F o rm ES 30 1-3 , O p e ratin g Exa m Qu a li t y C h ec k l i s t
  • One (1) F orm ES-3 01-4, S imul a t or Sce n a r io Q u a lity C h eck li st
  • T wo (2) Fo rm s ES-3 01-5, Tr a n s i ent an d Eve nt C h ec k list
  • Two (2) Fo r ms ES-301-6, Competencies Checklist
  • E l e v en (1 1) Ope r ationa l Job Performance M eas u res (JPMs)
  • Ni n e (9) Admi ni stra tiv e JP M s
  • Three (3) TR-AA-230-1003-F06 Forms, Simulator Exercise Guides, equivalent to F or m ES-D-2 Requi r ed Ope r a t or Ac t ions (one fo r each scenario)
  • O n e (1) ES 4 0 1-6, Written Exam Quality Checklist
  • O n e (1) RO Written Exam Ke y equivalent to Form ES-401-5 with Seventy Five (75) RO questions, a l ong with supporting procedures, and one (1) RO Written Exam (ready to give).
  • One (1) SRO Written Exam Key equivalent to Form ES-401-5 with Twenty F i ve (25) SRO questions, along with supporting procedures, and one (1) SRO Written Exam (ready to give). ENCLOSURE TO BE WITHHELD FROM PUBLIC DISCLOSURE UNTIL EXAMINATIONS ARE COMPLETE . NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 RECEI.-'"'

DEC 2 9 2014 U.S. Nuclear Regulatory Commission Page2 Pursuant to the provisions of NUREG-1021, Revision 9, Supplement 1, these materials shall be withheld from public disclosure until after the examinations are complete.

Please contact Mr. Randall Amundson at 920/755-6860 if you have questions regarding this submittal.

Very truly yours, NextEra Energy Point Beach, LLC Eric McCartney Site Vice President Enclosure